amendment 0007

View the file

Other files

File Type Posted
Fairweather_Price_Schedule_(12July18_FINAL).xlsx XLSX spreadsheet
2009,_Asbestos_Assesment_(Argus_Pacific)_-FA.pdf PDF
Amendment_0008_final.pdf PDF
Amendment_0006.docx DOCX document
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.docx DOCX document
Amendment_0001.docx DOCX document
Attachment_1,_Subcontractor_Consent_Form_for_Release_of_Past_Performance_Info.docx DOCX document
Document_1_Clauses_and_Provisions.pdf PDF
Document_2,SOW.pdf PDF
Combined_Synopsis_Solicitation_RFQ.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code
Page of Pages
1
13
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
AMENDMENT 0007
2 AUG 2018
NMAN7200-18-01655
6. Issued By
Code AJ630031
7. Administered By (If other than Item 6)
Code
WESTERN ACQUISITION DIVISION
SEE BLOCK 6
CONTRACTS BRANCH
7600 SAND POINT WAY NE SOU6
SEATTLE, WA 98115-6349
8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
1305M318QNMAN0028

9B. Dated (See Item 11)

12 July 2018

10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( )
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate questions and answers and to incorporate changes to the SOW.

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

PURPOSE

The purpose of this amendment is to incorporate questions and answers and incorporate changes to the SOW.

a. The due date for the submission of quotations is unchanged at 15 August 2018 and no further extensions will be considered.

b. Incorporate the questions and answers as shown below.

SOW Item 22410 CPP Electric Pump Conversion:

Question: Paragraph 4.4.3 states to fabricate and connect the piping connections to the pump. During the ship check, the Chief Engineer stated that he wanted the CPP lines to the new pumps to be hard piped. The existing is hose. Will you please clarify how to proceed with the connections to the new pumps?

Answer: Clarified by adding paragraphs 4.4.3.1 through 4.4.3.4 to Item 22410; reference SOW changes below.

Question: Can you provide a drawing or piping diagram of the existing CPP piping to the CPP pumps?

Answer: Drawing SA9002 Rev G provided via email to all contractors on 2 August 2018 has a piping diagram of the existing system.

SOW Item 15050 Misc. Piping Repairs:

Question: Paragraph 4.2.2 states to perform a hydrostatic test of piping from the hull to the first inboard flange for 5 min @ 150 LBS. Is the SOW as per this paragraph still the same? During the ship check this work was discussed and was being considered to be rewritten due to the complexity of the testing as related to achieving SAT results.

Answer: Paragraph 4.2.2 in Item 15050 is modified to change the testing requirements; reference SOW changes below.

Question: Paragraph #4.5 states to weld a ½” schedule 80 seamless pipe and valve into the lower sea chests. What kind of valve should be installed?

Answer: Paragraph 4.5 in Item 15050 was modified to provide valve type; reference SOW changes below.

SOW Item 12430 Tail Shaft Survey and CPP Inspection:

Question: Are the GFE bearing housings not made and machined to the proper outside diameter size from the factory to fit the existing bores of the struts and stern tubes?

Answer: The bearings are remanufactured bearings that were spares for the Rainier and Fairweather. They were remanufactured by the OEM in accordance with the bearing drawing.

Question: Will the GFE bearings inside diameter dimensions be to the proper size to accommodate shaft journal diameters with the proper clearances? Or will the inside bores of the bearings have to be machined to proper size?

Answer: The inside bearing diameter will be correct.

Question: Are any of the current shaft bearings installed with Chockfast Orange for alignment purposes?

Answer: It is not known if Chockfast was used on the last installation.

SOW Item 15620 Port & Starboard Rudder:

Question: The replacements of the lower rudder bearing (reference 2.1 – Drawing: FA-S2201-1 Rudder and Rudder Stocks) says they are Bronze Rubber lined with a MIL-B-17901 (SHIPS) CL.2 in the description and that they are 16 7/8” long. Do you have any more information on these bearing (brand name, model number, part number, Outside diameter, Inside diameter, flange size, split shell housing)? Are these bearings a long lead time to get them?

Answer: Drawing FA-S2201_1 was provided via email on 2 August 2018 to all contractors with additional pages that were previously missing.

Question: Are any of the current shaft bearings installed with Chockfast Orange for alignment purposes?

