This document is Amendment 0002 to a Request for Quote (RFQ) for the NOAA Glider Lab Expansion project (Solicitation Number 1305M326Q0332), issued by the Department of Commerce's Western Administrative Division (WAD-SAP) located in Seattle, Washington. The amendment, effective July 17, 2026, serves to provide responses to fourteen Requests for Information (RFIs) received from contractors and to extend the RFQ deadline. The new quote submission deadline is August 13, 2026 at 3:00 PM Hawaii Standard Time.

The RFI responses address construction and renovation work in Rooms 2108A, 2108B, 2109, 2110, and 2111 at a NOAA facility. Key clarifications include: the wall between rooms 2108A and 2109 extends above ceiling tiles; NOAA will remove misc supplies, equipment, tote boxes, and wall hangings, while the contractor is responsible for relocating free-standing shelves, lockers, and a fireproof file cabinet; wall-attached shelving and cabinets must be removed and disposed of by the contractor; electrical outlets being removed must be terminated according to code; the eyewash station must remain functional; the existing sink in Room 2109 should be removed and disposed of by the contractor; and outlets must meet building code requirements. The vehicle gate can accommodate vehicles up to 13 feet wide. The new door between rooms 2109 and 2110 shall be offset closer to room 2111 to maximize wall space. Rooms 2109 and 2111 will be vacant during construction, while NOAA workers will actively use rooms 2108A, 2108B, and part of 2110.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

JENNA L. TAULMAN

See continuation page

WAD-SAP

7600 Sand Point Way NE

SEATTLE WA 98115

WAD-SAP-S

1305M326Q0332

07/17/2026

07/17/2026

1 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M326Q0332/0002

The purpose of Amendment 0002 is to provide answers to all RFIs received, and extend the

RFQ deadline date and time. Quotes are now due by August 13, 2026 at 3:00 PM HST.

RFI # Date Recv'd RFI Date Sent to

Client Client/SME Response Response Date

Date sent to Ktrs

1 07/31/26 SOW, Figure 2 (page 5) - How far does the wall in Room 2108A extend up above the ATC?

08/03/26 The wall between rooms 2108A and 2109 extends above the ceiling tiles. See Figure RFI.1 for a photo of the space above the ceiling tiles.

8/4/2026

2 07/31/26 SOW, Para. 3.3, Figures 4 & 5 (page 6 & 7) - Will the Government be removing the shelving, tubs, wall hangings, etc. or will that the Contractor's responsibility? Is it all to be disposed of?

08/03/26

The misc supplies, equipment, and tote boxes will be removed by NOAA. The wall hanging (painting) will be removed by NOAA. The contractor will be responsible for relocating the (empty) free-standing shelves and (empty) lockers to another part of room 2109, 2110, or 2108 so that they are away from the immediate construction area. A heavy-duty fireproof file cabinet (safe) is also located in the vicinity of the construction site in room 2110. This file cabinet is empty. The contractor will be responsible for moving this item to another part of the room, if necessary, so that it is out of the way of the construction activity.

8/4/2026 8/5/2026

3 07/31/26 SOW, Para. 7.1 General - Can the Government please provide a map of the haul route/gate access point for Contractor personnel near Building 130 during construction? Also, what is the width of the gate opening?

08/03/26 See Figure RFI.2 for an overview map of vehicle access. The vehicle gate can accommodate vehicles up to 13 feet wide.

8/4/2026 8/5/2026

4 07/31/26 SOW, Para. 7.8 General - Please confirm whether or not there will be NOAA workers actively operating in the rooms during construction.

08/03/26

Room 2109 and 2111 will be vacant. There will be NOAA workers actively utilizing Rooms 2108A and 2108B and part of 2110. We will make every effort to work with the contractor's schedule to minimize NOAA personnel in these rooms especially during very active tasks such as wall demolition.

