Instructions Introduction
Green Globes® for New Construction (NC) is part of the Green Building Initiative’s (GBI) suite of Green Globes programs. The Green Globes NC assessment includes completion and review of the Green Globes NC survey as well as a Stage I Design Review and a Stage II On-site Assessment review. The survey and assessments aid the Integrated Design Process (IDP) team throughout the design process per the unique goals and needs of each individual project.
What is the Stage I assessment?
When your Green Globes NC online evaluation is complete through the Construction Documents survey and your project CD's are prepared, GBI will assign a third-party assessor to perform the Stage I Design Review. The assessor will review your responses in the online survey and compare them with the project documentation. The assessor will create a written report summarizing his/her initial findings, providing recommendations for improvement, and identifying missing documentation that should be made available during the Stage II Site Assessment. The report will also provide a projected Green Globes rating of one, two, three or four Green Globes that is based on the documentation available during the Stage I review. This rating assumes that all criteria verified during the Stage I assessment can be verified onsite during the Stage II assessment.
What is the Stage II assessment?
When construction and commissioning (if applicable) are essentially complete, GBI will schedule a third-party assessor to perform the Stage II Site Assessment for your project. Whenever possible, GBI will assign the same assessor for both your Stage I and Stage II assessments. Please note that the site visit typically must be scheduled at least 30 days in advance. In the weeks leading up to the site visit, your assessor will contact you to discuss the itinerary and specific details of the assessment. After the visit, your assessor will create a report of his/her findings that contains your recommended Green Globes score and rating. GBI will review the report and issue your Green Globes certification.
How long will the on-site assessment take?
The duration of the site visit varies considerably based on the scope and size of the completed building project. For buildings smaller than 50,000 square feet, please allow approximately 4 hours for the assessor to review new documentation onsite, conduct a thorough walk-through of your facility, and interview you and/or other designated representatives. Larger and more complex buildings may take one full day or more.
What documentation is required?
Below is a sample list of documents to gather while completing the online survey and provide to the assessor as part of the Stage I and/or Stage II assessments. Please note that this is not a comprehensive list of all possible documentation required, and your assessor may request documentation not provided in this list. You are expected to coordinate with your assigned assessor to ensure that you provide all required documentation for both assessments. The "Supporing Documentation" column in each of the following spreadsheets has been provided for you to identify the documentation specific to your project that supports each criterion. Itemizing your documentation in preparation for your Stage I and II assessments will greatly improve the organization of your project and help your third-party assessor verify compliance more efficiently.
In addition to itemizing your supporting documentation, it is recommended that you maintain a list of any Green Globes criteria for which you have questions, are seeking partial credit, or believe are non-applicable (N/A). The Green Globes online survey provides N/A responses for some criteria; however, assessors may use their professional judgment to classify additional items as N/A where justified. Ineligible for the N/A designation are all criteria pertaining to management, Energy Performance, and Water Performance.
| The following is a list of suggested documentation for a Green Globes NC assessment: |
| Section 1 - Project Management |
| Owner's Project Requirements (OPR) |
Division 01 specifications List of written performance goals Progress meeting agendas and meeting minutes List of key personnel and a description of their major tasks EMS plan to be used by the general contractor Description & photos of clean diesel practices Construction documents* Manufacturer’s specifications, cut sheets and performance documentation. (needed for a significant number of criteria in the other Environmental Assessment Areas) Photographs of protected building materials IAQ Management Plan Basis of Design (BOD) documents Commissioning Plan Commissioning reports (including field testing results) Operations and maintenance manual (including all plans, protocols, strategies and contracts)
| Section 2 - Site |
| Site civil plans and existing site civil plans |
Site plans that show the building, parking, street access, etc. and civil engineering plans that show topography, drainage and infrastructure Documentation by EPA, municipal, or other governmental authority of Superfund or brownfield site Construction Documents* Manufacturer’s specifications, zoning maps, cut sheets and performance documentation Pre-construction site documentation Landscaping plans (incluuding tree preservation plan) Floodplain map Photo documentation Manufacturer’s specifications and/or interior design plans that show interrupted spaces Erosion and Sediment Control plan Shade site plan Roofing plans Percolation test results Area rainfall charts Storm water discharge plan Exterior lighting plans Electrical engineer’s site lighting plan with illumination map Zoning ordinance requirements
| Section 3 - Energy |
| Energy design, modeling and simulation program’s input and results. |
Construction documents.* Manufacturer’s specifications, cut sheets, and performance documentation.
Power demand factor calculations. (Applicable for ANSI only) Energy metering reporting plan.
Measurement and verification program details.
Energy certification or label.
References to specifications and drawings of sub-metering equipment.
Cut sheets for meters and meter reading equipment.
Description of the monthly monitoring and verification reports that will be sent to building management.
Landscaping plans.
Site plans.
Effective aperture for vertical fenestration calculations.
Equipment specifications, control schedules and diagrams.
Results of leak-testing.
Drawings and specifications of vertical transport equipment.
On-site renewable energy generation documentation.
Copy of the off-site renewable energy contract.
| Section 4 - Water |
| Construction documents.* |
Manufacturer’s specifications, cut sheets, and performance documentation for all plumbing fixtures, fittings and appliances.
Manufacturer’s specifications, cut sheets and performance documentation for cooling equipment, makeup meter, blowdown meter, drift eliminators, conductivity controllers and wet/dry cooling towers.
Plumbing plans.
Manufacturer’s specifications, cut sheets, and performance documentation for pre-rinse spray valves, ice machines, food steamers, dishwashers and combination ovens.
Manufacturer’s specifications, cut sheets, and performance documentation for steam sterilizers, laboratory or medical equipment using non-potable water for once through cooling, water recycling units, and wet scrubbers.
Description of alternate sources of water to be used.
Manufacturer’s specifications, cut sheets and performance documentation for clothes washers.
Manufacturer’s specifications, cut sheets, and performance documentation for all special water features. Irrigation system equipment and fittings, and for all meters.
Manufacturer’s specifications, cut sheets and performance documentation for filtration systems, pressure drop gauges, reverse osmosis systems, water softeners, and recharge controls.
Description of alternate source of water and implementation for non-potable water applications.