Answer: It is not known if Chockfast was used on the last installation.

SOW Item 11100 Miscellaneous Structure Repairs:

Question: 4.1.7 Please provide additional definition to the requested repairs; location (frame #), dimensions, plate thickness etc.

Answer: The SOW was updated to change paragraph 4.1.7 of Item 11100; reference SOW changes below.

Question: 4.1.8.3 Please confirm that an "air box test" of plate seams will satisfy the intent of this requirement (this method is accepted by ABS).

Answer: Air box testing will be acceptable to NOAA if ABS accepts it.

Question: 4.1.10 Without specific definition of the individual applicable interferences, it is impossible to accurately estimate the cost of servicing this requirement. Please make removal and restoration of these interferences the subject of a negotiated change order.

Answer: Paragraph 4.1.8 of Item 11100 was updated to clarify insulation removal; reference SOW changes below.

Question: 4.1.11 Without specific definition of the location of repairs, it is impossible to accurately estimate the cost of performing coating repairs (If underwater hull coatings, repairs may require up to six coats of paint. If in way of an uncoated tank, repairs may only require 3 coats of paint. Painting within a confined space is significantly more difficult than an open area). Please make application of coatings the subject of a negotiated change order.

Answer: Paragraphs 4.1.10 thru 4.1.12 of Item 11100 were updated to include clarification on paint, interferences and insulation; reference SOW changes below.

SOW Item 12370 Bow Thruster Service:

Question: Please provide drawings for this item.

Answer: The tech manual was provided via email to all contractors on 25 July 2018.

SOW Item 12410 Main Reduction Gear Inspection:

Question: What are the requirements for piping? Is it preferred for hard piping, sleeved, or tubing? What is acceptable?

Answer: Clarified by adding paragraphs 4.4.3.1 to 4.4.3.4; reference SOW changes below.

SOW Item 14430 Machinery Control Updates:

Question: Item 14430: It's understood that specified parts and/or vendors are no longer in existence, are equivalent items acceptable? (4.1-4.1.2)

Answer: The material procurement was removed from this item in paragraph 4.1; reference SOW changes below. Both vendors listed should still be open for business.

SOW Item 15050 Misc Pipe Repairs:

Question: 150lb testing will be difficult to accomplish. Will interior pipe cleaning and visual inspection suffice? ASTM B-467 is a copper-Nickel Procedure; can the proper ASTM procedure be provided?

Answer: Paragraph 4.2.2 of Item 15050 was updated to include new testing requirements; reference SOW changes below.

The ASTM in the spec was updated to ASTM A53.

SOW Item 15620 Rudder Inspection:

Question: Are there drawings available for this item? Information for Lower Bearing? Size and Make of Upper bearing?

Answer: Provided drawing via email to all contractors on 2 August 2018. The drawing is FA_S2201_1 Rudder and Rudder Stock Design Alt 1. This file includes multiple drawings and rudder design calculations.

SOW Item 25280 Sewage Tank Modification:

Question: Please provide reference 2.3. . Please clarify the pipe routing requirement.

Answer: Reference 2.3 was provided as part of the first delivery of references 19 July 2018. Sent via AMRDEC File. Pipe routing is intentionally left open to allow for field routing.

SOW Item 25290 Oily Water Storage Tank Modification:

Question: SOW is vague, how to quote on interferences? Model of TLI required for this system? The chief engineer requested this same model as existing TLIs on other systems but this is not specified in this work item.

Answer: Design drawings FA-528-001 and FA-593-001 have been updated to include the TLI. They were provided to all contractors via email 2 August 2018.

Question: Item 55820: How to bid engineering? Assume Lump sum for engineering support?

Answer: Engineering work should be quotable. Directions for quotes will be included in a further amendment.

SOW Item 12410 Main Reduction Gear Inspection:

Question: Since no drawings been provided, how do you anticipate approaching the item?

Answer: Drawings are not needed for this item.

SOW Item 22410 Electric CPP Pump Installation:

Question: How can we price without a drawing for 4.4.6. Please provide the drawing.

Answer: Paragraph 4.3 will be updated by further amendment.

SOW Item 15330 Potable Water Tank Recoat:

Question: Item 15330 Please provide square footage, if more than 2 tanks how many in total?

