Attachment 1 - Statement of Need (SON) Revision 1.pdf
PDF 123 KB Posted
- Attached to
- Compressed Gases Federal contract opportunity
- Solicitation number
- 1305M326Q0071
About this file
Summary of Statement of Need – Compressed Gases
This Statement of Need (SON) outlines NOAA's Office of Oceanic and Atmospheric Research (OAR) Global Monitoring Laboratory (GML) requirement for ongoing supply and delivery of compressed gas cylinder mixtures to its facility in Boulder, Colorado. The contractor shall supply and deliver fourteen distinct gas types with specified purity levels, cylinder capacities, fill pressures, and CGA fittings. These gases include Balloon-Grade Helium (provided in NOAA-owned 200 cu ft cylinders), Low-Grade Hydrogen, Research-Grade Helium, UHP Nitrogen, Ultra-Zero Air, Welding Grade Argon and Oxygen, specialized mixtures (CO2 in Air, CO2 in Argon, Oxidizer, P5), UHP Research Grade Hydrogen, and trace gas standards (Nitric Oxide, Sulfur Dioxide, and high-concentration Nitric Oxide) with blend tolerances of ±10% for all mixtures. All gases except the balloon-grade cylinders shall be provided as rental cylinders. Cylinders must be clearly labeled with status tags indicating Full, In Use, or Empty condition.
Deliveries shall occur on an as-needed basis with authorization provided at least two weeks in advance, with regular weekly delivery windows Monday through Friday. The contractor must deliver authorized gases within two weeks of receiving authorization and must coordinate with GML contacts in advance of each delivery. Empty cylinders must be picked up within two weeks of request, with no rental fees charged for wait times exceeding two weeks. All deliveries shall be made to the David Skaggs Research Center (DSRC), Building 22 at 325 Broadway, Boulder, Colorado 80305, accompanied by detailed delivery tickets. Delivery drivers must obtain required documentation from the Government within five days and comply with all federal property security and safety regulations, including a prohibition on smoking during delivery or within 50 feet of the loading dock.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1305M326Q0071_Amd_0001.pdf | ||
| RFQ 1305M326Q0071 Industry Questions-Answers.pdf | ||
| Attachment 3 - Gas Sample Verification.xlsx | XLSX spreadsheet | |
| RFQ (CSS) 1305M326Q0071.pdf | ||
| Attachment 1 - Statement of Need (SON).docx | DOCX document | |
| Attachment 2 - Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED (SON)
COMPRESSED GASES
Revision 1, 6 April 2026
1. INTRODUCTION
1.1. Purpose: The purpose of this SON is to provide the requirement details for fulfilling the ongoing need for the supply and delivery of compressed gas cylinder mixtures to the National Oceanic and Atmospheric Administration (NOAA) Office of Oceanic and Atmospheric Research (OAR) Global Monitoring Laboratory (GML) facility in Boulder, CO.
1.2. Scope: The scope of this SON includes the minimum specifications for all of the required gases, estimated quantities of the required gases, delivery requirements, and other requirements. The contractor shall provide all supplies, equipment, and labor necessary to provide for the supply and delivery of compressed gases as outlined in this SON.
2. REQUIREMENTS
2.1. General: The contractor shall be responsible for the supply and delivery of compressed gases with the required specifications in Table 2.1.
Table 2.1
Description Specifications
Ballon-Grade Helium
Provided in NOAA-owned and labeled high-pressure steel cylinders, 200 cubic feet (cu ft) capacity
Have a minimum fill pressure of 2000 psi Have standard CGA fittings
Low-Grade Hydrogen Have a minimum fill pressure of 2000 psi Have standard CGA fittings
Research-Grade Helium Have N2 concentrations below 3% and O2 concentrations below 2% relative to mass 69 (respectively) as measured by GCMS at NOAA lab Have standard CGA fittings
UHP Nitrogren
Meet 99.999% purity specs Supplied in minimum 200 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA fittings
Ultra-Zero Air
Meet 99.999% purity specs Supplied in minimum 200 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA fittings
Welding Grade Argon Supplied in minimum 80 cu ft
Welding Grade Oxygen Supplied in minimum 80 cu ft
CO2 in Air 350 400 ppm CO2 balance in ultra zero air. Blend tolerance +-10% of target.
Have standard CGA 590 fittings
CO2 in Argon
Contain 0.25% CO2 in Ar. Blend tolerance +-10% of target. Mixture blended from UHP Research Grade (99.999% purity) components.
