This is a Request for Quotes (RFQ) for construction services under a small business set-aside with the National Oceanic and Atmospheric Administration (NOAA). The solicitation (1305M326Q0332) seeks a firm-fixed-price contract for the Glider Lab Expansion Project at NMFS PIFSC located at 1845 Wasp Boulevard, Building 176, Honolulu, Hawaii 96818. The contractor must complete all work within 30 calendar days of receiving the Notice to Proceed. Quotes are due by July 28, 2026 at 1500 HST, with a mandatory site visit scheduled for July 23, 2026 at 9:00 AM HST at Joint Base Pearl Harbor-Hickam (JBPHH). Prospective offerors may submit questions or Requests for Information no later than 3:00 PM HST on July 24. The requirement is set aside exclusively for small businesses under NAICS code 236220 (commercial general construction).
This acquisition is subject to the Revolutionary FAR Overhaul (RFO) effective April 17, 2026, and incorporates numerous federal regulations including Davis-Bacon Act wage requirements (WD #HI20260001, dated May 27, 2026), Buy American construction materials provisions, and mandatory sexual assault and harassment prevention training. A bid guarantee equal to 100 percent of the bid price (or $100,000, whichever is less) is required, along with 100 percent performance and payment bonds after contract award. Evaluation criteria include Technical Approach and Capability, Price, and Past Performance. Quotes will be submitted electronically via email to Jenna Taulman (jenna.taulman@noaa.gov), with Kevin Wong designated as the Contracting Officer's Representative. The contract performance period begins upon Notice to Proceed and must be completed within 30 days thereafter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0332_Amd_0002.pdf | ||
| Sol_1305M326Q0332_Amd_0001.pdf | ||
| Attachment_2_Davis-Bacon_Act_WD___HI20260001_Rev_3.pdf | ||
| SOW_1305M326Q0332_-17July2026.pdf | ||
| Past_Performance_Questionnaire_1305M326Q0332.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
* Please review the entirety of this Request for Quotes (RFQ) and its attachments to ensure your eligibility for contract award.
** It is highly recommended that all offerors carefully review and comply with Revolutionary FAR Overhaul (RFO) Provisions: 52.212-1 - Instructions to Offerors—Commercial Products and Commercial Services, 52.212-2 - Evaluation—Commercial Products and Commercial Services, 52.236-2 - Differing Site Conditions, and 52.236-3 Site Investigation and Conditions Affecting the Work. These provisions contain very important information related to this RFQ.
1. Revolutionary FAR Overhaul (RFO) Effective April 17, 2026 applies to this acquisition.
2. This requirement is set aside for Small Businesses under NAICS: 236220
3. Site Visit. A site visit will be hosted starting at 9:00 AM HST on Thursday, July 23. Attending the site visit is highly recommended but not required; however, an RSVP is required for attendance. Interested vendors are limited to a maximum of two (2) representatives per company. RSVP by email to Jenna Taulman and Kevin Wong at jenna.taulman@noaa.gov and kevin.wong@noaa.gov - NO LATER than 9:00 AM HST on Wednesday, July 22.
Site visit attendees with existing base access will receive meetup instructions with their RSVP email. Again, RSVP by email to Jenna Taulman and Kevin Wong at jenna.taulman@noaa.gov and kevin.wong@noaa.gov - NO LATER than 9:00 AM HST on Wednesday, July 22.
Site visit attendees without existing base access must carpool with a NOAA representative, Mr.
Kevin Wong (phone 808.725.5433), and therefore will meet at an off-base location (location title/address provided with the RSVP) no later than 9:00 AM HST. Site visit attendees must bring a Real ID. Vendors must provide proper identification and any attendee missing a Real ID will be denied access due to Joint Base Pearl Harbor-Hickam (JBPHH) local policy. If base access is denied for any reason, NOAA is not obligated to provide another site visit date/time.
While a site visit is HIGHLY encouraged, quotes are allowable from ALL interested vendors, including those who were denied access and/or those who do not attend the site visit. It is the contractor's responsibility to review 'RFO 52.236-3 Site Investigation and Conditions Affecting the Work' included in this solicitation. In no event shall failure to inspect the site constitute grounds for a claim, upward adjustment, or change order after contract award.
No questions shall be asked during the site visit, instead they should be submitted electronically in accordance with (IAW) CAR Provision 1352.215-72 of this RFQ. Even if provided in another form, only the question responses included in the amendment to the solicitation will govern performance of the contract.