Answer: The tank drawing has been provided as part of the first submission of references 19 July 2018, via AMRDEC File, and sqft may be calculated from it. The drawing # is FA-S1101-2. Both potable water tanks shall be fully blasted and recoated.

SOW Item 16310 under Water Hull Preservation:

Question: Is the Boot Top stripe a different color from UWH? Please provide square footage for UWH Boot Top Stripe.

Answer: The underwater hull including the boot top strip is black. The parabolic boot top dimensions are provided on RA S2806-2 and FA-S0701-2-1. Overall boot top area can be determined from that drawing.

SOW Item 16311 Hull Freeboard Preservations:

Question: Item 16311 4.7.1 SP states "select 20%" and 4.7.2 SP states "entire freeboard and screens". Is requested coating removal 20% or 100% of freeboard and does the area include inside bulwarks? Please provide square footage for freeboard to top of bulwark including inside bulwark designated in SOW.

Answer: The total area of the freeboard is 6700 sqft. 20% of that area will require paint removal. Paragraph 4.7.2 of Item 16311 has been revised to clarify. The entire hull will require an overcoat after repairs are complete. Reference SOW changes below.

c. Incorporate SOW changes as described below.

SOW CHANGES

1. ADD the following tank coating requirements to Item 25280

4.7. Clean and preserve the new sewage and gray water tanks.

4.7.1 Clean the new sewage and gray water tanks. Remove all debris and oil residue from the steel surfaces to accept the new coating system. Provide the services of a manufactures representative to inspect and approve the surface cleanliness.

4.7.2 Plug all pipe openings in the tank. Abrasive blast the tank to bare white metal SSPC-SP10 in accordance with Ref 2.6. Provide the services of a manufactures representative to inspect and approve the surface profile and cleanliness. Allow the COR to verify the surface profile and tank cleanliness prior to any coating application.

**CHECKPOINT**

4.7.3 Apply International Brand Interline 624 Epoxy coating system or an equivalent system to the tank in accordance with the manufactures application instructions. Provide the COR an opportunity to witness environmental readings and DFT measurements during before each coat application.

**CHECKPOINT**

2 ADD the following tank coating requirements to Item 25290

4.4 Clean and preserve the new oily water storage tank.

4.4.1 Clean the new oily water storage tank. Remove all debris and oil residue from the steel surfaces to accept the new coating system. Provide the services of a manufacture representative to inspect and approve the surface cleanliness.

4.4.2 Plug all pipe openings in the tank. Abrasive blast the tank to bare white metal SSPC-SP10 in accordance with Ref 2.6. Provide the services of a manufactures representative to inspect and approve the surface profile and cleanliness. Allow the COR to verify the surface profile and tank cleanliness prior to any coating application.

**CHECKPOINT**

4.4.3 Apply International Brand Interline 624 Epoxy coating system or an equivalent system to the tank in accordance with the manufactures application instructions. Provide the COR an opportunity to witness environmental readings and DFT measurements during before each coat application.

**CHECKPOINT**

3 ADD clarification to Item 11100 under paragraph 4.1.3. Added: “Repair the wasted steel on the bottom outboard edge.”

4 ADD clarification to Item 11100 under paragraph 4.1.8.1. Added “Assume insulation removal and replacement will be required. Interferences that need to be removed for these five section shall be submitted as an additional item request via a CFR. Painting requirements shall also be submitted under a CFR for these five sections.”

5 ADD upper bearing replacement to Item 12330 in paragraph 4.5.4. Paragraph 4.5.4 changed FROM: Replace Lower main bearings and Inspect Upper Main Bearings. Replace lower linear inserts and Viton head seat rings.

TO: Replace lower and upper main bearings. Replace lower linear inserts and Viton head seat rings.

6 ADD SOW requirements for material on Item 15050 paragraphs 4.3.1 and 4.3.2. Paragraphs 4.3.1 and 4.3.2 were changed FROM: 4.3.1. Replace the gray water lines that run thru the port and starboard potable water tanks (B-03-01 and B-03-103) with equal sized 316 stainless steel. Each piece of the pipe almost runs the length of the tank.

4.3.2 The total approximate piping length is 50 feet, the pipe should be 1-1/2”, it will have at least 2 90’s in the piping run and at least 8 penetrations.

