Fairweather_Price_Schedule_(12July18_FINAL).xlsx

XLSX spreadsheet 63 KB Posted

Attached to
Drydock Repair Services for NOAA Ship Fairweather, Washington Region
Solicitation number
1305M318QNMAN0028
Issued by

About this file

Price Schedule

View the file

Other files

File Type Posted
2009,_Asbestos_Assesment_(Argus_Pacific)_-FA.pdf PDF
Amendment_0008_final.pdf PDF
Amendment_0007_final.docx DOCX document
Amendment_0006.docx DOCX document
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.docx DOCX document
Amendment_0001.docx DOCX document
Attachment_1,_Subcontractor_Consent_Form_for_Release_of_Past_Performance_Info.docx DOCX document
Document_1_Clauses_and_Provisions.pdf PDF
Document_2,SOW.pdf PDF
Combined_Synopsis_Solicitation_RFQ.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ1

Item No.Supplies/Services DescriptionQuantityUnitUnit PriceAmountIGEMarisco% Diff IGEHistorical*% Diff Historical*
0001Work Requirements

(See schedule notes below)

(I). To Be Determined (TBD) man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LS$TBD$TBD$65.00$110.0069.23%$93.5017.65%
(II). TBD man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%$126.5021.74%
(III). TBD man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%$137.5020.00%
Material/Subcontractor markup rate of _____% multiplied by $TBD= markup cost of $TBD.

Total Estimated Cost= Total Labor Cost + $TBD +

Markup cost=$TBD20.00%10.00%-50.00%10.00%0.00%
0002Temporary Services Daily Rate (Reference CAR 1352.271-89)TBDDY$_____$_____$2,232.00$8,371.57275.07%$3,528.49137.26%
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$_____$1,470.00

*Historical pricing is based on a recent (awarded 31 January 2017) drydock contract, AB-133M-17-CN-0026, also awarded to Marisco for work at its facilities in Hawaii. Temporary services were treated as one lump sum (a unit of "each") and the total value was $45,870.39. The period of performance was from 1 February 2017-13 February 2017, or 13 days total. Therefore, $45,870.39/13 days equals a price per day of approximately $3,528.49.

Initial IDIQ

Item No.Supplies/Services DescriptionQuantityUnitUnit PriceAmountIGEMarisco% Diff IGE
0001Work Requirements

(See schedule notes below)

(I). To Be Determined (TBD) man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LS$TBD$TBD$65.00$110.0069.23%
(II). TBD man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%
(III). TBD man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%
Material/Subcontractor markup rate of _____% multiplied by $TBD= markup cost of $TBD.

Total Estimated Cost= Total Labor Cost + $TBD +

Markup cost=$TBD20.00%10.00%-50.00%
0002Temporary Services Daily Rate (Reference CAR 1352.271-89)TBDDY$_____$_____$2,232.00$8,371.57275.07%
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$_____$2,000.00$1,470.00-26.50%

Pre-Neg IDIQ

Item No.Supplies/Services DescriptionQuantityUnitUnit PriceAmountIGEMarisco% Diff IGEHistorical*% Diff Historical*Historical**% Diff Historical**
0001Work Requirements

(See schedule notes below)

(I). To Be Determined (TBD) man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LS$TBD$TBD$65.00$110.0069.23%$164.00-32.93%$157.00-29.94%
(II). TBD man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%$225.00-31.56%$215.00-28.37%
(III). TBD man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%$225.00-26.67%$250.00-34.00%
Material/Subcontractor markup rate of _____% multiplied by $TBD= markup cost of $TBD.

Total Estimated Cost= Total Labor Cost + $TBD +

Markup cost=$TBD20.00%10.00%-50.00%10.00%0.00%10.00%0.00%
0002Temporary Services Daily Rate (Reference CAR 1352.271-89)TBDDY$TBD$TBD
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$_____$2,000.00$1,470.00-26.50%$818.4079.62%

*Historical pricing is based on a recent (awarded 31 January 2017) dockside contract, AB-133M-15-CQ-0033, also awarded to Marisco for work at its facilities in Hawaii. The Option Period II rates best align with the time period for this acquisition. The period of performance was from 1 February 2017-13 February 2017, or 13 days total. Therefore, $45,870.39/13 days equals a price per day of approximately $3,528.49.

**Historial pricing is based on Contract AB-133M-15-CQ-0021 (Option Period I, 1 June 2016-31 May 2017), place of performance unknown, drydock/dockside. (FYI-includes temp services rate of $1500)

Initial T0001

IGEMarisco% Difference IGEHistorical*% Diff Historical*
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
3.1Temporary Services27DYORF$2,232.00$60,264.00$8,371.57$226,032.39275.07%275.07%$3,528.49137.26%*Historical pricing is based on a recent (awarded 31 January 2017) drydock contract, AB-133M-17-CN-0026, also awarded to Marisco for work at its facilities in Hawaii. Temporary services were treated as one lump sum (a unit of "each") and the total value was $45,870.39. The period of performance was from 1 February 2017-13 February 2017, or 13 days total. Therefore, $45,870.39/13 days equals a price per day of approximately $3,528.49.
3.2Drydocking and Routine Drydock Work1JBORF$106,480.00$91,980.57-13.62%
3.3Bow and Stern Thruster Maintenance1JBORF$52,540.00$81,761.2855.62%
3.4Shell Plate Repair1JBORF$22,640.00$20,820.77-8.04%
3.5Underwater Hull Spot Preservation & Coating1JBORF$26,620.00$32,526.9222.19%
3.6Caterpillar D398 40K Overhaul – SSDGs #1 & #21JBORF$291,200.00$417,448.8343.35%
3.7Dock and Sea Trials1JBORF$19,440.00$21,615.7711.19%
3.80-1 Deck Heads/Showers -- Deck Covering Renewal1JBPAC$30,000.00$43,766.7545.89%
TOTAL BASE$609,184.00$935,953.2853.64%
OPTIONAL ITEMS
5.1Stern Thruster Access Trunk (4-88-1-T) Preservation1JBORF$20,520.00$10,941.23-46.68%
5.2Fuel System Repairs1JBORF$74,160.00$130,313.1775.72%
5.3Bridge UPS Replacement1JBPAC$55,120.00$62,073.1712.61%
5.4Galley 3-Way Valve Reach Rod Modifications1JBORF$8,080.00$28,455.74252.18%
5.5Exterior Deck Maintenance1JBORF$44,300.00$70,862.7059.96%
5.6Steering System Repairs1JBORF$31,800.00$19,941.54-37.29%
5.7Sound Velocity Probe Cable Replacement1JBORF$11,680.00$17,083.3946.26%
5.8Sewage Holding Tank Cleaning and Maintenance Coating1JB$22,720.00$17,195.39-24.32%
5.9Miscellaneous Piping Repairs1JB$54,480.00$44,167.04-18.93%
ADDITIONAL ITEM REQUIREMENTS (AIR)
401Work Requirements

(See schedule notes below)

(I). 375 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LSTo be Determined$65.00$110.0069.23%$93.5017.65%
(II). 150 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%$126.5021.74%
(III). 100 man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%$137.5020.00%
Material/Subcontractor markup rate of _____% multiplied by $40,000= markup cost of $TBD.
20.00%10.00%-50.00%10.00%0.00%
Total Estimated Cost=

Total Labor Cost + $TBD +

Markup cost=$TBD$99,125.00$124,850.0025.95%N/AN/A
TOTAL (BASE+OPTIONAL+AIR)$1,031,169.00$1,461,836.6541.76%

FINAL PRICE COMPARE

IGEMarisco-Original (13Apr17)Marisco-Final (2May17)% Difference Marisco (Final vs. Original)% Difference IGE (compared to Final)PRE-NEG OBJ% Diff IGEHistory*% Diff Hist*History**% Diff Hist**History***% Diff Hist***
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
3.1Temporary Services37DYORF$2,232.00$82,584.00$6,108.74$226,023.39$3,780.01$139,860.37-38.12%-38.12%69.36%69.36%$8,000.00$296,000.00258.42%$1,500.00307.25%$3,228.0089.24%
3.2Drydocking and Routine Drydock Work1JBORF$106,480.00$91,980.57$91,980.570.00%-13.62%$91,980.57-13.62%
3.3Bow and Stern Thruster Maintenance1JBORF$52,540.00$81,761.28$72,638.82-11.16%38.25%$63,048.0020.00%$33,934.00140.94%
3.4Shell Plate Repair1JBORF$22,640.00$20,820.77$20,820.770.00%-8.04%$20,820.77-8.04%
3.5Underwater Hull Spot Preservation & Coating1JBORF$26,620.00$32,526.92$32,526.920.00%22.19%$31,945.0020.00%
3.6Caterpillar D398 40K Overhaul – SSDGs #1 & #21JBORF$291,200.00$417,448.83$384,119.44-7.98%31.91%$349,450.0020.00%
3.7Dock and Sea Trials1JBORF$19,440.00$21,615.77$21,615.770.00%11.19%$21,615.7711.19%
3.80-1 Deck Heads/Showers -- Deck Covering Renewal1JBPAC$30,000.00$43,766.75$35,870.78-18.04%19.57%$35,252.7517.51%
TOTAL BASE$631,504.00$935,944.28$799,433.4426.59%$910,112.8644.12%
OPTIONAL ITEMS
5.1Stern Thruster Access Trunk (4-88-1-T) Preservation1JBORF$20,520.00$10,941.23$10,941.230.00%-46.68%$10,941.23-46.68%
5.2Fuel System Repairs1JBORF$74,160.00$130,313.17$130,313.170.00%75.72%$88,990.0020.00%
5.3Bridge UPS Replacement1JBPAC$55,120.00$62,073.17$61,594.94-0.77%11.75%$62,073.1712.61%
5.4Galley 3-Way Valve Reach Rod Modifications1JBORF$8,080.00$28,455.74$23,953.82-15.82%196.46%$9,696.0020.00%
5.5Exterior Deck Maintenance1JBORF$44,300.00$70,862.70$44,951.23-36.57%1.47%$53,160.0020.00%
5.6Steering System Repairs1JBORF$31,800.00$19,941.54$19,941.540.00%-37.29%$19,941.54-37.29%
5.7Sound Velocity Probe Cable Replacement1JBORF$11,680.00$17,083.39$11,703.23-31.49%0.20%$14,016.0020.00%
5.8Sewage Holding Tank Cleaning and Maintenance Coating1JB$22,720.00$17,195.39$17,195.390.00%-24.32%$17,195.39-24.32%
5.9Miscellaneous Piping Repairs1JB$54,480.00$44,167.04$44,167.040.00%-18.93%$44,167.04-18.93%
ADDITIONAL ITEM REQUIREMENTS (AIR)
401Work Requirements

(See schedule notes below)

(I). 375 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LSTo be Determined$65.00$110.00$110.000.00%69.23%$100.0053.85%$164.00-32.93%$157.00-29.94%$65.0069.23%
(II). 150 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.00$154.000.00%62.11%$120.0026.32%$225.00-31.56%$215.00-28.37%$90.0071.11%
(III). 100 man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.00$165.000.00%32.00%$130.004.00%$225.00-26.67%$250.00-34.00%$110.0050.00%
Material/Subcontractor markup rate of _____% multiplied by $40,000= markup cost of $TBD.
20.00%10.00%10.00%0.00%-50.00%10.00%0.00%10.00%0.00%10.00%0.00%15%-33.33%
Total Estimated Cost=

Total Labor Cost + $TBD +

Markup cost=$TBD$99,125.00$124,850.00$124,850.000.00%25.95%$112,500.0010.98%N/AN/AN/AN/AN/AN/A
TOTAL (BASE+OPTIONAL+AIR)$1,053,489.00$1,461,827.65$1,289,045.03-11.82%22.36%$1,342,793.2327.46%
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$2,000.00$1,470.00$1,470.00-26.50%$818.4079.62%$1,008.0045.83%
*Historical pricing is based on Contract AB-133M-15-CQ-0033, Marisco HI Dockside, Option Period I (1 June 2017-31 May 2018) most appropriately is compared with T0001's POP of 21 May-26 June 2017; no other rates included.
**Historial pricing is based on Contract AB-133M-15-CQ-0021 (Option Period I, 1 June 2016-31 May 2017), place of performance unknown, drydock/dockside by Marisco.

***Historical pricing based on Contract AB-133M-15-CN-0048, emergency drydocking repairs (Puglia Engineering) for identical work for bow and stern thruster maintenance, Item Number 3.3.

Pre-Neg T0001

IGEMarisco% Difference IGEPRE-NEG OBJ% Diff IGEHistory*% Diff Hist*History**% Diff Hist**History***% Diff Hist***
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
3.1Temporary Services27DYORF$2,232.00$60,264.00$8,371.57$226,032.39275.07%275.07%$8,000.00$216,000.00258.42%$1,500.00458.10%$3,228.00159.34%
3.2Drydocking and Routine Drydock Work1JBORF$106,480.00$91,980.57-13.62%$91,980.57-13.62%
3.3Bow and Stern Thruster Maintenance1JBORF$52,540.00$81,761.2855.62%$63,048.0020.00%$33,934.00140.94%
3.4Shell Plate Repair1JBORF$22,640.00$20,820.77-8.04%$20,820.77-8.04%
3.5Underwater Hull Spot Preservation & Coating1JBORF$26,620.00$32,526.9216.45%22.19%$31,945.0020.00%
3.6Caterpillar D398 40K Overhaul – SSDGs #1 & #21JBORF$291,200.00$417,448.8343.35%$349,450.0020.00%
3.7Dock and Sea Trials1JBORF$19,440.00$21,615.7711.19%$21,615.7711.19%
3.80-1 Deck Heads/Showers -- Deck Covering Renewal1JBPAC$30,000.00$43,766.7545.89%$35,252.7517.51%
TOTAL BASE$609,184.00$935,953.2853.64%$830,112.8636.27%
OPTIONAL ITEMS
5.1Stern Thruster Access Trunk (4-88-1-T) Preservation1JBORF$20,520.00$10,941.23-46.68%$10,941.23-46.68%
5.2Fuel System Repairs1JBORF$74,160.00$130,313.1775.72%$88,990.0020.00%
5.3Bridge UPS Replacement1JBPAC$55,120.00$62,073.1712.61%$62,073.1712.61%
5.4Galley 3-Way Valve Reach Rod Modifications1JBORF$8,080.00$28,455.74252.18%$9,696.0020.00%
5.5Exterior Deck Maintenance1JBORF$44,300.00$70,862.7059.96%$53,160.0020.00%
5.6Steering System Repairs1JBORF$31,800.00$19,941.54-37.29%$19,941.54-37.29%
5.7Sound Velocity Probe Cable Replacement1JBORF$11,680.00$17,083.3946.26%$14,016.0020.00%
5.8Sewage Holding Tank Cleaning and Maintenance Coating1JB$22,720.00$17,195.39-24.32%$17,195.39-24.32%
5.9Miscellaneous Piping Repairs1JB$54,480.00$44,167.04-18.93%$44,167.04-18.93%
ADDITIONAL ITEM REQUIREMENTS (AIR)
401Work Requirements

(See schedule notes below)

(I). 375 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LSTo be Determined$65.00$110.0069.23%$100.0053.85%$164.00-32.93%$157.00-29.94%$65.0069.23%
(II). 150 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%$120.0026.32%$225.00-31.56%$215.00-28.37%$90.0071.11%
(III). 100 man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%$130.004.00%$225.00-26.67%$250.00-34.00%$110.0050.00%
Material/Subcontractor markup rate of _____% multiplied by $40,000= markup cost of $TBD.
20.00%10.00%-50.00%10.00%0.00%10.00%0.00%10.00%0.00%15%-33.33%
Total Estimated Cost=

Total Labor Cost + $TBD +

Markup cost=$TBD$99,125.00$124,850.0025.95%$112,500.0010.98%N/AN/AN/AN/AN/AN/A
TOTAL (BASE+OPTIONAL+AIR)$1,031,169.00$1,461,836.6541.76%$1,262,793.2322.46%
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$2,000.00$1,470.00-26.50%$818.4079.62%$1,008.0045.83%
*Historical pricing is based on Contract AB-133M-15-CQ-0033, Marisco HI Dockside, Option Period I (1 June 2017-31 May 2018) most appropriately is compared with T0001's POP of 21 May-26 June 2017; no other rates included.
**Historial pricing is based on Contract AB-133M-15-CQ-0021 (Option Period I, 1 June 2016-31 May 2017), place of performance unknown, drydock/dockside by Marisco.

***Historical pricing based on Contract AB-133M-15-CN-0048, emergency drydocking repairs (Puglia Engineering) for identical work for bow and stern thruster maintenance, Item Number 3.3.

Post-Neg T0001

IGEMarisco Revised Price% Difference IGEHistory*% Diff Hist*History**% Diff Hist**History***% Diff Hist***
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
3.1Temporary Services27DYORF$2,232.00$60,264.00$8,371.57$226,032.39275.07%275.07%$8,000.00$1,500.00458.10%$3,228.00159.34%
3.2Drydocking and Routine Drydock Work1JBORF$106,480.00$91,980.57-13.62%
3.3Bow and Stern Thruster Maintenance1JBORF$52,540.00$72,638.8238.25%$33,934.00114.06%
3.4Shell Plate Repair1JBORF$22,640.00$20,820.77-8.04%
3.5Underwater Hull Spot Preservation & Coating1JBORF$26,620.00$32,526.9216.45%22.19%
3.6Caterpillar D398 40K Overhaul – SSDGs #1 & #21JBORF$291,200.00$384,119.4431.91%
3.7Dock and Sea Trials1JBORF$19,440.00$21,615.7711.19%
3.80-1 Deck Heads/Showers -- Deck Covering Renewal1JBPAC$30,000.00$35,870.7819.57%
TOTAL BASE$609,184.00$885,605.4645.38%
OPTIONAL ITEMS
5.1Stern Thruster Access Trunk (4-88-1-T) Preservation1JBORF$20,520.00$10,941.23-46.68%
5.2Fuel System Repairs1JBORF$74,160.00$130,313.1775.72%
5.3Bridge UPS Replacement1JBPAC$55,120.00$61,594.9411.75%
5.4Galley 3-Way Valve Reach Rod Modifications1JBORF$8,080.00$28,376.92251.20%
5.5Exterior Deck Maintenance1JBORF$44,300.00$44,951.231.47%
5.6Steering System Repairs1JBORF$31,800.00$19,941.54-37.29%
5.7Sound Velocity Probe Cable Replacement1JBORF$11,680.00$11,703.230.20%
5.8Sewage Holding Tank Cleaning and Maintenance Coating1JB$22,720.00$17,195.39-24.32%
5.9Miscellaneous Piping Repairs1JB$54,480.00$44,167.04-18.93%
ADDITIONAL ITEM REQUIREMENTS (AIR)
401Work Requirements

(See schedule notes below)

(I). 375 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LSTo be Determined$65.00$110.0069.23%$164.00-32.93%$157.00-29.94%$65.0069.23%
(II). 150 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.
$95.00$154.0062.11%$225.00-31.56%$215.00-28.37%$90.0071.11%
(III). 100 man hours multiplied by the premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

$125.00$165.0032.00%$225.00-26.67%$250.00-34.00%$110.0050.00%
Material/Subcontractor markup rate of _____% multiplied by $40,000= markup cost of $TBD.
20.00%10.00%-50.00%10.00%0.00%10.00%0.00%15%-33.33%
Total Estimated Cost=

Total Labor Cost + $TBD +

Markup cost=$TBD$99,125.00$124,850.0025.95%N/AN/AN/AN/AN/AN/A
TOTAL (BASE+OPTIONAL+AIR)$1,031,169.00$1,379,640.1533.79%
0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$_____$2,000.00$1,470.00-26.50%$818.4079.62%$1,008.0045.83%
*Historical pricing is based on Contract AB-133M-15-CQ-0033, Marisco HI Dockside, Option Period I (1 June 2017-31 May 2018) most appropriately is compared with T0001's POP of 21 May-26 June 2017; no other rates included.
**Historial pricing is based on Contract AB-133M-15-CQ-0021 (Option Period I, 1 June 2016-31 May 2017), place of performance unknown, drydock/dockside by Marisco.

***Historical pricing based on Contract AB-133M-15-CN-0048, emergency drydocking repairs (Puglia Engineering) for identical work for bow and stern thruster maintenance, Item Number 3.3.

Revised Price 5.4 (27Apr)

IGEMarisco Revised Price% Difference IGE
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
5.4Galley 3-Way Valve Reach Rod Modifications1JBORF$8,080.00$23,953.82196.46%

Revised Price 3.1 (2May17)

IGEMarisco Revised Price% Difference IGEHistory*% Diff Hist*
Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmount
BASE ITEMS
3.1Temporary Services37DYORF$2,232.00$82,584.00$3,780.00$139,860.0069.35%69.35%$8,000.00$3,528.497.13%
*Historical pricing is based on a recent (awarded 31 January 2017) drydock contract, AB-133M-17-CN-0026, also awarded to Marisco for work at its facilities in Hawaii. Temporary services were treated as one lump sum (a unit of "each") and the total value was $45,870.39. The period of performance was from 1 February 2017-13 February 2017, or 13 days total. Therefore, $45,870.39/13 days equals a price per day of approximately $3,528.49.

T0001 Price Schedule

Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmountFund Type
BASE ITEMS
ORF Items
10910ABS Coordination1JBORF$___________$___________
10911Fire and Safety Inspections1JBORF$___________$___________
10912Life Raft Inspections1JB$___________$___________
11000Steel Repair1JB$___________$___________
12330Main Engine overhaul1JB$___________$___________
12370Bow Thruster Service1JB$___________$___________
12410Main Reduction Gear Inspection1JB$___________$___________
12430Tail shaft and CPP Inspection1JB$___________$___________
13300Anode Inspection1JB$___________$___________
14430Machinery Control System Updates1JB$___________$___________
15050Pipe Repair1JB$___________$___________
15120Ventilation System Cleaning1JB$___________$___________
15121Fan Room Repairs1JB$___________$___________
15200Sea Valve Inspections1JB$___________$___________
15330Potable Water Tank Recoat1JB$___________$___________
15331Hot Water Tank Installation1JB$___________$___________
15620Rudder Inspection1JB$___________$___________
15810Anchor and Chain Inspection1JB$___________$___________
15830Davit Inspection1JB$___________$___________
16310Hull Preservation1JB$___________$___________
16311Freeboard Preservation1JB$___________$___________
19920Temporary Services Daily Rate (See CAR 1352.271-89)136DY$___________$___________
19970Dry Docking1JB$___________$___________
Total ORF Items$___________
PAC Items
22410Electric CPP Pump Installation1JB$___________$___________
22410Electric CPP Pump Material Only (SOW para 4.2)1JB$20,000.00$20,000.00
23100Reverse Osmosis System Installation1JB$___________$___________
25280Sewage Tank Modifications1JB$___________$___________
25290Oilywater Storage Tank Modification1JB$___________$___________

Total PAC Items $___________

TOTAL BASE ITEMS $___________

Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmount
ADDITIONAL ITEM REQUIREMENTS (AIR)/GROWTH WORK
3000ORF AIR/Growth Work

(See schedule notes below)

(I).75 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $_____.

