Updated SOI_August Fire CG Road Repairs Final.20240719.pdf

PDF 129 KB Posted

Attached to
Disaster, August Campground Road Repairs Federal contract opportunity
Solicitation number
12970224R0048
Issued by
Department of Agriculture Forest Service

About this file

This document appears to be a bid schedule for a federal contract opportunity related to road repair and related work on three campground roads and one Forest Road. The contract work includes road reconditioning, asphalt concrete overlay, mobilization, excavation/embankment construction, aggregate base, temporary traffic control, and other associated tasks. The contract opportunity is for the Department of Agriculture Forest Service, with a solicitation number of 12970224R0048, and a period of performance of 160 days from notice to proceed. The bid schedule provides detailed line items with estimated quantities and unit prices for the required work across the four road locations. The total base contract amount and an option for contractor quality control are provided. This document contains the key details of the required products and services for this federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Disaster, August Campground Road Repairs, newest first.
File Type Posted
12970224R0048_RFI_Questions 1-13.pdf PDF
Sht03_Campground Rd Work Items Amend 0001.pdf PDF
Hell Gate New ADA ramp Amend 0001.jpg JPG image
12970224R0048 Amendment 0001.pdf PDF
Sht06_Hell Gate CG Road Amend 0001.pdf PDF
Sht 02 Gen Notes and Quantities Amend 0001.pdf PDF
Disposal Site - Scott Flat Amend 0001.jpg JPG image
August Site Visit Roster - Amend 0001.pdf PDF
CA20240007 05-24-2024 - Shasta County.pdf PDF
FSSS_August Fire CG Road Repairs.pdf PDF
Fire Plan_Rev Nov 2023.doc DOC document
August Fire CG Roads - Map.pdf PDF
RFP 12970224R0048 Disaster August CG Road Repairs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS BID SCHEDULE

ITEM NO.

DESCRIPTION

PAY UNIT

ESTIMATED

QUANTITY

UNIT PRICE

TOTAL PRICE

Forest Glen Campground Road

15101A Mobilization Lump Sum 1 $ $

20431A Excavation/Embankment Construction Linear Foot 15 $ $

30104A 3" Aggregate Base - CalTrans 3/4" Class 2, Compaction B, Spurs/Parking & Access Paths

Cubic Yard 45 $ $

30316A Roadway Reconditioning, Placement Method 2, CG Roads Square Yard 1170 $ $

30316-01A Roadway Reconditioning, Placement Method 2, CG Spurs/Parking

Square Yard 550 $ $

40304A 2" Asphalt Concrete Overlay - 1/2'' 'B' Type PG64-10 (w/Tack Coat Application)

Square Yard 1005 $ $

63501A Temporary Traffic Control Lump Sum 1 $ $

Subtotal - Forest Glen CG - Base Contract $

Hell Gate Campground Road

15101B Mobilization Lump Sum 1 $ $

21101B Roadway Obliteration Lump Sum 1 $ $

20431B Excavation/Embankment Construction Linear Foot 115 $ $

30104B

3" Aggregate Base - CalTrans 3/4" Class 2, Compaction B, Spurs/Parking & Access Paths, at Agg & AC Road Surfacing

Cubic Yard

30104-01B

4" Aggregate Base - CalTrans 3/4" Class 2, Compaction B, CG Spur/Parking Areas

30316B

Roadway Reconditioning, Placement Method 2, CG Roads

Square Yard

40304B

2" Asphalt Concrete Overlay - 1/2'' 'B' Type PG64-10 (on 3'' AB w/Prime Coat Application)

Square Yard

63501B Temporary Traffic Control Lump Sum 1 $ $

Subtotal - Hell Gate CG - Base Contract $

Scott Flat Campground Road

15101C Mobilization Lump Sum 1 $ $

20426C Drainage Excavation/Embankment, Rolling Dip Each 2 $ $

20431C Excavation/Embankment Construction Linear Foot 100 $ $

21101C Roadway Obliteration Lump Sum 1 $ $

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS BID SCHEDULE

30104C

30122C

Natural Ford - Gradation O

30316C Roadway Reconditioning, Placement Method 2, CG Roads Square Yard 7120 $ $

60201-18C 18-inch pipe culvert, CMP, 16 gage, compaction method 2 Foot 20 $ $

61901C Furnish & Place 250 New Boulders & Relocate 250 Existing Boulders (225 at Scott Flat and 25 at Hell Gate) a Total of 500 Boulders.

Lump Sum 1 $ $

63501C Temporary Traffic Control Lump Sum 1 $ $

Subtotal - Scott Flat CG Base Contract $

Forest Road 1S26

15101D Mobilization Lump Sum 1 $ $

20408D Roadway Evcaction (Existing Pavement) Cubic Yard 35 $ $

30104D

30316D Roadway Reconditioning, Placement Method 2, Road Square Yard 1165 $ $

30316-01D Roadway Reconditioning, Placement Method 2, Parking Area Square Yard 140 $ $

40304D 3" Asphalt Concrete Overlay - 1/2'' 'B' Type PG64-10 (on 3'' AB w/Prime Coat Application) Square Yard 275 $ $

40304-01D 2" Asphalt Concrete Overlay - 1/2'' 'B' Type PG64-10 (w/Tack Coat)

Square Yard 740 $ $

63501D Temporary Traffic Control Lump Sum 1 $ $

Subtotal - 1S26 $

TOTAL BASE CONTRACT

OPTION WORK 1 – Contractor Quality Control

15301 Contractor Quality Control Lump Sum 1 $ $

TOTAL – BASE CONTRACT + OPTION WORK 1 $