Manufacturer’s specifications, cut sheets and performance documentation for the Meter Data Management System and meters.
| Section 5 - Materials and Resources |
| Construction documents.* |
Input and results from the Green Globes LCA Eco-Calculator for Building Assemblies.
Input and results from any BEES or Athena Impact Estimator or other LCA instrument.
Manufacturer’s specifications, cut sheets and performance documentation.
List of recycled content materials and percentage calculations.
List of bio-based materials and percentage calculations.
List of harvested, reclaimed, salvaged or extracted materials and transportation distance calculations.
List of processed or manufactured materials and transportation distance calculations.
List of salvaged materials.
Wood-based products certification documentation.
Calculation for percentage of façade retained.
Calculation for the percentage of existing major structural systems re-used.
Calculations for area of existing non-structural elements re-used.
Waste minimization plan. (Applicable for ANSI only) Landscaping and Site Development Plans showing incorporation of existing on-site materials.
Tipping records.
Letters and building models from architects or design professional.
Formal Building Service Life Plan. (Applicable for ANSI only) Field testing reports Manufacturer’s laboratory test results.
Plan for foundation systems, flashings, roof and wall openings, roofing, and cladding systems.
Construction plans.
| Section 6 - Emissions, Effluents, and Pollution Reduction |
| Construction documents.* |
Manufacturer’s specifications, cut sheets, and performance documentation for boilers and furnaces.
Manufacturer’s specifications, cut sheets, and performance documentation for cooling equipment, leak detection equipment and alarms.
Manufacturer’s specifications, cut sheets, and performance documentation.
| Section 7 - Indoor Environment |
| Construction documents* and specifications. |
Ventilation schedules.
Manufacturing specifications for ventilation systems, CO₂ sensing and ventilation control equipment.
Ventilation air quantity design data.
Local ventilation codes or standards.
Manufacturer’s specifications, cut sheets, and performance documentation for HVAC systems, humidification/dehumidification systems, CO₂ monitoring devices, wet cooling towers and domestic hot water systems list of mold resistant materials.
Documentation demonstrating compliance with ASHRAE 62.1-07: section 5.14, “HVAC Duct Construction Standards: Metal and Flexible,” and ICC’s “International Building Code®.(Applicable for ANSI only) Materials Safety Data Sheets or proof of certification for low-VOC products or materials.
Description of radon assessment.
Description of pest management strategies.
Manufacturer’s specifications, cut sheets, and performance documentation.
Percentages and calculations for occupied areas with daylight illumination levels.
Percentages and calculations for views to building exterior or atria.
Percentages and calculations for primary occupied spaces with IESNA recommended task lighting levels.
Specifications for solar shading devices and luminaries.
Lighting plans.
Documentation demonstrating compliance with ANSI/ASHRAE Standard 55-04.
Sound level measurements taken at the property line.
Description of acoustic design strategies and all design targets.
FIIC value for flooring assemblies.
Acoustic mitigation measures for mechanical equipment and plumbing systems.
Specification that includes Annex E of ANSI S12.60 – 2006. (Applicable for ANSI only) Test report indicating compliance with ANSI S12.60 – 2006. (Applicable for ANSI only)
*Construction documents are defined as all of the written and graphic documents prepared or assembled by the architect/engineer for communicating the design and administering the project. The term “Construction Documents” also includes the Project Manual that contains the bidding forms and instructions, contract forms and conditions, and specifications as well as documentation of all modifications made after the construction agreements are signed.
Any initiatives taken by Green Globes NC program participants should be, first and foremost, in full and legal compliance with applicable municipal, state, and federal regulations. Legal requirements may prohibit the implementation of suggested initiatives in specific circumstances.
| For more information, please contact GBI at (503) 274-0448 or info@thegbi.org. We look forward to working with you! | |
| 55-69% required | |
| 594.5 | |
| 59% |
&G &"Calibri,Bold"&16Green Globes for New Construction (NC) &"-,Bold"Pre-Assessment Checklist and Tracking Tool &G
Project Management
| Date: | 4/19/19 | A=Architect | Yes |
| Project: | Dixie NF Supervisor's and Cedar City Ranger District Office | AE=Architectural Engineer | No |
| CE=Civil Engineer | N/A |
Either use the + or - buttons to the left or the numbers above them to expand or collapse sections within the tab.
| CRITERIA # | AREA / CRITERIA QUESTION | TOOL TIP / REFERENCE INFORMATION | MAX POINTS | RESPONSE | PERSON ASSIGNED TO? | DUE DATE | FILE NAME(S) | FILE PATH, NAME, DIRECTORY | NOTES | Professional Likely to Answer Question | |
| 3.1 | PROJECT MANAGEMENT | 35.5 | |||||||||
| 3.1.1 | Integrated Design Process (IDP) | 9.0 | A | ||||||||
| 3.1.1.1 | Pre-Design Meetings | 3.0 | A | ||||||||
| 3.1.1.1.1 | Was an integrated design process (IDP) employed, which included a minimum of five of the key design disciplines involved in the project? (Check as many key disciplines below as apply.) | Individuals representing key design disciplines should attend a pre-design planning session in the form of a meeting, charrette, or workshop during pre-design of the project. | 3.0 | (Select from drop down list) | Shelley Hill-Worthen | A | |||||
| 3.1.1.1.1.1 | • Architect? | Yes | A | ||||||||
| 3.1.1.1.1.2 | • Building Science or Building Forensics Expert? | No | A | ||||||||