TO:4.3.1Replace the two gray water lines that run thru the port and starboard potable water tanks (B-03-01 and B-03-103) with equal sized 316 stainless steel pipe meeting the requirements of ASTM 312 and NSF 61 for potable water use. Each piece of pipe almost runs the length of the tank.
4.3.2The total approximate piping length is 50 feet, the pipe should be 1-1/2” schedule 40, it will have at least 2 – 90 degree turns in the piping run and at least 8 penetrations. All fittings shall meet ASTM A815.

7 Change paragraph 4.4 in Item 15050 FROM: 4.4 Replace the stand pipe sections for fire station #23 and #24 from the deck penetrations to valve with 1-1/2” seamless steel pipe threaded at one end meeting ASTM A53 as stated on reference 2.10. Each piping segment is approximately 14” in length. The deck penetrations do not need to be replaced. The ship will remove the valve(s) and reinstall. See figure 1.

TO: 4.4 Replace the stand pipe sections for fire station #23 and #24 from the deck penetrations to valve with 1-1/2” seam less steel pipe, ASTM B-467 as stated on reference 2.10. Each piping segment is approximately 14” in length. The ship will remove the valve(s) and reinstall. See figure 1.

8 Updated steam service requirement in paragraph 4.1.7 of Item 19920 from 15hp and 35 psi to 25 hp and 50 psi.

9 Change Reference 2.1 in Item 65280 from RA-528-001 to FA-528-001. This drawing was revised and resent to all contractors on 2 August 2018 via email.

10 On Item 15830, change reference 2.1 from “HN-9002 service manual” to “FA-583-01/02/03 HN-9002 Service Manuals.”

11 On Item 12410, remove reference 2.3 (RA-S4106-1-1).

12 On Item 12430, change reference 2.3 from FA-S4302-3 to FA-S4302-1. This drawing has already been submitted to all contractors via email 2 August 2018.

13 On Item 15620, change reference 2.2 from FA-S220025 to RA-2200-25. Updated paragraph 4.8 from “… reference 2.1.2.” to “… reference 2.2.”

14 On Item 23100, change Reference 2.4 from 183/248-5-1K to FA-S4805-1.

15 Under General Requirements, change paragraph 4.25.1, from “….35,000 gallons of fuel removed…” to “….45,000 gallons of fuel removed…”

16 Under Item 10910, paragraph 4.6.2 change from “50% fuel onboard at arrival” to “45,000 gallons of fuel onboard at arrival.”

17 Adjusted paragraph 4.2 in Item FROM: Install 1” piping from the steering flat to the engine room and tie in to the oily water system. The length of pipe is approximately 170’ and will need to be run in the overhead of the following spaces. This installation has interferences.

Steering gear flat
Engineering store / gymnasium

SR C-09-106

C-09 Passage way

WC C-09-102

SR C-9-106

C-08 Passage way

WC C-08-102

SH C-07-108

C-07 Passage way C-07-102 (CO2 Room)

SR C-07-104

Upper engine room Lower engine room.

TO: Install 1” schedule 40, 316 stainless steel piping from the steering flat to the engine room and tie in to the oily water system. The length of pipe is approximately 170’ and can be run in the overheads of through exiting tankage. Piping shall meet the requirements of ASTM 312 and fittings shall meet ASTM A815 requirements.

18 Change paragraph 4.4 Item 12430.

FROM: Remove the three propeller blades from the port and starboard hubs in accordance with Chapter 7 of Reference 2.1. Provide the services of an engineering firm to take shaft alignment readings prior to removal and then again upon installation.

TO: Remove the three propeller blades from the port and starboard hubs in accordance with Chapter 7 of Reference 2.1. Provide the services of an engineering firm to take shaft alignment readings prior to removal and then again upon installation. Alignment readings shall consist of strain gage readings afloat, before and after drydocking, to determine shaft alignment in terms of bearing loads through the line shaft and gear shaft bearings.

19 Change paragraph 4.3.2 in Item 12330.

FROM: Supply of new lube oil and coolant.

TO: Supply of new lube oil and coolant. Each engine will require 250 gallons of Marine Grade Motor oil SAE 40 and 180 gallons of distilled water with Ethylene gycol containing a corrosion package inhibitor meeting heavy duty specification TMC RP-329 “TYPE A” Ethylene gycol. Antifreeze Detroit Power Cool 3000 at a ratio of 1 quart per 4 gallons of distilled water. Coordinate the replacement of fluids with the ship’s crew and ensure attendance of a crew member when mixing and filling the system. Please note current motor oil is Chevron Delo 100 SAE 40 lube oil. Currently the ship is using Detroit Power Cool 3000 at a ratio of 1 quart per 4 gallons of distilled water.

20 Change paragraph 4.2.3 of Item 12410.

FROM: Thoroughly clean the case ensuring there is no metal fragments still in the gear box.

TO: Thoroughly clean the case ensuring there is no metal fragments still in the gear box. The reduction gear oil shall be removed and disposed of. Replace the reduction gear oil with SAE80W-90. Each gear box will require 45 gallons. Please note that current reduction gear oil is Chevron 80W-90.

21 Change paragraph 4.3.1.5 of Item 15830.

FROM: Inspect all welded joints.

TO: Inspect all welded joints. Clean and remove paint from up to 40 feet of weld joints down to bare metal. Perform a dye penetrant test on the cleaned welds to look for cracking. Clean and recoat the davit after testing where the paint was removed. All other welds shall be visually inspected.

22 Change “DCB” to “DBC” in paragraph 4.1 of Item 10912.

23 Deleted paragraph 4.1 of Item 14430. Paragraph 4.2 became 4.1.

24 Changed paragraph 4.2.1 of Item 15121.

FROM: Remove ventilation and steam piping as required to gain access to the deck against the bulkhead. Retain for reinstallation. Replace all degraded steam pipe.

TO: Remove ventilation and steam piping as required to gain access to the deck against the bulkhead. Retain for reinstallation. Write a CFR for any degraded steam piping that is found upon removal. Replace all disturbed steam pipe insulation.

25 Changed paragraph 4.6 of Item 55900 FROM: The blankets will be thoroughly washed and dried or replaced.

TO: The blankets shall be thoroughly washed and dried.

26 Changed paragraph 4.2 of Item 13300.

FROM: Visually inspect three (3) hull mounted anode assemblies and two (2) reference assemblies. Locations are shown in the table below. The anodes are platinum type, and the reference cells are silver/silver chloride type.

TO: Visually inspect three (3) hull mounted anode assemblies and two (2) reference assemblies. If deemed necessary, pre-testing may be done prior to the ship going into dock. This must be arranged in advance by the contractor and fit within the ship’s sailing schedule. Locations are shown in the SOW table. The anodes are platinum type, and the reference cells are silver/silver chloride type.

27 Added paragraphs 4.4.3.1 to 4.4.3.4 to Item 22410.

4.4.3.1 The suctions and discharges on all pumps shall be hard piped to as close as practical to the installed electric pumps with sufficient room to provide vibration isolation via JIC connected flexible connections rated to no less than 3000psi and suitable for use with the current EAL, Chevron Clarity EAL ISO 46.

4.4.3.2 The tank top suctions for both electric and mechanically driven pumps are currently flanged approximately three inches off the tank top.

4.4.3.3 Suction piping for all four pumps shall include an accessible in line suction strainer.

4.4.3.4 Discharge lines for all four pumps shall be routed directly into an inline hydraulic filter (reused from current design) via a flexible connection rated at no less than 3000psi and suitable for use with the current EAL, Chevron Clarity EAL ISO 46.

29 Added reference 2.4 (FA-SA9002 Rev G) to Item 22410.

30 Paragraph 4.2.1 changed in Item 15050.

FROM: Replace boiler over board discharge piping from the hull to the first flange. It was the temporary repaired during the mid-season repair period.

TO: Replace boiler over board discharge piping from the hull to the first flange. Note: This pipe segment was temporarily repaired during the mid-season repair period.

31 Paragraph 4.2.2 was changed in Item 15050.

FROM: Visually inspect and hydrostatical test the following piping F the hull to the first inboard flange/valve listed in Table 1 below. Hydrostatic test will be for 5 minutes (plus time to inspect) at 150 LBS using fresh water. Leakage or pipe deformation is unacceptable. Mark results on Table 1 below and provide to the COR.

TO: For each overboard pipe segment listed in Table 1 below, between the hull and the first valve ream out the pipe to remove sea growth and loose corrosion. The pipes shall be visually inspected both internally using a borescope and externally. Provide up to 250 ultrasonic thickness (UT) measurements on pipe segments designated by the COR. Assume insulation removal and replacement will be necessary. Mark results on Table 1 below and provide to the COR.

32 Paragraph 4.5 was changed in Item 15050.

FROM: Weld in a ½” schedule 80, ASTM A53. Seamless pipe and valve in to the lower sea chest.

TO: Weld in a ½” schedule 80, ASTM A53 seamless pipe and valve in to the lower sea chests. The valve shall be a flanged gate valve meeting ABS requirements for overboard valves.

33 Paragraph 4.1.7 in Item 11100 was updated to clarify the bulwark repair. Changed paragraph 4.1.7.

FROM: Renew to port aft segment of the Bulwark on D deck that was damaged. ROM the port aft corner to the inner edge, approximately 10 feet. It will require being cut off reshaped and reinstalled.

TO: Renew to port aft segment of the Bulwark on D deck that was damaged. The bulwark was bent from a collision with the pier during docking. The upper portion of the transom bulwark on the port side will need to be reshaped. This portion of the damaged bulwark is about 4 feet in length and is shown as Item SBS/8 on Section 7-B of Reference FA-S1101-1 Shell Expansion. Work also includes reconnecting up to 4 deck mounted bulwark vertical structural steel supports in Section 7-B with up to 7 inches of weld on each side of the support.

34 Paragraphs 4.1.10 thru 4.1.12 in Item 11100 were changed to reflect the interference, insulation and paint requirements. These paragraphs were changed

FROM:

4.1.10 Remove all interferences in way of affected structural repairs. Interferences may include but are not limited to: Insulation, machinery, wiring/cabling, decking, deck support structure, piping, and foundations.

4.1.11 It is assumed that all steel structure and fittings will have to be coated in accordance with reference 2.5.

4.1.12 It is assumed that half of all listed structure will need to be insulated in accordance with references 2.3 and 2.4.

TO:

4.1.10 With the exception of items listed under 4.1.8, remove all interferences in way of affected structural repairs. Interferences may include but are not limited to: Insulation, machinery, wiring/cabling, decking, deck support structure, piping, and foundations.

4.1.11 With the exception of items listed under 4.1.8, it is assumed that all steel structure and fittings will have to be coated in accordance with reference 2.5.

4.1.12 With the exception of items listed under 4.1.8, it is assumed that half of all listed structure will need to be insulated in accordance with references 2.3 and 2.4.

35 Changed paragraph 4.1 in Item 55820 FROM: Provide all design services, labor and materials necessary to accomplish the strengthening of eight (8) bulwark mounted chocks located on the port and starboard sides of the ship from frame 75 TO 115.

TO: Provide all design services, labor and materials necessary to accomplish the strengthening of eight (8) bulwark mounted chocks located on the port and starboard sides of the ship from frame 75 TO 115. The contractor shall provide engineering services to complete the design.

36 Changed paragraph 4.7.2 of Item 16311.

FROM: Sandblasting and High Pressure Wash: Upon completion of the water wash in par. 4.6, the freeboard shall be abrasive blasted to a "Near White" finish in accordance with SSPC Specification No. SP-10. The entire freeboard and screens to be abrasive blasted as part of this item. The surface profiles of the SP-10 blasted locations shall be measured and verified to meet the surface preparation requirements of the anti-corrosive primer. The COR may request these records to verify. The hull surface preparation shall be divided into sections for timing purposes as necessary to ensure that a “Near White” SP-10 surface is maintained when primer coat is applied.

TO: Sandblasting and High Pressure Wash: Upon completion of the water wash in par. 4.6, the freeboard shall be abrasive blasted to a "Near White" finish in accordance with SSPC Specification No. SP-10 in the areas designated for repair. The surface profiles of the SP-10 blasted locations shall be measured and verified to meet the surface preparation requirements of the anti-corrosive primer. The COR may request these records to verify. The hull surface preparation shall be divided into sections for timing purposes as necessary to ensure that a “Near White” SP-10 surface is maintained when primer coat is applied.

(END OF AMENDMENT 0007)