R5 Modoc NF Wide Bridge Rpr Mntnce RFI Log.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
MODOC NF Wide Bridge Repair Maintenance Solicitation
Solicitation number
12970224R0006
Issued by

About this file

This document contains a log of questions and responses related to a solicitation for bridge repair and maintenance work on the Modoc National Forest. The solicitation seeks a contractor to perform work on 13 bridges, including approaches, substructures, superstructures, decks, wearing surfaces, and traffic safety features. The work involves furnishing all labor, materials, equipment and other incidentals. Questions addressed include clarification on the bid bond amount, required bridge rail end treatments, equipment wash locations, and RFI submission deadlines. Responses provide details on the 20% or $200,000 bid guarantee, preference for a rounded bull-nose rail end section, allowance for on-site equipment washing with Forest Service approval, and a closing date for RFIs of 5 calendar days before the solicitation closes.

View the file

Other files

File Type Posted
R5 Modoc NF Wide Bridge Rpr Mntnce RFI Log 3-13-2024.xlsx XLSX spreadsheet
12970224R0006 Amendment 2.pdf PDF
12970224R0006- Amendment 1.pdf PDF
10. WD CA20230007 20240209.pdf PDF
4. Drawings.pdf PDF
3. Specifications.pdf PDF
2. SOW.pdf PDF
1. SOI.pdf PDF
8. 2850_Doublehead Mineral Material Sites.pdf PDF
9. 2850_WarnerMts_ Material_Sites.pdf PDF
7. 2850_Devils_Garden_MinMat_Sites.pdf PDF
6. 2850_All Mineral Material Sites.pdf PDF
5. 2850_All Big Valley Sites.pdf PDF
12970224R0006.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

R5-Modoc NF Wide Bridge Rpr & Mntnce RFI Log
Updated3/6/24 11:47
RFI NumberRFI QuestionGovernment RFI ResponseNotes
1The bid bond amount says 100%, should this be 10% which is typical.The amount of the bid guarantee shall be 20% percent of the bid price or $200,000.00, whichever is less.
2Regarding the rail end treatments, there are 2 or 3 different types that can be used, do you have a specific one that is called out. Sorry I could not find it in the specs.We’re seeking a rounded, bull-nose style end section with breakaway assembly. The approach rail should flare out from the bridge rail and the end section should be offset from the edge of travelled way at least 3 feet.
3Could you please provide the sign-in sheet from the site visit?A sign-in sheet was not collected. There were 2 representatives in attendance, one from Larranaga Trucking, Inc. and one from Judd Buick Construction, Inc.
4
Please confirm if RFIs are due 5 calendar days or 10 calendar day prior to the close of the solicitation.RFI's will close 5 calendar days prior to the close of the solicitation.
5
Please confirm if RFIs are due 5 calendar days or 10 calendar day prior to the close of the solicitation.All times for submissions of offers and RFI's are in Mountain Time.
6Does the 50’ of AC also need new AB under it?Per drawing sheet 3, USFS requires a minimum AB depth of 6 inches. USFS-provided material sources have been identified to supply this when needed.
7Under wildlife conservation measures it states all previously painted members shall be repainted. Does this include every and all surfaces? Does this include the galvanized guard rail?Girders and guardrails are the members that need painting. Some of the galvanized rails were previously painted and USFS wishes to restore these to new condition and appearance. Members that were not previously painted do not require new paint.
8Botany mitigation measures. Can we clean the equipment at each site before moving to next or does in need to be hauled off to be washed?Equipment may be washed on site before moving on to the next location. Wash locations must be approved by the Forest Service in advance. Equipment should be loaded onto the transport trailer and then washed to ensure the site remains tidy and no contaminated mud is tracked off site.

image1.jpeg image2.jpeg