| 3.1.1.1.1.3 | • Civil Engineer? | Yes | A | ||||||||
| 3.1.1.1.1.4 | • Commissioning Agent? | No | A | ||||||||
| 3.1.1.1.1.5 | • Community Representative(s)? | No | A | ||||||||
| 3.1.1.1.1.6 | • Contractor? | No | A | ||||||||
| 3.1.1.1.1.7 | • Electrical Engineer? | Yes | A | ||||||||
| 3.1.1.1.1.8 | • Energy Engineer? | No | A | ||||||||
| 3.1.1.1.1.9 | • Facilities Manager? | Yes | A | ||||||||
| 3.1.1.1.1.10 | • Interior Designer? | No | A | ||||||||
| 3.1.1.1.1.11 | • Landscape Architect? | Yes | A | ||||||||
| 3.1.1.1.1.12 | • Lighting Designer/Illuminating Engineer? | Yes | A | ||||||||
| 3.1.1.1.1.13 | • Mechanical Engineer - HVAC? | Yes | A | ||||||||
| 3.1.1.1.1.14 | • Mechanical Engineer - Plumbing? | Yes | A | ||||||||
| 3.1.1.1.1.15 | • Owner’s representative? | Yes | A | ||||||||
| 3.1.1.1.1.16 | • Structural Engineer? | Yes | A | ||||||||
| 3.1.1.1.1.17 | • Sustainable Design Coordinator? | No | A | ||||||||
| 3.1.1.1.1.18 | • User Group Representative? | Yes | A | ||||||||
| 3.1.1.1.1.19 | • Acoustical Consultant or Acoustician? | No | |||||||||
| 3.1.1.1.1.20 | • Other Key Professional? | No | |||||||||
| 3.1.1.2 | IDP Performance Goals | 3.0 | GC | ||||||||
| 3.1.1.2.1 | Were (qualitative) green design goals established at the pre-design phase for the following: | Written performance goals should be established for one or more of the items listed. | 1.0 | Shelley Hill-Worthen | GC | ||||||
| 3.1.1.2.1.1 | • Site design? | Yes | GC | ||||||||
| 3.1.1.2.1.2 | • Envelope? | Yes | GC | ||||||||
| 3.1.1.2.1.3 | • Material efficiency? | No | GC | ||||||||
| 3.1.1.2.1.4 | • Indoor environment? | Yes | GC | ||||||||
| 3.1.1.2.2 | Were performance goals (metrics) established at the pre-design phase for the following: | Written performance goals should be established for one or more of the items listed. | 2.0 | Shelley Hill-Worthen | GC | ||||||
| 3.1.1.2.2.1 | • Energy efficiency? | Yes | GC | ||||||||
| 3.1.1.2.2.2 | • Renewable energy (percentage of total energy)? | No | GC | ||||||||
| 3.1.1.2.2.3 | • Greenhouse gas emissions? | Yes | GC | ||||||||
| 3.1.1.2.2.4 | • Water conservation, efficiency, and reuse? | Yes | GC | ||||||||
| 3.1.1.2.2.5 | • Life cycle impact? | Yes | GC | ||||||||
| 3.1.1.2.2.6 | • Construction waste diversion? | Yes | GC | ||||||||
| 3.1.1.3 | IDP Progress Meetings for Design | 3.0 | GC | ||||||||
| 3.1.1.3.1 | Did the integrated design and delivery team hold progress meetings prior to the completion of the following project phases: | Agenda items should include the following: Review established (and/or modified) performance goals; Refine language regarding performance goals outcomes into Plans and Specifications; Identify any missing requirements and required steps to correct; Establish/track responsibilities for gathering documentation; and Review Operations and Maintenance training. | 1.5 | Shelley Hill-Worthen | GC | ||||||
| 3.1.1.3.1.1 | • At the Concept Design Phase? | At the Concept Design Phase, the general scope, preliminary design, scale, and relationships among the components of the project are established along with budget and schedule. | 0.5 | Yes | GC | ||||||
| 3.1.1.3.1.2 | • At the Design Development Phase? | At the Design Development Phase, enlarged scale drawings, detailed elevations and plans, and design mock-ups should show major elements including mechanical, electrical, structural, telecommunications, plumbing systems, and fire protection. | 0.5 | Yes | GC | ||||||
| 3.1.1.3.1.3 | • At the Construction Documents Phase? | At the Construction Documents Phase, finalized drawings and specifications for all components and systems of the building are produced that form the basis for drawing up contracts, obtaining necessary permits, and constructing the project. | 0.5 | Yes | GC | ||||||
| 3.1.1.3.2 | Is there a requirement that the integrated design and delivery team hold progress meetings prior to the completion of the following project milestones: | This is verified at the Stage II Site Assessment. | 1.5 | Shelley Hill-Worthen | GC | ||||||
| 3.1.1.3.2.1 | • Pre-Construction? | Yes | GC | ||||||||
| 3.1.1.3.2.2 | • 25% Completion of budget or schedule? | No | GC | ||||||||
| 3.1.1.3.2.3 | • 50% Completion of budget or schedule? | Yes | GC | ||||||||
| 3.1.1.3.2.4 | • Substantial Completion? | Yes | GC | ||||||||
| 3.1.1.4 | Capital Asset Plan & Business Case Summary | 0.0 | GC | ||||||||
| 3.1.1.4.1 | For Federal building projects, did the integrated design process integrate the use of OMB's A-11, Section 7, Exhibit 300: Capital Asset Plan and Business Case Summary? | Mark “not applicable” for non-Federal building projects. | 0.0 | Yes | Shelley Hill-Worthen | GC | |||||
| 3.1.2 | Environmental Management During Construction | 4.5 | GC | ||||||||
| 3.1.2.1 | Environmental Management Systems (EMS) | 0.0 | GC | ||||||||
| 3.1.2.1.1 | Is there a requirement that the General Contractor must document the following elements as part of their Environmental Management System (EMS): | This is verified at the Stage II Site Assessment. An EMS is a framework that helps the General Contractor to achieve their corporate environmental goals through consistent control of their operations. Part of the EMS is an Environmental Management Plan (EMP) which deals specifically with this project. | GC | ||||||||
| 3.1.2.1.1.1 | • General Contractor's Environmental Policy? | This is a statement by the General Contractor’s organization that outlines intentions and principles regarding its overall environmental performance. It provides the overall directive and basis to set environmental objectives and targets, and develop action plans. It must be communicated to all employees and sub-contractors and displayed on notice boards throughout the construction sites. It should also be available to the public. | No | GC | |||||||
| 3.1.2.1.1.2 | • Regulatory Compliance and Training? | The Contractor should keep copies of regulatory requirements as well as records showing that training has been provided for relevant regulatory requirements. | No | GC | |||||||
| 3.1.2.1.1.3 | • Environmental Risk Assessment that shows sensitive environmental areas and ranks potential risks that may arise from the construction? | There should be documentation that identifies sensitive environmental areas; and possible risks on the environment and adjacent land from construction in terms of: air, natural waterways, topography, vegetation, noise and pollution. Ranking is a function of probability and severity of impact. | No | GC | |||||||
| 3.1.2.1.1.4 | • Environmental Risk Management Strategies? | Risk management options should be selected in order of preference in terms of avoiding risk wherever possible; and where this is not possible reducing risk; or, as a last resort, controlling risk. Major control structures should be shown (e.g. erosion control, site run-off measures, spill response, tree protection). Installation of control structures should occur before other construction activities commence. | No | GC | |||||||
| 3.1.2.1.1.5 | • Environmental Management Roles, Responsibilities and Reporting Structure for the construction phase? | Outline the Reporting Structure for Environmental Management at the Construction Phase. List the roles of the: i) Client’s Project Environmental Manager, ii) the Contractor’s Project Environmental Manager, iii) the Contractors Site Environmental Representative, and iv) the Site Foreman. | No | GC | |||||||
| 3.1.2.1.1.6 | • Site and Work Instructions for site personnel outlining environmental procedures during construction? | These should describe, in general terms, the required site best practices, and provide detailed instructions to deal with environmental incidents, adverse weather conditions and complaints. The Site Instructions should relate to the Environmental Inspection Checklists. | No | GC | |||||||
| 3.1.2.1.1.7 | • Environmental Inspection Checklists? | These serve to establish compliance with the documented procedures contained in the Site and Work Instruction, identify departure from procedures, and record corrective steps that are being taken. | No | GC | |||||||
| 3.1.2.1.1.8 | • Records of Compliance? | These records show that inspections have taken place and that corrective measures have occurred as necessary. They provide a record of site conditions and activities and provide a mechanism by which the Contractor can establish the effectiveness of its Environmental Management Plan. | No | GC | |||||||
| 3.1.2.2 | Clean Diesel Practices | 0.5 | GC | ||||||||
| 3.1.2.2.1 | Is there a requirement that the General Contractor must supplement mandatory regulatory requirements by implementing one or more of the following “clean diesel” strategies: | This is verified at the Stage II Site Assessment. Clean Diesel strategies should be included the General Contractors' Environmental Management System as part of the Site and Work Instructions. | 0.5 | GC | |||||||
| 3.1.2.2.1.1 | • A vehicle “idling-reduction” directive? | Limit idling to no more than 3 minutes. | 0.5 | Yes | Shelley Hill-Worthen | GC | |||||
| 3.1.2.2.1.2 | • Use of clean fuels? | For example, ultra-low sulfur diesel (ULSD) fuel, biodiesel blends, liquid petroleum gas (LPG), compressed natural gas (CNG), and liquefied natural gas (LNG). | 0.0 | No | GC | ||||||
| 3.1.2.2.1.3 | • Engine upgrades that reduce emissions? | For example, diesel particulate filters (DPFs) diesel oxidation catalysts (DOCs), crankcase emission control devices, engine component upgrades. Where engines are equipped with after-treatment technologies as part of their originally certified emission control system, mark “not applicable”. | 0.0 | No | GC | ||||||
| 3.1.2.2.1.4 | • Engine maintenance records? | Proper engine maintenance is necessary for optimum fuel economy and extended engine life as well as to control emissions. Keeping records ensures tracking and scheduling as recommended by the manufacturer – important also for warranty and retrofit purposes. | 0.0 | No | GC | ||||||
| 3.1.2.3 | Building Materials and Building Envelope | 2.0 | GC | ||||||||
| 3.1.2.3.1 | Is there a requirement for the following construction best-practices to protect building materials and control mold: | This is verified at the Stage II Site Assessment. The measures should be included in the General Contractors' Environmental Management System as part of the Site and Work Instructions. | 2.0 | Shelley Hill-Worthen | GC | ||||||
| 3.1.2.3.1.1 | • Building materials made of organic material or those that could absorb moisture are protected in transit and at the construction site from contact with moisture and from collecting organic matter such as leaves, soil or insects? | For example, wood or plasterboard. | 1.0 | Yes | GC | ||||||
| 3.1.2.3.1.2 | • The building envelope will be weather-tight and permitted to dry before installation of interior walls, wood floors, ceilings or HVAC systems? | “Building envelope” means the elements of a building that separate the interior spaces from the outside, such as walls, roofs, floors, doors, and fenestration. This is verified at the Stage II Site Assessment. The measures should be included in the General Contractors' Environmental Management System as part of the Site and Work Instructions. | 1.0 | Yes | GC | Building flushed 14 days + filters changed | |||||
| 3.1.2.4 | IAQ during Construction | 2.0 | GC | IAQ test yields acceptable results | |||||||
| 3.1.2.4.1 | Is there a requirement for either one of the following best-practices to maintain good indoor air quality? |
The area under construction is to be flushed with 100% outdoor air for 14 consecutive days prior to occupancy and filters changed before it is occupied?
