P.2 Schedule of Items.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Trimmer & Auberry Station and Work Center
- Solicitation number
- 12970224R0024
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items pricing template for the Trimmer & Auberry New Construction project at Sierra National Forest High Sierra Ranger District in Fresno County. The template breaks down pricing into five main categories: Conceptual Design, Design Development, Construction Documents, Administration, and Construction.
The construction items include site preparation, landscaping, construction survey and staking, quality control, parking lots with lighting and masonry walls, utilities including septic systems, an engine garage, two barracks buildings, water system distribution redesign and replacement, a 50,000-gallon water tank installation, entrance signage and flag pole, and two prefabricated buildings (one at Auberry Station and one at Trimmer Work Center). The template is structured to capture base bid items and one additional bid item (Barracks 2), with spaces for contractors to input pricing for each line item. This pricing schedule supports the broader design-build contract for replacing facilities lost during the Creek Fire.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 SCHUDULE OF VALUES (draft) TRIMMER & AUBERRY NEW CONSTRUCTION
SIERRA NATIONAL FOREST HIGH SIERRA RANGER DISTRICT FRESNO COUNTY
| ITEM NO. | DESCRIPTION | PRICE |
| Conceptual Design | ||
| Base Bid Item 1A | Design Kick‐Off Meeting and Site Visits/Travel | |
| Base Bid Item 1B | Conceptual Design Verification of Barracks & Engine Garage | |
| Subtotal | 0 | |
| Design Development | ||
| Base Bid Item 2A | Design Development – 65% | |
| Base Bid Item 2B | Engineering Value Analysis Report | |
| Subtotal | 0 | |
| Construction Documents | ||
| Base Bid Item 3A | Construction Documents @ 95% | |
| Base Bid Item 3B | Construction Documents @ 100% | |
| Subtotal | 0 | |
| Administration | ||
| Base Bid Item 4A | Construction Administration | |
| Subtotal | 0 | |
| Construction | ||
| Base Bid Item 5A | Site Preparation and Landscaping (demolition & disposal, clearing, |
earthwork and subgrade compaction)
| Base Bid Item 5B | Construction Survey & Staking |
| Base Bid Item 5C | Quality Control |
| Base Bid Item 5D | Parking Lots including Lighting and masonry wall |
| Base Bid Item 5E | Utilities including septics for trimmer and auberry |
| Base Bid Item 5F | Engine Garage |
| Base Bid Item 5G | Barracks 1 |
| Base Bid Item 5H | Water System Distribution Redesign, Replacement and Reconnecting |
| Base Bid Item 5I | Water Tank 50K Gallons Complete Installation and Reconnection, |
Including demolition of exiting 2 tanks
| Base Bid Item 5J | Entrance Sign at trimmer WC and Flag Pole at Helitack Bay | |
| Base Bid Item 5K | Pre‐Fab Building at Auberry Station, complete construction and utilities | |
| Base Bid Item 5L | Pre‐Fab Building at Trimmer WC, complete construction and utilities | |
| Bid Item 2 5M | Barracks 2 | |
| Subtotal | 0 |
| TOTAL BASE BID ITEMS |
| TOTAL BID ITEM 2 |
| TOTAL ALL ITMES (BASE, 2) |