12970224R0006 Amendment 2.pdf

PDF 127 KB Posted

Attached to
MODOC NF Wide Bridge Repair Maintenance Solicitation
Solicitation number
12970224R0006
Issued by

About this file

This amendment to a solicitation provides additional details for a contract to perform maintenance and repairs on 13 bridges throughout the Modoc National Forest. The work includes maintenance and improvements to approaches, channels, substructures, superstructures, decks, wearing surfaces, and traffic safety features of the bridges. The contractor will furnish all labor, materials, equipment, mobilization, and incidentals to complete the specified work. The amendment answers questions submitted and provides an attachment with additional information. The response deadline is extended to March 15, 2024 at 5:00PM Mountain Time.

View the file

Other files

File Type Posted
R5 Modoc NF Wide Bridge Rpr Mntnce RFI Log 3-13-2024.xlsx XLSX spreadsheet
12970224R0006- Amendment 1.pdf PDF
R5 Modoc NF Wide Bridge Rpr Mntnce RFI Log.xlsx XLSX spreadsheet
10. WD CA20230007 20240209.pdf PDF
4. Drawings.pdf PDF
3. Specifications.pdf PDF
2. SOW.pdf PDF
1. SOI.pdf PDF
8. 2850_Doublehead Mineral Material Sites.pdf PDF
9. 2850_WarnerMts_ Material_Sites.pdf PDF
7. 2850_Devils_Garden_MinMat_Sites.pdf PDF
6. 2850_All Mineral Material Sites.pdf PDF
5. 2850_All Big Valley Sites.pdf PDF
12970224R0006.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12970224R0006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

WASHINGTON DC 20250-0001

1400 INDEPENDENCE AVE SW MS-1138

SPOC SOUTHWEST

USDA FOREST SERVICE

IIJA02/15/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/15/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Answer RFI's 8-13.

2. Incorporate attachment R5 Modoc NF Wide Bridge Rpr Mntnce RFI Log 3-13-2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOHN T. KAMERER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

3/15/2023 5:00PM MT

File details come from the government source that posted it. Updated .