REGION 4 UTAH ACQUISITION SUPPORT CENTER INSTRUCTIONAL COVER SHEET
Issuing Office: U.S. Department of Agriculture – Forest Service Region 4 AQM, SWINAC
1249 S Vinnell Way Ste 200 Boise, ID 83709
Solicitation No: 1284N819R0002
Offers are solicited for: Dixie Supervisor’s Office Building, Dixie National Forest
THIS PROJECT IS SET ASIDE 100% FOR SMALL BUSINESS
Important – Notice to Offeror:
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
3. At a minimum, offeror shall submit the following documents with their response to this solicitation:
SF-1442 – Solicitation, Offer and Award (Complete, Date, and Sign) Part I, Section B, Schedule of Items, (PDF and Excel format) provide WBS or similar information used to produce schedule B.
Part II, Section I, FAR 52.225-9 Buy American – Construction Materials (if applicable) Attachment 9, Standard Form 1413 - Subcontractor Form (if applicable) Standard Form 24 - Bid Bond Part IV, Section K, FAR 52.204-8 Annual Representations and Certifications Part IV, Section K, Violation of Arms Control Treaties or Agreements-Certification Responses to Technical, Business Evaluation Factors (Detailed in Sections L & M) NOTE: Forms must be completed and submitted intact.
The solicitation number shall be written on the outside of your envelope. Offers must be mailed or hand delivered (faxed offers will not be accepted).
Return to: USFS Region 4 - Acquisition Support Center ATTN: Matthew Morris 1249 S Vinnell Way Ste 200 Boise, ID, 83709 Phone: 208 841 5828 Matthew.morris@usda.gov Solicitation No: 1284N819R0002
IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED AND VALID IN THE System for Award Management – SAM – DATABASE, PRIOR TO AWARD UNDER THIS SOLICITATION. THE
WEBSITE IS https://www.sam.gov/SAM/; CONTRACTORS SHALL ALSO BE REGISTERED IN THE SAM
DATABASE UNDER THE NAICS CODE THAT THIS SOLICITATION IS BEING ISSUED UNDER, OR
DEMONSTRATE THEIR ABILITY TO QUALIFY AS A SMALL BUSINESS UNDER THE IDENTIFIED NAICS CODE.
mailto:Matthew.morris@usda.gov
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or R i )
1. SOLICITATION NO.
1284N819R0002
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
10-JUNE-
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
1284N819C00TBD
5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
USDA - Forest Service Region 4, Acquisition Management 1249 S Vinnell Way Ste 200 Boise, Idaho 83709
Same as 7
9. FOR INFORMATION
a. NAME Matt Morris
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS) 208 373 4166 matthew.morris@usda.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
Dixie Supervisor’s Office Building
Cedar City Ranger District, Dixie National Forest Cedar City, Iron County, State of Utah
Project Magnitude - The estimated project magnitude is between $5,000,000 and $10,000,000.
TOTAL SMALL BUSINESS SET ASIDE
11. The Contractor shall begin performance within 10 calendar days and complete it within 450 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and 1 electronic copy (either email or thumb drive, NO CDs) copies to perform the work required are due at the place specified in Item 8 by 1:00 pm local time Wednesday, July 15, 2019. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required. (If “is required” see 52.228-1 & 452.228-70)
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 45 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) mailto:matthew.morris@usda.gov
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
Duns No. _________________ TIN:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) (
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
USDA - Forest Service Region 4, Acquisition Management 1249 S Vinnell Way Ste 200 Boise, Idaho 83709
All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.
Attach “Construction Invoice Certification” to each invoice
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
MATTHEW MORRIS
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
http://www.ipp.gov/
Date
ITEM
REF ITEM NUMBER DESCRIPTION METHOD
OF MEAS UNIT QTY PRICE TOTAL
A 11900 Mobilization and Bonding LSQ LS 1
B 000001.1.13.B Asbestos Abatement and Hazardous Materials Removal LSQ LS 1
C 000001.1.13.C Demolition , disposal , salvage of WCF building, Oil/ Gas , sheds and sign shop
LSQ LS 1
D 000001.1.13.D Site Demolition LSQ LS 1
E 000001.1.13.E Civil Work: Earthwork, grading, fill, compaction, hauling. LSQ LS 1
F 000001.1.13.F Civil Work: Civil Utilities: Water, sanitary sewer, storm sewer drainage complete systems.