8/4/2026 8/5/2026

5 07/31/26 Contracting - Can the proposal due date please be extended to 14 August to allow for competitive pricing?

08/03/26 An extension will be provided with the amendment. 8/3/2026 8/5/2026

6 07/31/26 Rm 2108 - Physiology Lab - Please confirm that the wall shelving is to be removed and disposed of by the contractor.

08/03/26 Any shelving or cabinets that are ATTACHED to the wall shall be removed and disposed of by the contractor.

8/4/2026 8/5/2026

7 07/31/26 Rm 2108 - Physiology Lab - For Room 2108, should power be completely disconnected from the electrical panel, or should the circuits be terminated in a junction box above the ceiling?

08/03/26 The outlets that are being removed from room 2108A should be terminated according to code. 8/4/2026 8/5/2026

8 07/31/26

Rm 2108 - Physiology Lab - Eye Wash Station – the wall behind the eye wash station has the water line for the two-compartment sink. Should the eyewash station line be rerouted or permanently capped? If it is to be capped, is ProPress acceptable, or is a brazed connection needed?

08/03/26 Eyewash station is to remain functional. 8/4/2026 8/5/2026

9 07/31/26 Rm 2109 - Seal & Turtle Food Prep - Does this electrical outlet need to be operational to connect the dehumidifier?

08/03/26 The electrical outlet on the wall between room 2109 and 2108A is not needed for the dehumidifier.

8/4/2026 8/5/2026

10 07/31/26 Rm 2109 - Seal & Turtle Food Prep - Will the existing sink be reused? If so, where should it be relocated?

08/03/26 The sink will not be reused and should be removed and properly disposed of by the contractor. 8/4/2026 8/5/2026

11 07/31/26 Rm 2109 - Seal & Turtle Food Prep - Will all of the metal shelves not attached to the walls need to be moved out of the room? Please confirm if it is the contractor’s responsibility to relocate the free-standing metal shelving

08/03/26 See the response to #2. 8/4/2026 8/5/2026

Requests For Information (RFIs) Project Title: NOAA Glider Lab Expansion

RFQ/RFP Number: 1305M326Q0332

12 07/31/26 Rm 2109 - Seal & Turtle Food Prep - The electrical outlet behind the refrigerator may need to be relocated. Please confirm whether this outlet should be relocated and provide a new location

08/03/26 The number of outlets in room 2109 should meet or exceed building codes. An outlet in room 2109 on the wall separating 2109 from 2111 should be placed in a readily accessible location.

8/4/2026 8/5/2026

13 07/31/26 Small Boat Room - The door will be installed near the right-side wall where the locker and safe are currently located. Who is responsible for moving these items?

08/03/26

See Figure RFI.3 for details about the location of the door between rooms 2109 and 2110. Note that the new door shall be offset so that it is closer to room 2111 to provide as much room as feasible along the wall adjacent to the main warehouse space. For movement of free-standing items in the room see the response to #2.

8/4/2026 8/5/2026

14 07/31/26 Will the Government consider an extension to the current proposal deadline to allow for thorough review and incorporation of the RFI responses?

08/03/26 See the response to #5. 8/3/2026 8/5/2026

Figure RFI.1

Visualization of wall above ceiling tiles 8/4/2026

The following photos show that the wall between rooms 2109 and 2108A extends above the ceiling tiles.

Figure RFI.2 Vehicle Gate

8/4/2026

The following photos show the path for a vehicle to access the construction site. The vehicle gate can accommodate vehicles up to 13 feet wide.

Figure RFI.2A: Map

Figure RFI.2B: The vehicle gate can accommodate vehicles up to 13 feet wide.

Figure RFI.3

Location of new door between rooms 2109 and 2110 8/4/2026

The new door between rooms 2109 and 2110 shall be offset so that it is closer to room 2111. See figure below. This is to maximize available wall space for future shelving or lockers that will be placed along the wall abutting the main warehouse.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .