Amendment_0008_final.pdf

PDF 51 KB Posted

Attached to
Drydock Repair Services for NOAA Ship Fairweather, Washington Region
Solicitation number
1305M318QNMAN0028
Issued by

About this file

Amendment 0008

View the file

Other files

File Type Posted
Fairweather_Price_Schedule_(12July18_FINAL).xlsx XLSX spreadsheet
2009,_Asbestos_Assesment_(Argus_Pacific)_-FA.pdf PDF
Amendment_0007_final.docx DOCX document
Amendment_0006.docx DOCX document
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.docx DOCX document
Amendment_0001.docx DOCX document
Attachment_1,_Subcontractor_Consent_Form_for_Release_of_Past_Performance_Info.docx DOCX document
Document_1_Clauses_and_Provisions.pdf PDF
Document_2,SOW.pdf PDF
Combined_Synopsis_Solicitation_RFQ.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages 1 8

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

AMENDMENT 0008 8 AUG 2018 NMAN7200-18-01655

6. Issued By Code AJ630031 7. Administered By (If other than Item 6) Code

WESTERN ACQUISITION DIVISION SEE BLOCK 6

CONTRACTS BRANCH

7600 SAND POINT WAY NE SOU6

SEATTLE, WA 98115-6349

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

1305M318QNMAN0028

9B. Dated (See Item 11)

12 July 2018 10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( ) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate questions and answers and to incorporate changes to the SOW.

PURPOSE

The purpose of this amendment is to incorporate questions and answers and incorporate changes to the

SOW.

a. Incorporate the questions and answers as shown below.

SOW Item 15330 Potable Water Tank Recoat:

Question: What is the maximum capacity of each potable water tank?

Answer: Potable Water Tanks are 3400 gallons each.

SOW Item 25280 Sewage Tank Modifications:

Question: What is the maximum holding capacity of the new sewage and grey water tanks?

Answer: Sewage Tank is approximately 5028 gallons. Grey Water Tank is approximately 5610 galllons.

SOW Item 25290 Oily Water Storage Tank Modification:

Question: What is the maximum capacity of the new oily water storage tank?

Answer: The new Oily Water Storage Tank is approximately 2048 gallons.

Solicitation page 6 of 6 FAR Commercial Item Clauses:

Question: FAR 52.212-1, 52.212-2, 52.217-4, 52.217-5. How do listed FARs apply to this contract as it is for commercial items only? This is under a service contract.

Answer: These provisions—Federal Acquisition Regulation (FAR) 52.212-1Instructions to Offerors-Commercial Items, FAR 52.212-2 Evaluation-Commercial Items, FAR 52.217-4 Evaluation of Options Exerciseed at Time of Contract Award, and FAR 52.217-5 Evaluation of Options--apply because this is a commercial services contract. Also reference FAR Part 2 which includes a definition of “commercial item” as follows:

(5) Installation services, maintenance services, repair services, training services, and other services if--

(i) Such services are procured for support of an item referred to in paragraph (1), (2), (3), or (4) of this definition, regardless of whether such services are provided by the same source or at the same time as the item; and

(ii) The source of such services provides similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government;

Clauses and Provisions Attachment 1 Subcontractor Consent Form:

Question: Do we need to include letters for every subcontractor we are working with to bid on the project? Including the ones listed in the SOW? Or is this form to only be used for Past Performance entities that we are submitting in volume 2 Factor 2?

Answer: The consent form at Attachment 1 shall “be completed by the major subcontractors/teaming partners identified in your proposal”. Note that any contractors stated in the SOW are for REFERENCE ONLY as the original equipment manufacturers or existing equipment/material, firms known to the Government to provide certain items/services, etc. FAR and solicitation references are provided below.

Per FAR 9.601:

“Contractor team arrangement,” as used in this subpart, means an arrangement in which --

(1) Two or more companies form a partnership or joint venture to act as a potential prime contractor; or

(2) A potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program.

Per the solicitation, ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS, INSTRUCTIONS, 2. Volume II: Technical Quote, Factor 2-Past Performance, paragraph (2), “The quoter shall submit, along with the information required in the previous paragraph, a consent letter (Attachment #1), executed by each teaming partner and/or joint venture partner, authorizing release of adverse past performance information to the quoter, so the quoter can respond to such information.”

Per Attachment 1, the document itself includes the following language:

“In an effort to assist the Government's past performance evaluators in assessing your past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal.”

SOW Item 66250 Bridge Window Wiper Replacement:

Question: Does the existing system have water piped to the wipers?

Answer: There is a window sprayer system that is independent of the wipers.

Question: Is there a drawing for the existing wiper system? Who is the manufacturer of the existing wipers?

Answer: A drawing of the wiper system is not available.

SOW Item 66250 Bridge Window Wiper Replacement:

Question: Are the wipers power souce AC voltage or DC voltage? If AC what is the breaker size? Are the wipers fed off of one circuit?

Answer: The motors are 115 Volt AC at 1 amp.

SOW Item 22410 CCP Electric Pump Conversion:

Question: Paragraph 4.4.4 the SOW is calling for 4 spare breakers, what size breakers are required? Are 3 spare pole breakers required?

Answer: The specification calls for extra spaces, breakers to fill those spaces are not requested.

SOW Item 22410 CCP Electric Pump conversion paragraph 4.4.4 states in part “The panel shall have at least four extra breakers spaces available for future use.”

Question: How can we price without a drawing for 4.4.6. Please provide the drawing.

Answer: Paragraph 4.3 in Item 22410 is modified to add assumption for quoting purposes;

reference SOW changes below. The price schedule has been updated and is attached to this amendment.

SOW Item 15050 Miscellaneous Pipe Repairs:

Question: 4.2.2. Visually inspect and hydrostatical test the following piping from the hull to the first inboard flange/ valve listed in Table 1 below. Hydrostatic test will be for 5 Minutes (plus time to inspect) at 150 LBS using fresh water. Leakage or pipe deformation is unacceptable.

Mark results on Table 1 below and provide to the COR. It was mentioned during the ship check that it may be possible to only do a visual inspection. Possibly remove the paint and inspect.

Getting test equipment to seal against the hull or inside of the piping at 150 PIS may be difficult.

Answer: To insure that piping is still sound enough to continue to operate without emergent repairs hydrostatic testing is required. If a pipe segment cannot be inspected due to the inability to get a good seal or inaccessibility it will be discussed with the COR and marked on Table 1 per the SOW. At that point on the Government will determine any repair actions; all contractors are reminded that any changes to the SOW are authorized by a contracting officer ONLY. Per the SOW, the last line of paragraph 4.2.2 for this item, following Table 1, reads “Provide a CFR for piping found to be un-acceptable”.

Noted that during the ship check that there was some concern of performing this operation. In the Navy it is standard practice to Hydrostatically test all repairs. The equipment is commercial available. The practice of Hydro-ing piping systems has great value to the customer as it can truly identify degraded piping sections and provide objective quality to repairs that a contractor performs.

SOW Item 15200 Sea Valve Inspections:

Question: 4.1.i. Remove all waster pieces and spool pieces installed between the sea valves and the ship’s hull. Thoroughly clean the waster and spool pieces and inspect for deterioration or other defectiveconditions and submit CFR with inspection results. Inspect all fasteners and submit a CFR same as specified above for sea valves. Reinstall waster pieces and spool pieces following successful inspection. It was stated during the ship check that this vessel does not have waster spools. Is that correct? If not then I will refer to the previous question about visual inspection if the hull piping.

Answer: There might be one or two in systems that have been modified and weren’t documented.

Question: 4.1.g. Coat the interior of each steel valve, excluding seating and polished surfaces, with the same epoxy primer used on the underwater body. The inside of the valve body would need to be blasted for the coating to adhere properly. Blasting the valves with the seats in place would not be recommended. Should it be assumed to remove all seats, blast, and paint and then proceed with assembly?

Answer: Yes it should be assumed for each of the valve steel body valves that are over 2" will require blasting, preservation and rebuilding.

SOW Item 55820 Mooring Chock repair:

Question: How do we quote the engineering? Do we assume a lump sum for engineering support?

Answer: Engineering work should be quotable. A lump sum for material and labor hours will be added to the SOW for installation under paragraph 4.1. Reference SOW changes below. The price schedule has been updated and is attached to this amendment.

SOW Item 23100 Reverse Osmosis system Installation:

Question: Request for reference 2.6 FA-311-001 has not been answered. Please provide reference.

Answer: As stated in Amendment 0006 “The drawing was provided as part of the second delivery of references on 7/26/18.” In actuality the drawing was provided on July 25, 2018 by government in a zipped file.

General Questions

Question: Please provide the NOAA Asbestos Survey Report for the NOAA Ship Fairweather

Answer: The Asbestos Assessment Report NOAA Fairweather is the most recent report that the government available. It is provided as an attachment to this amendment for informational purposes only.

Coating Inspection Requirements:

Question: Can the contractor use a certified NACE inspector that is an employee of the contractor?

Answer: No, the requirement is for a third party inspector. Reference SOW changes below.

b. Incorporate SOW changes as described below.

SOW CHANGES

1. ADD the following to Electric CPP Pump Installation to Item 22410

4.3 For quoting purposes assume a material cost of $20,000.00 including shipyard standard mark up. All vendors shall propose a Not to Exceed (NTE) price of $20,000.00 for the material cost in paragraph 4.2. This NTE price will be in addition to any effort proposed for the rest of the specification for Item 22410. Any work performed under item 4.2 will require a Condition Found Report (CFR) from the contractor, submitted to the COR, the Contract Specialist and the Contracting Officer. A Notice to Proceed (NTP) from the Contracting Officer is required before any performance can begin under 4.2 within item 22410.

2 ADD the following to 55820 Mooring Chock Repair

4.1 For quoting purposes for material and installation portion of the work item, assume $50,000.00. Prior to performing any work on this work item, the contractor shall provide a CFR to the COR, Contract Specialist, and Contracting Officer and receive authorization from the Contracting Officer in the form of a Notice to Proceed (NTP).

3 CHANGE Item 15810 Anchors and Chains

FROM:

4.2. Obtain the services of a certified NACE marine coating specialist/inspector acceptable to the COR to provide recommendations, and supervise surface preparation for and application of coating systems used in this work item. This specialist is to be an independent subcontractor or paint manufacturer representative that is not an employee of the prime contractor.

TO:

4.2. Obtain the services of a certified Level 111 NACE marine coating specialist/inspector to provide recommendations, and supervise surface preparation for and application of coating systems used in this work item. This specialist is to be an independent subcontractor or paint manufacturer representative that is not an employee of the prime contractor.

4 Change item 16310 Under Water Hull Spot Preservation

4.2 Obtain the services of a certified NACE marine coating specialist/inspector acceptable to the COR to assess the existing coating system, provide recommendations, and supervise surface preparation for and application of coating systems used in this work item.

4.2. Obtain the services of a certified Level III NACE marine coating specialist/inspector to assess the existing coating system, provide recommendations, and supervise surface preparation for and application of coating systems used in this work item. This specialist is to be an independent subcontractor or paint manufacturer representative that is not an employee of the prime contractor.

5 Change Item 16311 Hull Freeboard Preservation

4.0 Provide the services of a certified NACE marine coating specialist/inspector acceptable to the COR to assess the existing coating system, provide recommendations, and supervise surface preparation for and application of coating systems used in this work item.

4.0 Provide the services of a certified Level III NACE marine coating specialist/inspector to assess the existing coating system, provide recommendations, and supervise surface preparation for and application of coating systems used in this work item. This specialist is to be an independent subcontractor or paint manufacturer representative that is not an employee of the prime contractor.

(END OF AMENDMENT 0008)