LSQ LS 1
G 000001.1.13.G Utility Connection Fees and Coordination LSQ LS 1
H 000001.1.13.H Site Electrical Demolition and Construction LSQ LS 1
I 000001.1.13.I Site improvements, pavements, curb, gutter, sidewalks, concrete retaining walls, vehicle access.
LSQ LS 1
J OFFICE
BUILDING
000501.A Office Building. General Conditions LSQ LS 1
000501.B Office Building. Site Work within 5 feet of perimeter LSQ LS 1
000501.C Office Building. Concrete Work LSQ LS 1
000501.D Office Building: Masonry LSQ LS 1
PART I - THE SCHEDULE
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
SignatureCompany
BASE BID
Section C.1.13
SCHEDULE OF ITEMS
DIXIE SUPERVISOR'S/ CEDAR CITY RANGER OFFICE
1284N819R0002 Dixie NF SO Construction Page 3 of 41
000501.E Office Building: Steel LSQ LS 1
000501.F Office Building: Woods and Plastics; Carpentry and Trim LSQ LS 1
000501.G Office Building: Thermal, Moisture Protection, Siding, roofing
LSQ LS 1
000501.H Office Building: Doors, Windows and Hardware LSQ LS 1
000501.I Office Building: Finishes LSQ LS 1
000501.J Office Building: Specialties LSQ LS 1
000501.K Office Building: Equipment/ furnishings LSQ LS 1
000501.L Office Building Fire Sprinkler System LSQ LS 1
000501.M Office Building: Plumbing LSQ LS 1
000501.N Office Building HVAC LSQ LS 1
000501.O Office Building: Power and Lighting, Security, Alarms, mech support, Division 26
LSQ LS 1
000501.P Office Building: Communications, Intercom Division 27 LSQ LS 1
000501.Q Office Building: Earthwork for building LSQ LS 1
K 000001.1.13.K Geothermal Wells LSQ LS 1
L 101420 Site ID Sign LSQ LS 1
ITEM
REF ITEM NUMBER DESCRIPTION METHOD
OF MEAS UNIT QUAN
TITY PRICE TOTAL
000001.1.14.A Secure Parking Area LSQ LS 1
Secure Parking Electrical LSQ LS 1
Total Base
Optional Bid Item #1 (Secure Parking Area)
Total Optional Bid Item #1
1284N819R0002 Dixie NF SO Construction Page 4 of 41
ITEM
REF ITEM NUMBER DESCRIPTION METHOD
OF MEAS UNIT QUAN
TITY PRICE TOTAL
101425 Site Furnishings - Log Stanchion (3- Panel) Bulletin Board AQ EA 1
107516 Site Furnishings - Flag Pole AQ EA 1
129300-1 Site Furnishings - Bicycle Rack AQ EA 3
129300-2 Site Furnishings - Picnic Tables AQ EA 4
ITEM
REF ITEM NUMBER DESCRIPTION METHOD
OF MEAS UNIT QUAN
TITY PRICE TOTAL
328000 Irrigation System LSQ LS 1
329220 Building Perimeter Drainage Structure LSQ LS 1
329310-1 Exterior Plants and Landscape Boulders LSQ LS 1
329310-2 Planting Media DQ CY 60
329310-3 Drystack Flagstone Retaining Walls AQ SF 530
329400 Landscape Stone, Wood Mulch, Weed Barrier & Steel Edging LSQ LS 1
* Designated Method of Measurement:
DQ – Designed Quantities; AQ - Actual Quantities, LSQ - Lump Sum Quantities; SQ – Staked Quantities; CQ – Contract Quantities
B- 2 Payment for Bond Premiums
B- 3 Option Items
000001.1.14.B Total Optional Bid Item #2
000001.1.14.C Total Optional Bid Item #3
The Government intends to award option items at the time of award, subject to the availability of funds. If option items are not included at time of award, the Government reserves the right to award option items up to one year from date of award.
Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
Total Base Bid & Options -
Optional Bid Item #2 (Site Furnishings)
Optional Bid Item #3(Landscaping)
1284N819R0002 Dixie NF SO Construction Page 5 of 41
SECTION C - DESCRIPTION/SPECIFICATIONS
452.211-72 Statement of Work/Specifications. (FEB 1988)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
1284N819R0002 Dixie NF SO Construction Page 6 of 41
PART I - THE SCHEDULE
SECTION D – PACKAGING AND MARKING
D.1 PROJECT LABELING FOR OFFICIAL CORREPONDENCE
Resulting contract will be identified with an individual contract number. This number shall be referenced on all official communication relating to the base IDIQ Contractor.