Supplied in minimum 200 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi
Have standard CGA fittings
Oxidizer
Contain 40% O2 in N2 balance. Blend tolerance +-10% of target. Mixture blended from UHP Research Grade (99.999% purity) components..
Supplied in minimum 200 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA fittings
UHP Research Grade Hydrogen
Meet 99.999% purity specs Supplied in minimum 80 cu ft capacity high pressure cylinders Have a minimum fill pressure of 2000 psi.
Have standard CGA fittings
P5
Contain 5% CH4 in Ar balance suitable for Electron Capture Detector (ECD) applications. Mixture blended from UHP components.
Supplied in minimum 200 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA fittings
Nitric Oxide
Contain 10ppmv (Nitric Oxide +-10% of target) in Nitrogen Balance Meet EPA protocol regulations Supplied in minimum 150 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA-660 fittings
Sulfur Dioxide (SO2) in Nitrogen
Contain 10ppmv (Nitric Oxide Sulfur Dioxide +-10% of target) in Nitrogen Balance
Meet EPA protocol regulations Supplied in minimum 150 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA-660 fittings
Nitric Oxide (NO) High Concentration in
Nitrogen
Contain 10,000ppmv (Nitric Oxide +-10% of target) in Nitrogen Balance Supplied in minimum 150 cu ft capacity high pressure cylinder Have a minimum fill pressure of 2000 psi Have standard CGA fittings
2.1.1. The contractor shall provide rental cylinders except for the balloon-grade cylinders owned by GML.
2.1.2. The contractor shall ensure cylinder caps are attached with tags clearly indicating a status of Full, In
Use, or Empty.
3. DELIVERIES:
3.1. General. Deliveries shall only occur on an as-needed basis after receiving authorization from an authorized individual. The Government will provide authorized requests at least 2 weeks in advance of desired delivery date. Regular deliveries occur weekly on Monday through Friday.
3.2. Coordination. The contractor shall coordinate with the GML contacts in advance of each delivery to arrange delivery and ensure personnel are on site.
3.3. Delivery Lead Time. The contractor shall provide deliveries of the gases listed in Table 2.1 to the GML site within 2 weeks of receiving authorization.
3.4. Pickup Lead Time. The contractor shall provide pickups of empty gas cylinders within 2 weeks of pickup request; longer wait times beyond 2 weeks shall not incur rental fees.
3.5. Place of Delivery: The contractor shall make deliveries at the Building 22 North Loading Dock or the DSRC
Building South Loading Dock at the following address:
David Skaggs Research Center (DSRC) Building 22 325 Broadway Boulder, CO 80305
Phone (receiving): 720-475-3010
3.6. Delivery Tickets. The contractor shall ensure all deliveries are accompanied by a delivery ticket. Delivery tickets shall include the following information:
Name of supplier Contract Number Full name of the Government authorized individual(s) Government Group Date and time of delivery Itemized description of goods delivered (e.g., type of gases, quantities, for whom, if multiple authorizations are included in single delivery, etc.)
Full description of gas cylinders picked-up
4. SECURITY & SAFETY:
4.1. Delivery Driver. The contractor shall ensure delivery drivers have all required documentation that provides authorization from the Government to enter the Boulder Campus.
4.1.1. Documentation. The contractor shall ensure delivery drivers documentation is completed within five days after receiving the documentation requirements from the Government for the Boulder Campus delivery entry. The Government will provide documentation requirements within five days after issuance of Government authorization. The Government will notify the contractor if any driver is determined to be unauthorized for entering the Boulder Campus at least one business day prior to the scheduled delivery. Any changes to the completed delivery driver documentation (i.e., a new driver) must be provided with the accompanying documentation no more than three days before the scheduled delivery.
4.1.2. Entry Requirement Changes. The Government will promptly notify the contractor of any changes to the documentation requirements for the Bounder Campus. The contractor shall provide revised documentation within five days of notification and ensure delivery driver documentation is complete and accurate prior to delivery.
4.2. All rules, regulations, and laws concerning safety and security must be followed at all times on Federal property. No smoking during the delivery nor within 50 feet of the loading dock.
| 350 400 ppm CO2 balance in ultra zero air. Blend tolerance +-10% of target. |
| Have standard CGA 590 fittings |
File details come from the government source that posted it. Updated .