4. Solicitation Questions and Answers, Requests for Information (RFIs), (Inquiries). Offerors must submit all inquiries in accordance with (IAW) CAR Provision 1352.215-72 of this RFQ no later than 3:00 PM HST on Friday, July 24.
5. Quote Submission Due Date. IAW RFO Provision 52.212-1 of this RFQ, quotations shall be submitted electronically, via email, directly to jenna.taulman@noaa.gov no later than the date and time specified in Page 1, Block 13 of the SF 1442.
6. Bonding. A Bid Guarantee is required. Both Performance and Payment Bonds will be required after award of contract.
7. Liquidated Damages. Not applicable
8. Davis Bacon Act Wage Determination. Attachment 2 - DBA WD - HI20260001 May 27, 2026
9. Solicitation instructions and evaluation criteria for quotes can be found in the following provisions of this RFQ: RFO Provisions 52.212-1 and 52.212-2.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
143071-26-0033
WAD-SAP
7600 Sand Point Way NE
SEATTLE WA 98115
WAD-SAP-S
JENNA TAULMAN
107/17/2026
1305M326Q0332
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
- Statement of Work 1305M326Q0332
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 30 calendar days and complete it within ________________ ________________ calendar days after receiving
07/28/2026
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
WAD-SAP
7600 Sand Point Way NE
SEATTLE WA 98115
WAD-SAP-S
JENNA L. TAULMAN
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 39
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1305M326Q0332
Delivery: 30 Days After Notice to Proceed
0001 Glider Lab Expansion Project in accordance with the Statement of Work
Product/Service Code: Z2JZ
Delivery Location Code: FT710031
NMFS PIFSC OPRTN MGMT/INFO DIV
F/PIC1 NAT'L MARINE FISH SVC
1845 WASP BLVD, BLDG 176
HONOLULU HI 96818-5007 USA
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1305M326Q0332 BASE
Section II - Supplies or Services and Price/Costs Section IX - Contract Clauses Section X - List of Attachments Section XII - Instructions, Conditions, and Notices
Section II - Supplies or Services and Price/Costs
CLIN List
Item Number Description Quantity Unit Unit Price Amount
Glider Lab Expansion Project in accordance with the Statement of Work Award Type: Firm-fixed-price Product/Service Code: Z2JZ Requisition No: 143071-26-0033
Section IX - Contract Clauses
Clauses Incorporated by Reference Clause Number Clause Title
52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel.
(JAN 2011)
52.204-13 SYSTEM FOR AWARD MANAGEMENT-MAINTENANCE.
(OCT 2018) (Deviation JAN 2026)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED,
SUSPENDED, PROPOSED FOR DEBARMENT, OR
VOLUNTARILY EXCLUDED. (JAN 2025) (Deviation JAN 2026)
52.209-10
PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS. (NOV 2015) (Deviation JAN 2026)
52.212-4
TERMS AND CONDITIONS-COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES. (NOV 2023) (Deviation JAN 2026)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE. (NOV
2020) (Deviation JAN 2026)
52.222-3 Convict Labor. (JUN 2003) (Not for DOC Use)
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) (Not for DOC Use)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS. (AUG
2018) (Deviation JAN 2026)
52.222-7 Withholding of Funds. (MAY 2014) (Not for DOC Use)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) (Not for DOC Use)
52.222-11 SUBCONTRACTS (LABOR STANDARDS). (MAY 2014)
(Deviation JAN 2026)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988) (Not for DOC Use)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES AND
REMEDIES. (JAN 2025) (Deviation JAN 2026)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUN 2020)
(Deviation JAN 2026)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES.
(JUN 2020) (Deviation JAN 2026)
52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUN 2020)
(Deviation JAN 2026)
Clause Number Clause Title
52.222-50 COMBATING TRAFFICKING IN PERSONS. (OCT 2025)
(Deviation JAN 2026)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (JAN 2025)
(Deviation JAN 2026)
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (JAN 2022)
52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022) (Not for DOC Use)
52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) (DEVIATION April 2026)
52.223-5 Pollution Prevention and Right-to-Know Information.
(MAY 2024)
52.223-23 SUSTAINABLE PRODUCTS AND SERVICES. (MAY 2024)
(Deviation JAN 2026)
52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving. (MAY 2024)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997)
52.228-5 Insurance - Work on a Government Installation. (JAN 1997)
52.228-11 Individual Surety-Pledge of Assets. (FEB 2021) 52.228-14 Irrevocable Letter of Credit. (NOV 2014)
52.232-5 Payments Under Fixed-Price Construction Contracts.
