This solicitation seeks offers for a stewardship contract to perform forest management services on approximately 1,445 acres of the Exchequer Project located on the Sierra National Forest. Mandatory work items include removal of sawlogs from public lands, road maintenance on 29.90 miles of system roads, road reconstruction on 10.41 miles of system roads, felling of cull and hazard trees on 33.40 miles, and skidding and decking cull and hazard trees on 33.40 miles. Optional work items include removal of cull logs and biomass in unestimated tons and biomass thinning and stacking at landings on 1,445 acres. The estimated price range for construction is between $30,000 and $150,000. Offers are due by the response date stated in the solicitation package, with an award expected within 60 days thereafter. A prebid meeting is scheduled for May 28, 2020. The purpose of the notice is to meet the FAR requirements for full and open competition solicitation. The solicitation was released by the USDA Forest Service Pacific Southwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| YT_LOP Exemption Units Timber20200602.pdf | ||
| Exchequer_SiteVisit_Attendees.pdf | ||
| Appendix A - Exchequer.rev1.pdf | ||
| Map - Exchequer Slash Work-NoArc.pdf | ||
| Appendix B - Exchequer.rev1.pdf | ||
| Exchequer IRSC - QandA.1.pdf | ||
| Exchequer IRSC - Cruise.docx | DOCX document | |
| Amendment 1.pdf | ||
| Exchequer IRSC - Section B.2.rev1.pdf | ||
| Wage Determination SCA-1977-0727.pdf | ||
| Experience Questionnaire.docx | DOCX document | |
| 129JGP20R4008 - Exchequer IRSC.pdf | ||
| Fire Plan - Exchequer.pdf | ||
| Appendix C - Exchequer.pdf | ||
| Wage Determination DBA-CA20200007.pdf | ||
| Appendix A - Exchequer.pdf | ||
| Appendix B - Scaled-Exchequer.pdf | ||
| Appendix D - Exchequer-Drawings.pdf | ||
| Map - Exchequer_CAM_NoArc_04_30_20.pdf | ||
| Appendix D - Exchequer-Specifications FP14.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 6. Work in Heritage Sites
Felling and removal of hazard, salvage, and other trees within historic properties may be permitted under the following conditions:
(1) Trees may be limbed or topped to prevent soil gouging during felling;
(2) Felled trees may be removed using only the following techniques: hand bucking, including use of chain saws, and hand carrying, rubber tired loader, crane/self-loader, helicopter, or other non-disturbing, HPM-approved methods;
(3) Equipment operators shall be briefed on the need to reduce ground disturbances (e.g., minimizing turns);
(4) No skidding (Including rubber-tired skidders) nor tracked equipment shall be allowed within historic property boundaries;
and
(5) Where monitoring is a condition of approval, its requirements or scheduling procedures should be included in the written approval.