1284N819R0002 Dixie NF SO Construction Page 7 of 41
SECTION E - INSPECTION AND ACCEPTANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations -http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – https://www.dm.usda.gov/procurement/policy/agar_x/agar04.pdf
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection--Dismantling, Demolition, or Removal of Improvements (AUG 1996)
E- 1 PRE-FINAL AND FINAL INSPECTION
a. Pre-final Inspection: The Government may, at its own discretion, conduct a pre-final inspection prior to the contractor requesting a final inspection. Any discrepancies noted shall be corrected prior to final inspection.
b. Final Inspection: When the work is ready for final inspection, the Contractor shall submit a written request for the final inspection to the duly assigned Contracting Officer’s Representative at least seven (7) days prior to the desired final inspection date. The final inspection will be performed with the Contractor by the appropriate Government personnel. If any discrepancies are noted, they shall be handled in accordance with 52.246-12.
1284N819R0002 Dixie NF SO Construction Page 8 of 41 http://www.acquisition.gov/far
SECTION F - DELIVERIES OR PERFORMANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations -http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – https://www.dm.usda.gov/procurement/policy/agar_x/agar04.pdf
(End of clause)
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
(DEVIATION)
The Contractor shall be required to (a) commence work under this contract within 5-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work within 450 Calendar Days and ready for use not later than November 30, 2020. The time stated for completion shall include final cleanup of the premises.
1284N819R0002 Dixie NF SO Construction Page 9 of 41
SECTION G – CONTRACT ADMINISTRATION
452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror(s) is required. It will be scheduled within fourteen (14) days after the date of contract award. The conference will be held at a time and location to be determined.
(End of Clause)
G- 1 DEFINITIONS
(a) CONTRACTING OFFICER means a person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to a contract.
(b) CONTRACTING OFFICER'S REPRESENTATIVE. The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the pre-work conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the contract shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.
(c) CONTRACTOR'S REPRESENTATIVE. Any representative of the Contractor shall be designated in writing.
The designation shall clearly indicate the name and limitations of authority, if any, of the representative.
G- 2 CONTRACT ADMINISTRATION
2.1 CONTRACTING OFFICE
The Utah Acquisition Support Center of the United States Forest Service, Department of Agriculture is responsible for this solicitation, award and administration of the contract. All written correspondence shall reference the contract number and/or solicitation number. All correspondence, unless otherwise specified, shall be directed to the Contracting Officer at the following address:
USFS Region 4 - Acquisition Support Center Matthew Morris 1249 S Vinnell Way Ste 200 Boise, ID 83709 Matthew.morris@usda.gov
Note: Include Contract Number on all correspondence.
2.2 DESIGNATION OF CONTRACTING OFFICER REPRESENTATIVE
Prior to the commencement of work, the COR will be designated. The COR is responsible for administering the performance of the work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by the Contracting Officer prior to the completion of this contract.
2.3 CONTRACTING OFFICER’S REPRESENTATIVE
The awarded contract will have a Contracting Officer’s Representative (COR) designated by appointment letter.
1284N819R0002 Dixie NF SO Construction Page 10 of 41 mailto:Matthew.morris@usda.gov
G- 3 SUBCONTRACTS
Before entering into a subcontract covering any part of the work called for, the Contractor shall inform the Contracting Officer and submit an executed Statement and Acknowledgment Standard Form 1413, to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be submitted before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory "flowdown" contract clauses have been included in their contract in accordance with FAR Clause 52.222-11. Completing this form creates no contractual relationship between subcontractors and the Government.
G- 4 INVOICES
The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.
Upon award of a contract, Contractors will be enrolled automatically. Contractor will subsequently receive electronic notification from IPP of enrollment. IPP password will be delivered electronically to allow first login to IPP. Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted.
The email notification of payment is sent when a payment is distributed to your bank account and will include all pertinent payment information. For additional information, please visit the www.ipp.gov website to learn more. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding Federal holidays) from 8 a.m. to 6 p.m. ET, to answer questions related to accessing IPP or completing the registration process. Their toll-free number is 1-866-973.3131 or they can be reached at IPPCustomerSupport@fms.treas.gov.
