1305M423RNAAJ0004-PRICE PROPOSAL TEMPLATE (Final).xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 1305M423RNAAJ0004
About this file
This price proposal template outlines pricing requirements for the Pier Romeo Design-Build Recapitalization Project in North Charleston, South Carolina. The scope of work involves demolishing existing structures and constructing a dedicated pier, access ramps, floating dock, warehouse, seawall, and living shoreline to support berthing of NOAA ships. Pricing is requested for base design and construction services, marine demolition, sea wall construction, pier work including pilings and fendering, trestle work including pilings, gangway work including pilings, main site civil and utilities, warehouse construction, and living shoreline construction. Optional line items are included for the full pier scope as well as performance and payment bonds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PIER ROMEO RECAPITALIZATION PROJECT
North Charleston, South Carolina
1305M423RNAAJ0004
PRICE PROPOSAL TEMPLATE
| Line Item | Description | Quantity | Unit | Labor | Equipment | Material | Sub-Total | Total Price |
| 1 | BASE PRICE: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for Facility Design, Preconstruction Services, Marine Demolition, and Sea Wall Construction in accordance with the Statement of Work and 15% Design Concept documents. | 1 | LS | $0.00 | ||||
| Price to provide 100% design and engineering services required for the project including all optional items in accordance with the Statement of Work and 15% Design Concept documents. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Marine Demolition. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Sea Wall Construction. | 1 | LS | $0.00 | |||||
| Performance and Payment Bonds | 1 | LS | ||||||
| OPTIONAL CLINS: | ||||||||
| 2 | Optional CLIN: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for the Pier, Gangway, and Trestle including Fender Piles, Utilities, and all other items to provide a fully operational pier in accordance with the Statement of Work. | 1 | LS | $0.00 | ||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Pier Work including Piling, Fendering and applicable activities. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Trestle Work including Pilings and applicable activities. | 1 | LS | $0.00 | |||||
| Price for providing all work outlined in the Statement of Work and applicable attachments for Gangway work including Pilings and applicable activities. | 1 | LS | $0.00 | |||||
| Performance and Payment Bonds | 1 | LS |
| 3 | Optional CLIN: Total Price for itemized Main Site Civil and Shoreside Utilities in accordance with the Statement of Work. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS |
| 4 | Optional CLIN: Total Price for itemized Warehouse Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS |
| 5 | Optional CLIN: Total Price for itemized Small Vessel Floating Dock Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS |
| 6 | Optional CLIN: Total Price for itemized Living Shoreline Construction in accordance with the Statement of Work. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS |