This document is a well drilling log spanning from August 1937 through May 1938, documenting the progressive drilling activities, geological formations encountered, and operational challenges at a new well site near Dubois/Idaho Falls, Wyoming.
The drilling operation began in August 1937 at a depth of 5 feet and advanced to 440 feet by the end of the documented period in May 1938. The well encountered predominantly volcanic formations including lava, basalt, ryolite, ash layers, and cinders in the upper sections (0-350 feet), followed by grey and dark grey sand, conglomerate, and black lava in deeper sections (350-763 feet). Significant operational difficulties included recurring equipment failures (broken wrist pins, manilla lines, spudding shafts, bond wheels, and samson posts), caving issues requiring hole straightening and refilling, and challenging drilling conditions through hard volcanic material. The operation involved multiple tool changes, bit resurfacing trips to Idaho Falls, casing installation (10-inch casing run to 717 feet with 26 sacks of cement), and a 24-hour pump test completed May 14-15, 1938, which yielded approximately 63 gallons per minute with a water level at 670 feet. The well reached total depth at 763-765 feet by May 1938, with final activities including liner installation, cleaning operations, and pump testing before completion.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date
A.u� 11st
II
II
II
II
II
II
II
II
II
II
II
2L
Log of New ·•rell --- Aup,1 st, 1937
Drilled li'rom
Bo
To ll15
Fonnation--Kind--Color--Hardness-l!uddy--Cav,v---etc.
Lava & Pasalt --soudding & ri�ging up ?asalt--jump8d pin on bit Ryolite or lava--afternoon tour un loading pipe--se+tin� up tools evening tour--run 12 1
1 pipe Lava & Ryolite--broke wrist pin--had it rcoaired Ryolitc, lava---changed over from wire to manilla line--took off sinker bar Lan--hard--broke manilla line--had to splice Lava--very herd and s0ttles back in hole bad--broke line aPain-- run in a cracker--had to repair it twice
Lava arrl layers of ash 2 or 3 feet
• thick
Lava and thin lAyPrs of cinders arrl ash-shut down dress down bit and temper Very hard lava--boulder fell across hole gave some little trouble--bond wheel slipped on shaft--shut down to fix it.
Lav- & ashes--caving lava, sane boulders caving in--rimmP.d hole--cavinr at bottom-took of popoPr--no hole ma0e--repairing bull wheel barrings
Alternete layPrs of l?.ve and ash-pink-broke spuddinf shaft--taking out spudding shaft and reoairi� bond wheel and machine
Did not work Auf1 st 11-19, incl., fishin.a for bit and having drill shaft welded.
No work, .n.u:;ust 29-Jlst,. havine shaft v1eldod.
Date
October 1
If 2
II 3
If 4 ff 5
It 6 n: 7
. II 8
" 9
" 10
Log of New Well--October, 1�37
Drilled From To
Fonnation---Kind---Color---Hardness Mudd_l-_=-Qavy---Etc.
Reamed, broke samson post. Tore down sampson post & spuddi r.g shaft
Got ·new timber for samson post
Framing new samsori post--setting in same-finished repairing machine
Reaming
Reaming
Strung up extra stem--broke beam-broke down e xtra tools & took off old beam
Went and broguht down b eam after sawing it ou t.
Started tea.ring down tools and rig
Still tearing down
Finished tearing down
No work October 10 to November 22 inclusive