(MAY 2014)
52.232-18 Availability of Funds. (APR 1984) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023)
52.233-1 DISPUTES. (MAY 2014) (Deviation JAN 2026)
52.233-3 PROTEST AFTER AWARD. (AUG 1996) (Deviation JAN 2026)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM.
(OCT 2004) (Deviation JAN 2026)
52.236-5 MATERIAL AND WORKMANSHIP. (APR 1984) (Deviation
JAN 2026)
52.236-7 PERMITS AND RESPONSIBILITIES. (NOV 1991) (Deviation
JAN 2026)
52.236-8 OTHER CONTRACTS. (APR 1984) (Deviation JAN 2026)
52.236-9
PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS. (APR
1984) (Deviation JAN 2026)
52.236-10 OPERATIONS AND STORAGE AREAS. (APR 1984)
(Deviation JAN 2026)
52.236-12 CLEANING UP. (APR 1984) (Deviation JAN 2026)
Clause Number Clause Title 52.236-17 Layout of Work. (APR 1984) (Deviation JAN 2026)
52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS. (Deviation
JAN 2026)
52.242-14 Suspension of Work. (APR 1984)
52.243-5 CHANGES AND CHANGED CONDITIONS. (APR 1984)
(Deviation JUN 2025)
52.244-6
SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES. (OCT 2025) (Deviation JAN 2026)
1352.201-70 Contracting Officer's Authority. (MAR 2010) 1352.209-71 Limitation of future contracting. (APR 2010) 1352.209-72 Restrictions against disclosure. (APR 2010) 1352.209-73 Compliance with the laws. (APR 2010) 1352.209-74 Organizational conflict of interest. (APR 2010)
DOC 2026 REAL ID ENFORCEMENT REAL ID Act Enforcement
As of January 1, 2026, all Department of Commerce–owned or leased facilities will only accept a REAL ID-compliant form of identification. Visitors with state-issued identification must now present a REAL ID or a different form of government-issued photo identification, such as: A passport, an Enhanced Driver's License, or a federal employee, military, or veteran identification card (this list is not all-inclusive).
Additional information about the Department’s implementation plan may be found at https://www.commerce.gov/OSY/REAL-ID .
RFO 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JAN 2025) (Deviation
JAN 2026)
(a) Definitions. As used in this clause-
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [X] is, [ ] is not a small business concern under NAICS Code 236220 assigned to contract number TBD.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(4) Economically disadvantaged women-owned small business (EDWOSB) joint venture.
The Contractor represents that it [ ] is,[ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __ .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(6) HUBZone joint venture eligible under the HUBZone Program.[ Complete only if the offeror is a HUBZone small business concern. ] The offeror represents, as part of its offer, that It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _____.] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [Contractor to sign and date and insert authorized signer's name and title.______________________]
(End of clause)
RFO 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS. (OCT 2022) (Deviation JAN 2026)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
none
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components. (1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph
(d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description
Unit of measure Quantity Price (dollars)*
Item 1:
Foreign construction material. ________ ________ ________
Domestic construction material. ________ ________ ________
Item 2:
Foreign construction material. ________ ________ ________
Domestic construction material. ________ ________ ________
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
RFO 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)
(a) Definitions. As used in this clause -
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the
Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of clause)
RFO 52.236-2 DIFFERING SITE CONDITIONS. (APR 1984) (Deviation JAN 2026)
(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of
(1) Latent physical conditions or subsurface conditions at the site which differ materially from those indicated in this contract; or
(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
(b)(1) The Contracting Officer will investigate the site conditions promptly after receiving such a notice.
(2) If the conditions materially so differ and cause an increase or decrease in the Contractor's cost of, or the time required for, performing any part of the work under this contract an equitable adjustment must be made under this clause.
(c) No request for an equitable adjustment to the contract under this clause will be allowed, unless the Contractor has given the written notice required.
(d) No request for an equitable adjustment to the contract for differing site conditions will be allowed if made after final payment under this contract.
(End of clause)
RFO 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK. (APR 1984) (Deviation
JAN 2026)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including-
(1) Conditions bearing upon transportation, disposal, handling, and storage of materials;
(2) The availability of labor, water, electric power, and roads;
(3) Uncertainties of weather, river stages, tides, or similar physical conditions at the site;
(4) The conformation and conditions of the ground; and
(5) The character of equipment and facilities needed preliminary to and during work performance.