or
| Baseline Indoor Air Quality testing gives positive results as per EPA “Testing for Indoor Air Quality,” Section 01 81 09, (December 2007)? | This is verified at the Stage II Site Assessment. The measures should be included in the General Contractors' Environmental Management System as part of the Site and Work Instructions. | 2.0 | IAQ test yields acceptable results | Shelley Hill-Worthen | Section 018109 | GC | No |
| 3.1.2.4.2 | Where parts of the building will be occupied during construction, are one or more of the following five basic strategies specified per SMACNA‘S “IAQ Guidelines for Occupied Buildings Under Construction” to control dust, odors or irritants: | This is verified at the Stage II Site Assessment. The measures should be included in the General Contractors' Environmental Management System as part of the Site and Work Instructions. Mark “not applicable” where the building will not be occupied during construction. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | 0.0 | GC | ||
| 3.1.2.4.2.1 | • HVAC protection? | Mark “not applicable” where the building is entirely unoccupied during construction. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | N/A | GC | ||
| 3.1.2.4.2.2 | • Source Control? | Mark “not applicable” where the building is entirely unoccupied during construction or where the source of pollution is far away from occupied spaces. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | N/A | GC | ||
| 3.1.2.4.2.3 | • Pathway Interruption? | Mark “not applicable” where the building is entirely unoccupied during construction. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | N/A | GC | ||
| 3.1.2.4.2.4 | • Housekeeping? | Mark “not applicable” where the building is entirely unoccupied during construction. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | N/A | GC | ||
| 3.1.2.4.2.5 | • Scheduling? | Mark “not applicable” where the building is entirely unoccupied during construction. |
Reference material:
| • SMACNA IAQ Guidelines for Occupied Buildings Under Construction | N/A | GC | |||||||
| 3.1.3 | Commissioning | 22.0 | GC | ||||||
| 3.1.3.1 | Pre-Commissioning | 3.0 | GC | ||||||
| 3.1.3.1.1 | Is there a requirement for the Commissioning Agent to document the “Owner’s Project Requirements” for building systems as per ASHRAE Guideline 0-2005: The Commissioning Process: Annexes I and J? | This is verified at the Stage II Site Assessment. The format should include: Objectives, Functional Uses, Occupancy Requirements, Budget Considerations and Limitations, Performance. | 1.0 | Yes | Dixie.OPR.12.7.2018 | GC | |||
| 3.1.3.1.2 | Is there a requirement to document the building’s “Basis of Design” for building systems as per ASHRAE Guideline 0-2005 Annex K? | This is verified at the Stage II Site Assessment. The Basis of Design document records the major thought processes and assumptions behind design decisions made to meet the Owner’s Project Requirements. | 1.0 | Yes | Dixie.BOD.12.8.2018 | GC | |||
| 3.1.3.1.3 | Is there requirement for a Commissioning Authority with technical credentials as per ASHRAE Guideline 0-2005: The Commissioning Process, who reports directly to the owner, who will lead the commissioning team and coordinate the commissioning process? | This is verified at the Stage II Site Assessment. | 1.0 | Yes | Troy Smalley/ CaX | FS Cedar City Office Cx Plan 2018-12-11.pdf | GC | ||
| 3.1.3.2 | Whole Building Commissioning | 12.0 | GC | ||||||
| 3.1.3.2.1 | Is there a requirement that commissioning will be conducted in accordance with ASHRAE Guideline 0-2005: The Commissioning Process “The Commissioning Process: Article 5, 6 and 7” for the following: | This is verified at the Stage II Site Assessment. Where no commissioning is to be done, mark “no.” | 10.0 | Troy Smalley/ CaX | FS Cedar City Office Cx Plan 2018-12-11.pdf | GC | |||
| 3.1.3.2.1.1 | • HVAC&R systems and their controls? | 4.0 | Yes | GC | |||||
| 3.1.3.2.1.2 | • Building envelope? | The building envelope includes roofing assemblies, waterproofing assemblies, fenestrations and doors and cladding/skin. | 0.0 | No | GC | ||||
| 3.1.3.2.1.3 | • Structural systems? | 0.0 | No | GC | |||||
| 3.1.3.2.1.4 | • Fire protection system? | 2.0 | Yes | GC | |||||
| 3.1.3.2.1.5 | • Plumbing system? | This involves spot check and verification that the flows are accurate for the different fittings, fixtures, and appliances. | 1.0 | Yes | GC | ||||
| 3.1.3.2.1.6 | • Electrical systems? | 1.0 | Yes | GC | |||||
| 3.1.3.2.1.7 | • Lighting system and their controls? | 1.0 | Yes | GC | |||||
| 3.1.3.2.1.8 | • Building automation systems? | Mark “not applicable” where building automation systems are not within the scope of the project. | 0.0 | N/A | GC | ||||
| 3.1.3.2.1.9 | • Elevating and conveying systems? | Mark “not applicable” where there are no elevating systems. | 0.0 | N/A | GC | ||||
| 3.1.3.2.1.10 | • Communication systems? | Mark “not applicable” where communications systems are not within the scope of the project. | 1.0 | Yes | GC | ||||
| 3.1.3.2.2 | Is there a requirement to field-test partitions for noise isolation ? | Conduct field testing of partitions for noise isolation according to ASTM E336-07, determined by ASTM E413-04, and rated for not less than two thirds STC value indicated. | 1.0 | No | GC | ||||
| 3.1.3.2.3 | Is there a requirement that the building system commissioning will be conducted in accordance with ASHRAE Guideline 0-2005: The Commissioning Process: The Commissioning Process: Annex L? | This annex provides guidance on writing specifications for the commissioning activities that are to be performed by construction contractors. A specification guide is included with the assumption that the construction contractor is involved only during the construction phase and for the correction and warranty period. This is verified at the Stage II Site Assessment. Where no commissioning is to be done, mark “no.” | 1.0 | Yes | Troy Smalley/ CaX | GC | |||
| 3.1.3.3 | Training | 1.0 | GC | ||||||
| 3.1.3.3.1 | Is there a requirement that there will be training for the building operators on the systems listed above in accordance with ASHRAE Guideline 0-2005: The Commissioning Process: Article 7.2.14? | 1.0 | Yes | Troy Smalley/ CaX | FS Cedar City Office Cx Plan 2018-12-11.pdf | GC | |||
| 3.1.3.4 | Operations and Maintenance Manual | 6.0 | GC | ||||||
| 3.1.3.4.1 | Is there a requirement to develop an Operations and Maintenance (O&M) Manual and/or CMMS that contains descriptions and information on the continuous tasks related to the systems and to each piece of equipment, which are necessary to operate the building efficiently? | This is verified at the Stage II Site Assessment. A “CMMS” is defined as a computerized maintenance management system. Review the Green Globes for New Construction Technical Reference Manual, Section 3.1.3.4, for a full list of what must be included within an O&M Manual and/or CMMS. | 6.0 | There is/will be a complete, user-friendly O&M manual | Troy Smalley/ CaX | FS Cedar City Office Cx Plan 2018-12-11.pdf | GC | There is/will be a complete, user-friendly O&M manual | |
| O&M Manual meets some, but not all requirements | |||||||||
| There is/will be a complete CMMS | |||||||||
| CMMS meets some, but not all requirements | |||||||||
| No |
Site
| Date: | 4/9/19 | A=Architect | Yes |
| Project: | Dixie NF Supervisor's and Cedar City Ranger District Office | AE=Architectural Engineer | No |
| CE=Civil Engineer | N/A |
Either use the + or - buttons to the left or the numbers above them to expand or collapse sections within the tab.
| CRITERIA # | AREA / CRITERIA QUESTION | TOOL TIP / REFERENCE INFORMATION | MAX POINTS | RESPONSE | PERSON ASSIGNED TO? | DUE DATE | FILE NAME(S) | FILE PATH, NAME, DIRECTORY | NOTES | Professional Likely to Answer Question |
| 3.2 | SITE | 87.0 | ||||||||
| 3.2.1 | Development Area | 30.0 | CE | |||||||
| 3.2.1.1 | Urban Infill and Urban Sprawl | 10.0 | CE | |||||||
| 3.2.1.1.1 | Is the project located within 0.5 mile (0.8 km) of a commercial zone? | 5.0 | Yes | CE | ||||||
| 3.2.1.1.2 | Is the building being constructed on a previously developed site, served with existing utilities for at least a full year before construction? | Site must have been served by utilities (electric power, water, and sewer) for at least a full year before construction began. | 5.0 | Yes | CE | |||||
| 3.2.1.2 | Greenfields, Brownfields and Floodplains | 20.0 | CE | |||||||
| 3.2.1.2.1 | Is the building being constructed on a remediated brownfield or remediated Superfund site? | A brownfield site is an abandoned, idle or underutilized commercial or industrial property where past actions have caused known or suspected environmental contamination, but where there is an active potential for redevelopment. | 10.0 | Yes | CE | |||||
| 3.2.1.2.2 | Does the project location avoid sensitive sites i.e. land that was farmland, a public park, a wooded area, prairie, wetland, wildlife corridor or recreational area for at least 3 years prior to time of purchase or from the beginning of the project? | Ensure that any necessary Environmental Assessments have been carried out. | 6.0 | Yes | CE | |||||
| 3.2.1.2.3 | Is all habitable space located higher than the 100-year flood plain? | A “100-year floodplain” is the geographic extent of the flooded area expected to be equaled or exceeded every 100 years on average, as identified on a flood-risk map approved by municipal, provincial or federal government or land use plan, interim control by-law or municipal planning by-law. Where there is inconsistency between maps, the most recent map or the most recent flood elevation (whichever is greater) should be used to delineate the extent of the floodplain. Any construction at a level below the 100 year floodplain must be compliant with FEMA Technical Bulletin 2/2008. |
Reference Material:
| • Green Globes for New Construction Technical Reference Manual, Figures 3.2.1.2.3-A, 3.2.1.2.3-B, and 3.2.1.2.3-C | 4.0 | Yes | Confirmed with Tim Watson | CE | |||
| 3.2.2 | Ecological Impacts | 13.0 | CE | ||||
| 3.2.2.1 | Site Disturbance and Erosion | 8.0 | CE | Path A | |||
| Green Globes provides two paths for assessing site disturbance and erosion: |
Path A: Erosion and Sedimentation Control Plan - 5 points
Path B: Erosion and Sedimentation Control Specifications - 5 points
| Points cannot be combined between paths. Please review and select one of the two pathways below. | 5.0 | Path B | Shelley Hill-Worthen | Section 023701. Sedimentation and Erosion Control | CE | Path B | |||||
| 3.2.2.1.1 | Path A: Erosion and Sedimentation Control Plan | 5 points | 0.0 | No | CE | None | |||||
| 3.2.2.1.1.1 | Is there an Erosion and Sedimentation Control Plan, signed and stamped by a Professional Engineer? | This will undergo final verification during the Stage II Site Assessment. The Erosion and Sedimentation Control Plan should meet or exceed all requirements outlined by the U.S EPA's “Sediment and Erosion Control: An Inventory of Current Practices, National Pollutant Discharge Elimination System (NPDES) Permit Program,” and was fully implemented by the general contractor. | No | CE | |||||||
| 3.2.2.1.2 | Path B: Erosion and Sedimentation Control Specifications | 5 points | 5.0 | Yes | CE | ||||||
| 3.2.2.1.2.1 | In the absence of an Erosion and Sedimentation Control Plan by a Professional Engineer, do the specifications require that the General Contractor will implement the following best practices for erosion and sediment control during construction: | This will undergo final verification during the Stage II Site Assessment. Mark “no” where there is an Erosion and Sedimentation Control Plan signed and stamped by a Professional Engineer. | Shelley Hill-Worthen | Section 023701. Sedimentation and Erosion Control | CE | ||||||
| 3.2.2.1.2.1.1 | • Silt fences will be installed or fiber socks filled with compost/wood chips around the construction site and maintained throughout construction? | 1.0 | Yes | CE | |||||||
| 3.2.2.1.2.1.2 | • Gravel pads will be placed at all site entries and cleaned throughout construction? | 1.0 | Yes | CE | |||||||
| 3.2.2.1.2.1.3 | • Riprap will be placed around all storm sewer outlets and silt and debris removed after each 24-hour rainfall of 0.2 in. (5.08 mm) or more? | 1.0 | Yes | CE | |||||||
| 3.2.2.1.2.1.4 | • Disturbed soils will be corrected using erosion control mats, or mulched and seeded within 90 days of being disturbed? | 1.0 | Yes | CE | |||||||
| 3.2.2.1.2.1.5 | • During dry days, dust will be controlled by wetting the soil each day for 15 to 30 minutes before construction activities begin, and again after construction activities are done for the day? | 1.0 | Yes | CE | |||||||
| Answer the following question regardless of the Path chosen above. | GC | ||||||||||
| 3.2.2.1.3 | Is there a requirement that construction activities will be located in such a way to limit disturbance to the site? | Construction activity should not extend beyond 40 ft. (12.2 m) of the building footprint; and not beyond 5 ft. (1.5 m) of parking lots, roadways, sidewalks and utility right-of-ways. Exceptions apply where the intent of the construction activities is to specifically improve the natural integrity of the site e.g.: removing invasive plant species, replacing existing hardscapes with vegetation, restoring prairie or wetlands, or increasing on-site water retention by building rain gardens, swales, retention ponds, or berms. | 3.0 | Yes | Noted in Specs | GC | |||||
| 3.2.2.2 | Tree Integration | 2.0 | LA | ||||||||
| 3.2.2.2.1 | Are the following integrated into the landscape plan: | Trees and undergrowth integrated into the landscape plan must be existing on site, or adapted or native to the ecosystem. This will undergo final verification during the Stage II Site Assessment. | Ryan Budge | LA | |||||||
| 3.2.2.2.1.1 | • Large trees? | Mark “not applicable” where there are no large trees existing, adaptive, or native to the ecosystem. “Large tree” means a diameter greater than 12 in. (30 cm) as measured at 5 ft. (1.4 m) above the ground or as per municipal regulations, whichever is more stringent. | 2.0 | Yes | LA | ||||||
| 3.2.2.2.1.2 | • Clusters of trees? | Mark “not applicable” where there are no clusters of trees existing on site, or adaptive or native to the ecosystem. | 0.0 | N/A | LA | ||||||
| 3.2.2.2.1.3 | • Undergrowth? | Mark “not applicable” where is no undergrowth existing on site, or adaptive or native to the ecosystem. | 0.0 | N/A | LA | ||||||
| 3.2.2.3 | Tree Preservation | 0.0 | LA | ||||||||
| Green Globes provides two paths for assessing tree preservation: |
Path A: Tree Preservation Plan - 4 points
Path B: Tree Protection Specifications - 4 points
| Points cannot be combined between paths. Please review and select one of the two pathways below. | 0.0 | None | LA | |||||||||
| 3.2.2.3.1 | Path A: Tree Preservation Plan | 4 points | 0.0 | No | LA | |||||||
| 3.2.2.3.1.1 | Is there a Tree Preservation Plan by a certified Arborist? | Mark “not applicable” where there are no trees on the site. | No | LA | ||||||||
| 3.2.2.3.2 | Path B: Tree Protection Specifications | 4 points | 0.0 | No | LA | |||||||
| 3.2.2.3.2.1 | In the absence of Tree Preservation Plan by a certified Arborist, do the specifications require that the General Contractor will implement the following best practices for tree protection during construction: | This will undergo final verification during the Stage II Site Assessment. Mark “not applicable” for the following responses where there are no trees on the property. Mark “no” where there is a Tree Preservation Plan by a certified Arborist. | LA | |||||||||
| 3.2.2.3.2.1.1 | • Tree protection barriers will enclose a minimum Tree Protection Zone (TPZ) around the trees and shrubs that are to be retained on the site? | The fences must enclose an area equal to or greater than the minimum required Tree Protection Zone (TPZ) determined by the diameter of the tree or according to relevant municipally-defined tree protection zone, whichever is more stringent. Diameter of the tree is measured at 5 ft. (1.4 m) above the ground. Mark “not applicable” where there are no trees on the property. | 0.0 | No | LA | |||||||
| 3.2.2.3.2.1.2 | • Root protection will be installed to protect tree roots from compaction during construction? | Root protection should consist of a combination of filter fabric, clear crushed stone (half to three quarter inch diameter) placed in a layer 6 in. (15 cm) deep, and steel plating or other material. Mark “not applicable” where there are no trees on the property. | 0.0 | No | LA | |||||||
| 3.2.2.3.2.1.3 | • Sediment control barriers will be provided where some fill or excavate will be temporarily located near a TPZ? | Mark “not applicable” where there are no trees on the property. | 0.0 | No | LA | |||||||
| 3.2.2.4 | Heat Island Effect | 2.0 | CE, A | > 70% | <49% | >49% | ||||||
| 3.2.2.4.1 | What percentage (by area) of the roof is vegetated, and/or has a high Solar Reflectance Index (SRI) as prescribed based on the slope of the roof? | Calculate the percentage of roof area that will be vegetated, have a high SRI or a combination thereof. For a low slope roof, the SRI should be at least 78. For a steep slope roof, the SRI should be at least 29. “Low sloped” roof means a surface slope less than 3 in/ft. (7.6 cm/m) and “steep sloped” roofs means a surface slope greater than or equal to 3 in/ft. (7.6 cm/m) (9.5 - 22.6 degrees). Vegetated roofing must comply with ASTME E2400-06. Review the Green Globes for New Construction Technical Reference Manual (Definitions) for climate zone definitions. Mark “not applicable” for climate zones 6, 7 and 8. | 0.0 | < 40% | Shelley Hill-Worthen | Have a study that says concrete tile system is as effective as high SRI. Will they accept this? | A | 56 - 70% | 25 - 49% | 25 - 49% | ||
| 3.2.2.4.2 | What percentage (by area) of paved surfaces have a high SRI? | “High SRI” means at least 25. Paved surfaces include parking lots, sidewalks, and driveways outside of the building footprint. Mark “not applicable” where more than 70% of the site is unpaved. Mark “not applicable” for climate zones 6, 7 and 8. | 0.0 | < 25% | CE | 40 - 55% | < 25% | < 25% | ||||
| 3.2.2.4.3 | What percentage (by area) of paved surfaces outside of the building footprint will be shaded by trees within 15 years? | Mark “not applicable” where more than 70% of the site is unpaved. Paved surfaces include parking lots, sidewalks, and driveways outside of the building footprint. | 0.0 | < 25% | Not Pursued | CE | < 40% | N/A (more than 70% of the site is paved) | N/A | |||
| 3.2.2.4.4 | Do at least 75% of opaque wall surfaces (by area) on the east and west have an SRI of 29 or greater? | Mark “not applicable” for climate zones 6, 7 and 8. | 2.0 | Yes | Shelley Hill-Worthen | Siding can be painted light color. Can use light colored stone. | CE | N/A | N/A (climate zone) | |||
| 3.2.2.5 | Bird Collisions | 1.0 | CE | |||||||||
| 3.2.2.5.1 | Are the following measures required to help ensure that birds perceive windows as being a solid object: | Birds crash into glass because it appears invisible. They may also be attracted to the reflections of the landscape (trees, sky, clouds, etc.) on the glass surface, greenery inside the building, or a landscape on the other side of the building as viewed through two windows on opposite facades. Two ways to help birds perceive windows as being solid are by providing visual markers or by avoidance of reflections. |
Reference Material:
| • Green Globes for New Construction Technical Reference Manual, Section 3.2.2.5.1 | 1.0 | CE | |||||
| 3.2.2.5.1.1 | • Visual markers? | Features or patterns that are no more than 11 in. (28 cm) apart, up to at least 39 ft. (12 meters) above grade. Examples are mullions, fritted glass, decorative grilles and louvers or artwork. | 0.0 | No | CE | ||
| 3.2.2.5.1.2 | • Avoidance of reflections? | Reflections can be avoided by internal screens, awnings, overhangs and sunshades or by angling the glass downward (minimum 20°). | 1.0 | Yes | Roller Shades AND INSECT SCREENS | CE | |
| 3.2.3 | Stormwater Management | 13.0 | CE | ||||
