1305M423RNAAJ0004-PRICE PROPOSAL TEMPLATE (Updated 4-12-23).xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 1305M423RNAAJ0004
About this file
This price proposal template and solicitation are for a design-build recapitalization project at Pier Romeo in North Charleston, South Carolina. The project involves demolishing existing structures and constructing a dedicated pier, access ramps, floating dock, warehouse, seawall, and living shoreline to support berthing of NOAA ships. A base CLIN and five optional CLINs are included for design and construction services. The base CLIN covers design, preconstruction, marine demolition and sea wall construction. Optional CLINs cover additional work for the pier, gangway, trestle, main site civil utilities, warehouse, small vessel float and living shoreline. Pricing is line item based with lump sums for each CLIN. The solicitation is full and open with a $55-65 million magnitude under NAICS code 237990. The small business size standard is $39.5 million. The issuing agency is the Department of Commerce National Oceanic and Atmospheric Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PIER ROMEO RECAPITALIZATION PROJECT
North Charleston, South Carolina
1305M423RNAAJ0004
PRICE PROPOSAL TEMPLATE
| Line Item | Description | Quantity | Unit | Labor | Equipment | Material | Sub-Total | Total Price |
| 1 | BASE CLIN: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for Facility Design, Preconstruction Services, Marine Demolition, and Sea Wall Construction in accordance with the Statement of Work and 15% Design Concept documents. | 1 | LS | $0.00 | ||||
| Price to provide 100% design and engineering services required for the project including all optional items in accordance with the Statement of Work and 15% Design Concept documents. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Marine Demolition. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Sea Wall Construction. | 1 | LS | $0.00 | |||||
| Performance and Payment Bonds | 1 | LS | $0.00 | |||||
| OPTIONAL CLINS: | ||||||||
| 2 | Optional CLIN: Total Price for itemized items below. All work for the NOAA Pier Romeo Recapitalization Project for the Pier, Gangway, and Trestle including Fender Piles, Utilities, and all other items to provide a fully operational pier in accordance with the Statement of Work. | 1 | LS | $0.00 | ||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Pier Work including Piling, Fendering and applicable activities. | 1 | LS | $0.00 | |||||
| Price to provide all work outlined in the Statement of Work and applicable attachments for Trestle Work including Pilings and applicable activities. | 1 | LS | $0.00 | |||||
| Price for providing all work outlined in the Statement of Work and applicable attachments for Gangway work including Pilings and applicable activities. | 1 | LS | $0.00 | |||||
| Performance and Payment Bonds | 1 | LS | $0.00 |
| 3 | Optional CLIN: Total Price for itemized Main Site Civil and Shoreside Utilities in accordance with the Statement of Work. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS | $0.00 |
| 4 | Optional CLIN: Total Price for itemized Warehouse Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS | $0.00 |
| 5 | Optional CLIN: Total Price for itemized Small Vessel Floating Dock Construction in accordance with the Statement of Work. Contractor shall exclude price for activities performed in another CLIN. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS | $0.00 |
| 6 | Optional CLIN: Total Price for itemized Living Shoreline Construction in accordance with the Statement of Work. | 1 | LS | $0.00 | $0.00 |
| Performance and Payment Bonds | 1 | LS | $0.00 |
TOTAL PRICE for BASE CLIN and Optional CLINs (2, 3, 4, 5 & 6) $0.00
| UNIT PRICING FOR CONTAMINATED SOIL | 1 | CY | $ - 0 |
| Contractor shall provide their per cubic yard (CY) cost for potential contaminated soil removal cost. Cost shall include, all construction, design, and procurement services to remove and dispose of potentially contaminated onsite soil at a Subtitle D Landfill. Including bringing back and placing imported fill material as required. THIS PER CY PRICE SHALL NOT BE INCLUDED IN OVERALL TOTAL PRICE for BASE CLIN and Optional CLINs (2, 3, 4, 5 & 6) AND IS INTENDED TO ESTABLISH A CY RATE SHOULD THIS ACTIVITY BE REQUIRED. |
File details come from the government source that posted it. Updated .