Exchequer IRSC - Section B.2.rev1.pdf

PDF 257 KB Posted

Attached to
Exchequer IRSC Stewardship Federal contract opportunity
Solicitation number
129JGP20R4008
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

This document contains a federal stewardship contract solicitation for the Exchequer IRSC project located on the Sierra National Forest in California. The solicitation requires mandatory and optional work items including sawlog removal, road maintenance and reconstruction, hazard tree felling and skidding, biomass thinning and removal. It estimates 57,615 tons of sawtimber, unspecified tons of cull logs and biomass for removal. Pricing is estimated between $30,000 to $150,000. The response date is in the uploaded solicitation package dated May 14, 2020. The award date is expected within 60 days of the response date. A prebid meeting is scheduled for May 28, 2020 on site. Interested parties should monitor beta.sam.gov for amendments and direct technical questions to the contact listed in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Exchequer IRSC Stewardship, newest first.
File Type Posted
Exchequer IRSC - Cruise.docx DOCX document
Amendment 1.pdf PDF
Exchequer_SiteVisit_Attendees.pdf PDF
Appendix A - Exchequer.rev1.pdf PDF
Map - Exchequer Slash Work-NoArc.pdf PDF
Appendix B - Exchequer.rev1.pdf PDF
Exchequer IRSC - QandA.1.pdf PDF
Attachment 6. Work in Heritage Sites.pdf PDF
YT_LOP Exemption Units Timber20200602.pdf PDF
Appendix B - Scaled-Exchequer.pdf PDF
Appendix D - Exchequer-Drawings.pdf PDF
Map - Exchequer_CAM_NoArc_04_30_20.pdf PDF
Appendix D - Exchequer-Specifications FP14.pdf PDF
129JGP20R4008 - Exchequer IRSC.pdf PDF
Fire Plan - Exchequer.pdf PDF
Appendix C - Exchequer.pdf PDF
Wage Determination DBA-CA20200007.pdf PDF
Appendix A - Exchequer.pdf PDF
Wage Determination SCA-1977-0727.pdf PDF
Experience Questionnaire.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exchequer IRSC – Section B.2 – Revision 1

B.2 SCHEDULE OF ITEMS

B.2.1 MANDATORY WORK ACTIVITIES:

Contractor Name

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK

ACTIVITIES

UNIT ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

1 Removal of Sawlogs from Public Land

Acres 1445 XXXXXX XXXXXX

2 Road Maintenance Miles 29.90 $ $

3 Road Reconstruction (see schedule B.2.4) Miles 10.41 $ $

4 Felling Cull Hazard Trees Miles 33.40 $ $

5 Skidding and Decking Cull Hazard Trees

Miles 25.40 $ $

Total All Mandatory Service Items $

B.2.2 OPTIONAL WORK ACTIVITIES:

Contractor Name

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK

ACTIVITIES

UNIT ESTIMATED

QUANTITY

UNIT

PRICE TOTAL

6 Skidding and Decking Cull Hazard Trees Miles 8.00 $ $

7 Remove Cull Logs from Forest Ton 4,000 $ $

8 Biomass Thin and Stack at Landing Acres 1445 $ $

9 Remove Biomass from Forest Ton 5,000 $ $

Total All Optional Service Items $

B.2.3 TIMBER OR OTHER PRODUCTS REMOVAL PRICE SCHEDULE:

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

OFFER

CS Sawtimber 57,615 Ton $5.72 $ $

CS Cull Logs Unestimated Ton $0.10 $ $

CS Biomass Unestimated Ton $0.10 $ $

Total – All Products $

Associated Charges shall be collected in lieu of contractor performance of activities for which the costs are associated (i.e. Surface Rock Replacement Deposits).

Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

NOTE: Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Option Work Activities and Timber or other products Removal Price Schedule.

B.2.4 ROAD RECONSTRUCTION:

Road No. All Roads

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization LS 1 $________ $_________

Total Price $_________

Road No. 10S013, Big Fir Length: 3.55 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of Timber 1

STA 187.4 $________ $_________

204(71) Roadway Excavation, Placement Method 4 CY 8 $________ $_________

303(02) Recondition Roadbed, Compaction A STA 187.4 $________ $_________

Road No. 10S013G, Stock Drive Length: 0.91 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 40.4 $________ $_________

203(01) Remove Log (Tree in Road) LS 1 $________ $_________

204(71) Roadway Excavation, Repair Pothole CY 57 $________ $_________

251(11) Hand Placed Riprap, Class II CY 10 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 40.4 $________ $_________

Road No. 10S013H, Windmill Length: 0.08 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 4.65 $________ $_________

204(71) Roadway Excavation, Repair Pothole CY 8 $________ $_________

251(11) Hand Placed Riprap, Class II CY 18 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 4.65 $________ $_________

Road No. 10S032A, Skunk Length: 1.58 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 83.65 $________ $_________

203(01) Remove Log (Tree in Road) LS 1 $________ $_________

204(20) Drainage Excavation, Type Restore Drainage Function LS 1 $________ $_________

204(70) Roadway Excavation, Placement Method 4 LS 1 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 83.65 $________ $_________

430(12) Place Cold Mix Asphalt in Potholes Various Locations (Includes Tack Coat Material) TON 5 $________ $_________

607(03) Remove and Relay Cmp (Plugged) LS 1 $________ $_________

Road No. 10S034B, Dyke Length: 0.53 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 28 $________ $_________

204(19)D Drainage Excavation, Type Leadoff Ditch LF 75 $________ $_________

251(11) Hand Placed Riprap, Class II Placement Method 4 CY 6.5 $________ $_________

301(09) Crushed Aggregate, Type Surface Course, Grading 2 Compaction A TON 25 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 28 $________ $_________

303(20)C Drainage Excavation, Construct Dip EA 4 $________ $_________

Road No. 10S095, Whimper Length: 0.35 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 18 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 18 $________ $_________

Road No. 10S099 Seg 1, Bear Creek Road Length: 0.58 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

251(11) Hand Placed Riprap, Class II CY 10 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 30.85 $________ $_________

Road No. 10S407, Laurel Length: 0.18 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 6, Logs 8, Stumps 4, Utilization of

STA 9.5 $________ $_________

204(70) Roadway Excavation, Placement Method 4 LS 1 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 9.5 $________ $_________

Road No. 10S433, Grosbeak Length: 2.07 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

151(01) Mobilization LS 1 $________ $_________

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 122.65 $________ $_________

204(70) Roadway Excavation, Placement Method 4 STA 170 $________ $_________

251(11) Hand Placed Riprap, Class II CY 2 $________ $_________

Compaction A TON 3 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 122.65 $________ $_________

303(20)C Drainage Excavation, Construct Dip EA 15 $________ $_________

Road No. 10S434, Bear Border Length: 0.38 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 20 $________ $_________

204(19)B Drainage Excavation, Type 2' Deep Roadway Ditch LF 185 $________ $_________

251(11) Hand Placed Riprap, Class II CY 13 $________ $_________

Compaction A TON 50 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 20 $________ $_________

303(20)C Drainage Excavation, Construct Dip EA 5 $________ $_________

602(02)A 18-Inch Corrugated Metal Pipe, 0.064-Inch Thickness for Steel Or 0.060-Inch Thickness for Aluminum, Method B

LF 32 $________ $_________

Road No. 11S040T2.52, McKinley Grove T2 Length: 0.20 MI

ITEM

NO. DESCRIPTION UNIT EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

201(05) Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs 11, Logs 8, Stumps 4, Utilization of

STA 10.35 $________ $_________

203(04)B Remove Cmp From Forest Service Land EA 1 $________ $_________

204(19)D Drainage Excavation, Type Leadoff Ditch LF 40 $________ $_________

251(11) Hand Placed Riprap, Class II CY 6.5 $________ $_________

Compaction A TON 75 $________ $_________

303(02) Reconditioning of Roadbed, Compaction A STA 10.35 $________ $_________

303(20)C Drainage Excavation, Construct Dip EA 1 $________ $_________

303(20)G Drainage Excavation, Construct Driveable Waterbar EA 1 $________ $_________

File details come from the government source that posted it. Updated .