This solicitation seeks offers for a stewardship contract to perform forest management services on approximately 1,445 acres of the Exchequer Project located on the Sierra National Forest. Mandatory work items include removal of sawlogs from public lands, road maintenance on 29.90 miles of system roads, road reconstruction on 10.41 miles of system roads, felling of cull and hazard trees on 33.40 miles, and skidding and decking cull and hazard trees on 33.40 miles. Optional work items include removal of cull logs and biomass in unestimated tons and biomass thinning and stacking at landings on 1,445 acres. The estimated price range for construction is between $30,000 and $150,000. Offers are due by the response date stated in the solicitation package, with an award expected within 60 days thereafter. A prebid meeting is scheduled for May 28, 2020. The purpose of the notice is to meet the FAR requirements for full and open competition solicitation. The solicitation was released by the USDA Forest Service Pacific Southwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to Exchequer IRSC Stewardship, newest first.
File Type Posted
YT_LOP Exemption Units Timber20200602.pdf PDF
Exchequer_SiteVisit_Attendees.pdf PDF
Appendix A - Exchequer.rev1.pdf PDF
Map - Exchequer Slash Work-NoArc.pdf PDF
Appendix B - Exchequer.rev1.pdf PDF
Exchequer IRSC - QandA.1.pdf PDF
Exchequer IRSC - Cruise.docx DOCX document
Amendment 1.pdf PDF
Exchequer IRSC - Section B.2.rev1.pdf PDF
Wage Determination SCA-1977-0727.pdf PDF
Experience Questionnaire.docx DOCX document
129JGP20R4008 - Exchequer IRSC.pdf PDF
Fire Plan - Exchequer.pdf PDF
Appendix C - Exchequer.pdf PDF
Wage Determination DBA-CA20200007.pdf PDF
Appendix A - Exchequer.pdf PDF
Appendix B - Scaled-Exchequer.pdf PDF
Appendix D - Exchequer-Drawings.pdf PDF
Map - Exchequer_CAM_NoArc_04_30_20.pdf PDF
Appendix D - Exchequer-Specifications FP14.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6. Work in Heritage Sites

Felling and removal of hazard, salvage, and other trees within historic properties may be permitted under the following conditions:

(1) Trees may be limbed or topped to prevent soil gouging during felling;

(2) Felled trees may be removed using only the following techniques: hand bucking, including use of chain saws, and hand carrying, rubber tired loader, crane/self-loader, helicopter, or other non-disturbing, HPM-approved methods;

(3) Equipment operators shall be briefed on the need to reduce ground disturbances (e.g., minimizing turns);

(4) No skidding (Including rubber-tired skidders) nor tracked equipment shall be allowed within historic property boundaries;

and

(5) Where monitoring is a condition of approval, its requirements or scheduling procedures should be included in the written approval.