1LSTo be Determined$___________$___________
(II). 112.5 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $_____.

(III). 131.25 man hours multiplied by the Premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $_____.

(I)+(II)+(III)=Total labor cost of $_____.

Material/Subcontractor markup rate of _____% multiplied by $75,000.00 = markup cost of $_____.

Total Estimated Cost= Total Labor Cost + $75,000 + Markup cost=$_____ 1

4000 PAC AIR/Growth Work (See schedule notes below)

(I). 75 man hours multiplied by the regular hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for regular hours of $_____.

1LSTo be Determined$___________$___________
(II). 112.5 man hours multiplied by the overtime hour labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for overtime hours of $_____.

(III). 131.25 man hours multiplied by the Premium (Sunday/Holiday) labor rate of $_____ per man hour equals the estimated additional work requirements labor cost for premium hours of $_____.

(I)+(II)+(III)=Total labor cost of $_____.

Material/Subcontractor markup rate of _____% multiplied by $25,000.00 = markup cost of $_____.

Total Estimated Cost= Total Labor Cost + $25,000 + Markup cost=$_____

TOTAL AIR/GROWTH $___________

Item No.Supplies/Services DescriptionQuantityUnitFund TypeUnit PriceAmount
OPTIONAL ITEMS
ORF Optional Items
50001Additional Anchor Chain shot1JB$___________$___________
50002Zinc Chromate Removal Bare Zinc1JB$___________$___________
50003Zinc Chromate Removal Zinc Overcoat1JB$___________$___________
50004Replacement Zincs1JB$___________$___________
50005Additional Diesel Fuel Storage1JB$___________$___________
55100Air Dryer Service1JB$___________$___________
55820Mooring Chock Repair Engineering (Design Services )1JB$___________$___________
55820Mooring Choc Repair (Material and Installation)1JB$50,000.00$50,000.00
55830#4 Davit AFT Pedestal Mod1JB$___________$___________
55900Fidely cleaning1JB$___________$___________
59301Oily Water System Modification1JB$___________$___________
TOTAL ORF OPTION ITEMS$___________
PAC OPTIONAL ITEMS
65280Flowmeter for Gray Water Tank1JB$___________$___________
66250Bridge Renewal1JB$___________$___________
69999Lay Days Daily Rate, see CAR 1352.271-860DY$___________$___________
TOTAL PAC OPTION ITEMS$___________

TOTAL OPTIONAL ITEMS $___________

TOTAL (BASE + GROWTH + OPTIONAL ITEMS)$___________
$___________

&"Times New Roman,Regular"Price Schedule

IGNORE

Item No.Supplies/Services DescriptionQuantityUnitUnit PriceAmount
BASE ITEMS
0001Temporary Services Daily Rate (Reference CAR 1352.271-89)TBDDY$TBD$TBD
OPTIONAL ITEMS
0002Additional Item Requirements (AIR)

(See schedule notes below)

(I). To Be Determined (TBD) man hours multiplied by the regular hour labor rate of $110 per man hour equals the estimated additional work requirements labor cost for regular hours of $TBD.

1LS$TBD$TBDNote to Angel: Copy and paste from T0001
(II). TBD man hours multiplied by the overtime hour labor rate of $154 per man hour equals the estimated additional work requirements labor cost for overtime hours of $TBD.

(III). TBD man hours multiplied by the premium (Sunday/Holiday) labor rate of $165 per man hour equals the estimated additional work requirements labor cost for premium hours of $TBD.

(I)+(II)+(III)=Total cost of $TBD.

Material/Subcontractor markup rate of 10% multiplied by $TBD= markup cost of $TBD.

Total Estimated Cost= Total Labor Cost + $TBD + Markup cost=$TBD

0003Lay Days Daily Rate
(Reference CAR 1352.271-86)TBDDY$TBD$TBD

Sheet4