Attachment IV - Price Schedule (Rev. 1).xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 1305M224QNMAN0313
About this file
This document is a Price Schedule for Request for Quotations (RFQ) 1305M224Q0313, which is for the Intermediate Drydocking and Repairs to the NOAA Ship GORDON GUNTER. The Price Schedule includes a Base Items section with 48 line items for various types of annual inspections, maintenance, and repair work. There is also an Additional Items - Growth section for Additional Item Requests (AIRs) that may be issued during the contract, including estimated labor rates and material markup. Option Items are listed separately, including work such as access/egress, "A-frame" bearing replacement, and hull coating.
The related federal contract opportunity is Solicitation Number 1305M224QNMAN0313 for the FY 25 Intermediate Drydocking and Repairs to NOAA Ship GORDON GUNTER. This is being issued by the Department of Commerce National Oceanic and Atmospheric Administration. Interested vendors should request the Specification Reference Documents from the contracting office contacts provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Attachment VI - DOL Employee Rights Jobsite Poster.pdf | ||
| COMBINED SYNOPSIS-SOLN.pdf | ||
| Attachment IV - Price Schedule.xlsx | XLSX spreadsheet | |
| Attachment V - NOAA EAD AIRS PROCESS.pdf | ||
| Attachment II-Past Performance Information Form.pdf | ||
| Attachment 1-GU FY25 Drydock Rev (C).pdf | ||
| Attachment III-Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price schedule
| REQUEST FOR QUTATIONS 1305M224Q0313, Attachment IV (REV, 1), NOAA Ship GORDON GUNTER INTERMEDIATE DRYDOCKING AND REPAIRS | ||||||
| PRICE SCHEDULE | ||||||
| BASE ITEMS | ||||||
| CLINS 1000 AND 2000 | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 2 | GENERAL REQUIREMENTS | 1 | JB | |||
| 3.1 | ANNUAL LIFE RAFT INSPECTION | 1 | JB | |||
| 3.2 | SURVIVAL SUIT INSPECTION AND CERTIFICATION | 1 | JB | |||
| 3.3 | ANNUAL MIRANDA INSPECTION AND MAINTENANCE | 1 | JB | |||
| 3.4 | ANNUAL FAST RESCUE BOAT (FRB) INSPECTION AND MAINTENANCE | 1 | JB | |||
| 3.5 | ANNUAL FIRE INSPECTION AND CERTIFICATIONS | 1 | JB | |||
| 3.6 | ANNUAL WEIGHT TESTING OF LIFTING APPLIANCES | 1 | JB | |||
| 3.7 | ANNUAL NAVIGATION AND COMMUNICATION | 1 | JB | |||
| 3.8 | ANNUAL MAIN PROPULSION MOTOR SERVICE | 1 | JB | |||
| 3.9 | ANNUAL MARINE SANITATION DEVICE (MSD) SERVICE | 1 | JB | |||
| 3.1O | ANNUAL OILY WATER SERVICE (OWS) | 1 | JB | |||
| 3.11 | SWITCHBOARD CLEANING AND GENERATOR INSPECTION (ANNUAL) | 1 | JB | |||
| 3.12 | GREY AND BLACK WATER PIPING | 1 | JB | |||
| 3.13 | BILGE CLEANING | 1 | JB | |||
| 3.14 | OILY WASTE REMOVAL | 1 | JB | |||
| 3.15 | STAND-ALONE AIR CONDITIONING UNITS SERVICING THE SERVER ROOM, PILOT HOUSE | 1 | JB | |||
| 3.16 | A-FRAME MAINTENANCE | 1 | JB | |||
| 3.17 | ANCHOR CHAIN MAINTENANCE | 1 | JB | |||
| 3.18 | SHOWER DECK RE-SEALING | 1 | JB | |||
| 3.19 | THERMOGRAPHIC SURVEY | 1 | JB | |||
| 3.2O | STERN TUBE PUMPS | 1 | JB | |||
| 3.21 | GAUGE CALIBRATION | 1 | JB | |||
| 3.22 | GENERATOR ROOM VENTILATION WIRING | 1 | JB | |||
| 3.23 | COATINGS REPAIR - FLYBRIDGE | 1 | JB | |||
| 3.24 | SSDG SERVICING | 1 | JB | |||
| 3.25 | DRYDOCK TEMPORARY SERVICES (ADDITIONAL) | 1 | JB | |||
| 3.26 | DRYDOCKING AND ROUTINE DRYDOCK WORK | 1 | JB | |||
| 3.27 | HULL VALVE MAINTENANCE | 1 | JB | |||
| 3.28 | REFRIGERATION PLANTS TUNE UP/SERVICE/MAINTENANCE | 1 | JB | |||
| 3.29 | OPERABILITY AND MAINTAINABILITY | 1 | JB | |||
| 3.3O | STEERING HYDRAULICS | 1 | JB | |||
| 3.31 | GALLEY HOOD DUCT CLEANING | 1 | JB | |||
| 3.32 | MISCELLANEOUS STEEL REPLACEMENT | 1 | JB | |||
| 3.33 | ANODE REPLACEMENT | 1 | JB | |||
| 3.34 | MAIN PROPULSION MOTORS COMMUTATOR SERVICING | 1 | JB | |||
| 3.35 | MAIN PROPULSION SHAFT SEAL REPLACEMENT | 1 | JB | |||
| 3.36 | CHILL WATER VENTS | 1 | JB | |||
| 3.37 | SSDG VALVES | 1 | JB | |||
| 3.38 | BRIDGE SUNSHADES | 1 | JB | |||
| 3.39 | WET LAB DECK COATING REPLACEMENT | 1 | JB | |||
| 3.4O | COATINGS INSPECTIONS | 1 | JB | |||
| 3.41 | FLOORING REPLACEMENT-CO STATEROOM | 1 | JB | |||
| 3.42 | GYRO COMPASS | 1 | JB | |||
| 3.43 | DOCK TRIALS AND SEA TRIALS | 1 | JB | |||
| 3.44 | COATING SYSTEM REPAIR | 1 | JB | |||
| 3.45 | PHOTOLUMINESCENT MARKINGS | 1 | JB | |||
| 3.46 | AC PLANTS REPLACEMENT | 1 | JB | |||
| 3.47 | BULWARK REPLACEMENT | 1 | JB | |||
| 3.48 | PROFIBUS UPGRADE | 1 | JB | |||
| Total Base Items | $0.00 | |||||
| ADDITIONAL ITEMS - GROWTH | ||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 3000 and 4000 | 4.1 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate
| Unit Price: $________; Quantity: 1,000; Unit of Issue: Hour; Extended Price: $____________ | HRS | EST 1,000 | |
| 3000 and 4000 | 4.1 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $70,000; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$70,000 X percentage quoted]: $____________ | % | EST $70,000 | |||||
| N/A | Additional Temp Services (See CAR Clause 1352.271-86) | EST 1 | DAY | ||||
| N/A | Laydays (See CAR Clause 1352.271-89) | EST 1 | DAY | ||||
| Total Growth | $0.00 | ||||||
| OPTION ITEMS | |||||||
| Note: These items may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | |||||||
| CLIN 5000 | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 5.1 | ACCESS AND EGRESS (HATCH INSTALLATION) | 1 | JB | ||||
| 5.2 | "A-FRAME" BEARING REPLACEMENT | 1 | JB | ||||
| 5.3 | COATING SYSTEM REPAIR-STACKS | 1 | JB | ||||
| 5.4 | TEMPORARY PLATFORM | 1 | JB | ||||
| 5.5 | COATINGS REPLACEMENT-AFT | 1 | JB | ||||
| 5.6 | COATINGS REPAIR-TOPSIDE | 1 | JB | ||||
| 5.7 | ADDITIONAL PIER SERVICES | 1 | JB | ||||
| 5.8 | HULL COATING | 1 | JB | ||||
| 5.9 | COATINGS REPAIR-FORWARD | 1 | JB | ||||
| Total Option Items | $0.00 |
| BASE | $0.00 |
| BASE + OPTIONS | $0.00 |
| BASE + OPTIONS +GROWTH | $0.00 |
FF0000Attachment IV RFQ 1305M222QNMAN0074 NOAA Ship Bell M. Shimada Drydock