(b) The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(c) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
(End of clause)
RFO 52.246-21 Warranty of Construction. (MAR 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of -
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall -
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(End of clause)
RFO 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide
(End of clause)
RFO 52.252-6 Authorized Deviations in Clauses. (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter
1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.
(b) The use in this solicitation or contract of any Commerce Acquisition Regulation (48 CFR 13) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation.
(End of clause)
CAR 1352.201-72 Contracting Officer's Representative (COR). (APR 2010)
(a) Kevin Wong is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
Will insert at time of award
Phone Number: 808.725.5433
E-mail: kevin.wong@noaa.gov
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
(End of clause)
CAR 1352.246-70 Place of acceptance. (APR 2010)
(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.
(b) The place of acceptance will be:
NOAA Inouye Regional Center 1845 Wasp Boulevard., Bldg. #130 Honolulu, Hawaii 96818
(End of clause)
CAR 1352.270-70 Period of performance. (APR 2010)
(a) The period of performance of this contract shall be within 30 days of Notice to Proceed.
NOAA Acquisition Manual 1330-52.222-70 NOAA SEXUAL ASSAULT AND SEXUAL HARASSMENT
PREVENTION AND RESPONSE POLICY (MAY 2018)
In accordance with NOAA Administrative Order (NAO) 202-1106, NOAA Sexual Assault and Sexual Harassment Prevention and Response Policy, it is the policy of NOAA to maintain a work environment free from sexual assault and sexual harassment. NOAA prohibits sexual assault and sexual harassment by or of any employee, supervisor, manager, contractor, vendor, affiliate, or other individual with whom NOAA employees come into contact by the virtue of their work for NOAA.
(a) Definitions.
Contractor Employees - The term “contractor employees,” as used in this solicitation and contract language, refers to employees of the prime contractor or its subcontractors, affiliates, consultants, or team members.
Sexual Assault - The term sexual assault, as used in this solicitation and contract language, means any conduct proscribed by state or federal sexual abuse laws, including, but not limited to, those defined in chapter 109A of title 18 of the U.S. Code (sexual abuse), and assaults committed both by offenders who are strangers to the victim and by offenders who are known or related by blood or marriage to the victim.
Sexual Harassment - As defined by the Equal Employment Opportunity Commission, sexual harassment is a form of sex discrimination that violates Title VII of the Civil Rights Act of 1964. It includes unwelcome sexual advances, requests for sexual favors, and other verbal, non-verbal, or physical conduct of a sexual nature when any of the following are true:
● Submission to such conduct is made either explicitly or implicitly as a term or condition of an individual's employment;
● Submission to or rejection of such conduct by an individual is used as the basis for employment decisions affecting such individual;
● The conduct unreasonably interferes with an individual's work performance or creates an intimidating, hostile, or offensive working environment.
The main characteristics of sexual harassment are that the harasser's conduct is targeted against the recipient’s sex, gender identity, or sexual orientation, and is unwelcome to the recipient. It may include, but is not limited to: offensive jokes, slurs, epithets or name calling, undue attention, physical assaults or threats, unwelcome touching or contact, intimidation, ridicule or mockery, insults or put-downs, constant or unwelcome questions about an individual's identity, and offensive objects or pictures.
(b) Requirements.
1. It is the responsibility of the contractor to ensure that contractor employees maintain the highest degree of conduct and standards in performance of the contract. In support of this, NOAA urges its contractors to develop and enforce comprehensive company policy addressing sexual assault and sexual harassment.
2. The contractor shall include wording substantially the same as this solicitation and contract language in every subcontract so that it is binding upon each subcontractor.
3. If a contractor employee observes or is the object of sexual assault or sexual harassment, he or she is highly encouraged to report the matter, as soon as possible, to their immediate supervisor, the COR, subset of the COR (e.g. Task Manager or Assistant COR), or contracting officer (CO) if a COR is not assigned to the contract. The contract employee may also contact the NOAA Civil Rights Office to obtain guidance on reporting instances of sexual assault or sexual harassment. If deemed necessary, the contractor employee may also report such instances to local law enforcement. In the case where the incident occurs while performing at a remote location, such as at sea or in the field (at a field camp or other isolated location) where the above referenced individuals are unavailable, the contractor employee should follow the reporting procedure set forth in NAO 202-1106, Section 6.07, Reporting from Remote Locations.
4. Swift reporting allows NOAA and the contractor to take the appropriate measures to ensure that offensive behavior stops and the complainants’ needs are addressed.
5. The COR (if assigned), CO, and contractor, where applicable, will work together to ensure appropriate action is taken in accordance with applicable laws…