| 3.2.3.1 | Is there a Stormwater Management Report by a Civil Engineer that shows that: | Mark “not applicable” in the case of a renovation that does not change the building footprint. |
Reference Material:
• Green Globes for New Construction Technical Reference Manual, Section 3.2.3.1
| • Energy Independence and Security Act (EISA), Section 438 | 13 | CE | |||||
| 3.2.3.1.1 | • The project meets municipal and/or local watershed flood and erosion control targets (i.e. post to pre control)? | Storm water quantity control measures include Storm Water Management (SWM) bio-retention areas and ponds, permeable, porous paving, green roofs, and rain cisterns). Mark “not applicable” in the case of a renovation that does not change the building footprint. | 5.0 | Yes | CE | ||
| 3.2.3.1.2 | • The project meets municipal and/or local Watershed water quality control targets (80% TSS removal)? | Mark “not applicable” in the case of a renovation that does not change the building footprint. | 5.0 | Yes | CE | ||
| 3.2.3.1.3 | • The site will retain at least 50% of the total average annual rainfall volume as per a Site Water Balance Assessment, to be included in the Stormwater Management Report? | Onsite runoff retention includes the implementation of infiltration, evapo-transpiration, and rainwater reuse practices. Mark “not applicable” in the case of a renovation that does not change the building footprint. | 0.0 | No | CE | ||
| 3.2.3.2 | Is the site boundary farther than 100 ft. (30.5 m) from a natural body of water? | A “natural body of water” means an ocean, lake, river, stream, estuary, or wetland. Mark “not applicable” where the body of water is a retention pond or restored wetland, where there are natural or man-made features that receive all storm water run-off, and/or where site boundaries have permanent continuous earth or concert berms at least 16 in. (40.6 cm) higher than surrounding grade to prevent run-off. | 3.0 | Yes | CE | ||
| 3.2.4 | Landscaping | 24.0 | LA | ||||
| 3.2.4.1 | Is there a Landscape and Irrigation Plan developed by a Landscape Architect, certified horticulturalist, or certified irrigation professional? | Mark “not applicable” where there is no room for landscaping. |
Reference Material:
• WaterSense Irrigation Partners in Action
| • Green Globes for New Construction Technical Reference Manual, Section 3.2.4.1 | 6.0 | Yes | Ryan Budge | LA | ||||
| 3.2.4.2 | Does the Landscape and Irrigation Plan include the following: | 3.0 | LA | |||||
| 3.2.4.2.1 | • Soil type, drainage, and light conditions? | Mark “not applicable” where there is no room for landscaping. | 2.0 | Yes | Budge | LA | ||
| 3.2.4.2.2 | • Structural limitations (e.g. shading, utilities, overhangs, lights) that would impact the location and growth of plants? | Mark “not applicable” where there is no room for landscaping. | 1.0 | Yes | Budge | LA | ||
| 3.2.4.3 | Does the plant palette include the following: | As per WeedUS: Database of Plants Invading Natural Areas in the United States; state and local university or college landscape reference guide; and state or local agency landscaping reference guides. Mark “not applicable” where there is no room for landscaping. |
Reference Material:
| • Green Globes for New Construction Technical Reference Manual, Section 3.2.4.3 | 10.0 | LA | Yes, by > 75% | ||||||||
| 3.2.4.3.1 | • Minimum of 50% of the vegetated area covered with plants that are drought-tolerant? | At least 50% of the vegetated area should be covered with plants listed as being highly tolerant or moderately tolerant to drought. Mark “not applicable” where there is no room for landscaping. | 3.0 | Yes, by 50 - 74% | Budge | USU extension list has 50% of the species on the drawing | LA | Yes, by 50 - 74% | |||
| 3.2.4.3.2 | • Minimum of 50% of vegetated area covered with plants (new or salvaged plantings) that are native and non-invasive? | New or salvaged plants should be selected from a local or regional plant list such as from a university, water agency, or nursery growers association, and cover at least 50% of the vegetated area. Mark “not applicable” where there is no room for landscaping. | 4.0 | Yes, by 50 - 74% | Budge | miscanthus sinensis anderss versus miscanthus sinensis? | LA | No | |||
| 3.2.4.3.3 | • Minimal turf grass? | “Minimal turf grass” means that turf grass is limited to within 20 ft. (6.1 m) of buildings and does not extend beyond 5 ft. (1.5 m) from parking lots, driveways, walkways, rain gardens, swales, and retention ponds. Mark “not applicable” where there is no room for landscaping. | 3.0 | Yes | LA | N/A | |||||
| 3.2.4.4 | Is there a requirement that landscaped areas will be installed with the following: | Mark “not applicable” where all of the landscaping is a preserved naturalized area or where there is no room for landscaping. | 2.0 | LA | |||||||
| 3.2.4.4.1 | • At least 6 in. (15.2 cm) of soil; aerated, tilled and/or broken up? | Consult local government and/or agency and/or university landscape reference guides. Mark “not applicable” where all of the landscaping is a preserved naturalized area or where there is no room for landscaping. For more information, see Green Globes for New Construction Technical Reference Manual, Section 3.2.4.4. | 1.0 | Yes | Budge | LA | |||||
| 3.2.4.4.2 | • Organic mulch as per best practices? | Comply with any applicable local standards. “Best practices” means 3 - 4 in. (7.6 - 10.2 cm) deep around plants and trees, and 2 in (5.1 cm) clear “breathing room” around each plant in order not to rot the stem. Mark “not applicable” where all of the landscaping is a preserved naturalized area or where there is no room for landscaping. | 1.0 | Yes | Budge | LA | |||||
| 3.2.4.5 | Does the Landscape Design show that plants are located on the site as follows: | 3.0 | LA | ||||||||
| 3.2.4.5.1 | • Plants with similar water requirements are grouped together? | Mark “not applicable” where all of the landscaping is a preserved naturalized area or where there is no room for landscaping. | 2.0 | Yes | Budge | LA | |||||
| 3.2.4.5.2 | • Plants are spaced to allow for maturation at a 5-year growth rate? | Mark “not applicable” where all of the landscaping is a preserved naturalized area or where there is no room for landscaping. | 1.0 | (Select from drop down list) | Budge | LA |