1284N819R0002 Dixie NF SO Construction Page 11 of 41 mailto:IPPCustomerSupport@fms.treas.gov
SECTION H - SPECIAL CONTRACT REQUIREMENTS
52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of geotechnical site investigations by GSH Engineering documented in the geotechnical report attached to the solicitation, the hazardous materials investigations by Terracon also included, and
(b) Weather conditions: The Cedar City site is in a temperate climate with average winter snowfall of 49 inches and 11.3 inches of average precipitation. The average summer high is 90 degrees in July and August and an average low of 16 degrees in January.
(c) Transportation facilities: Facilities to serve the site are mostly limited to private vehicles. There are a limited number of bus lines in Cedar City.
H- 1 Use of Premises
The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform the contract in such a manner as not to interrupt or interfere with the conduct of Government business.
H- 2 KEY PERSONNEL
The key personnel specified in the Offeror’s Technical Proposal, Project Manager and Quality Control Manager, are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer:
Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H- 3 SITE SUPERINTENDENT
It shall be the responsibility of the Contractor to provide a responsible site superintendent to represent the Contractor in the field in all matters under this contract including, but not limited to construction, day-to-day coordination of activities, control over employees and subcontractors, and coordination with local Government personnel. The site superintendent shall be designated in writing. They shall be available on site in person to respond to any and all problems during normal working hours. The site superintendent shall be responsible for on-site Quality Control.
Site superintendent shall maintain on site a file containing the following project documents.
• Executed Copy of the Contract
• Contract Drawings
• Contract Specifications
• Quality Control Plan – (up to date)
• As-Built Drawing – (up to date) if required
• Work Orders
• Modifications
This file shall be maintained and available to the Contracting Officer upon request. If the Site Superintendent is replaced, the existing Superintendent shall review all documents and ongoing issues with the new Superintendent.
1284N819R0002 Dixie NF SO Construction Page 12 of 41
H- 5 INCIDENTAL PAYMENT ITEMS
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H- 6 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H- 7 SAMPLES, TESTS, CITED SPECIFICATIONS
Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H- 8 BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H- 9 WEED-FREE EQUIPMENT
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
1284N819R0002 Dixie NF SO Construction Page 13 of 41
H-10 LANDSCAPE PRESERVATION
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.
Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H-11 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b) Contact Information. At the Prework Meeting, the name and email address of the Contractor Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
H-12 WORK SCHEDULE
A Work Schedule shall define the overall time required to perform the identified work. Each major task, including beginning time and ending time, shall be identified within the schedule. Notify the Contracting Officer whenever there are significant departures from the approved Work Schedule. Submit any requests to modify the Work Schedule, in writing to the Contracting Officer with an explanation for the deviation.
H-13 Government-furnished Property
Per FAR 52.245-1 (Section I), the following property will be provided under this acquisition as Government Furnished Property:
• Historic road grader to be relocated on site
• Electric Car Charging Station
H-14 BIOBASED PRODUCT UTILIZATION
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and
1284N819R0002 Dixie NF SO Construction Page 14 of 41
Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Doug Fir Wood Framing Plywood/ wood panel products
Concrete release form oil Engineered lumber (I-joist) roof framing Wood doors Wood windows Decorative wood panel products Biobased interior paints Biobased stains Biobased polyurethane finishes Soil Amendments for planting
Any appropriate cleaning products Grease Removers Insulating Foam Concrete and Asphalt Release Fluids Fluid-filled Transformers Wood and Concrete Sealers Composite Panels Carpets Roof Coatings Hydraulic Fluid
Absorbents Dust Suppressants Fertilizers Cleaners Sorbents Floor Finish Floor Stripper Insulating Foam Sealers Metalworking Fluids Graffiti and Grease Removers Degreasers
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract (see Section L, Clause L- * - Instructions for the Preparation of Technical and Business Proposals).
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
Within thirty (30) days of contract award, the Contractor shall submit an Operation Plan. This submittal will be approved by the COR in writing. The Contractor shall not commence work until this submittal is approved by the COR in writing. The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:
• The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.
1284N819R0002 Dixie NF SO Construction Page 15 of 41 http://www.biopreferred.gov/
• Detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.
• Proposed biobased construction products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.
NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
• The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.
The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data shall be submitted to the COR quarterly.
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
1284N819R0002 Dixie NF SO Construction Page 16 of 41
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – https://www.dm.usda.gov/procurement/policy/agar_x/agar04.pdf
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-13 Contractor Code of Business Ethics and Conduct (OCT 2015) 52.203-14 Display of Hotline Poster(s) (OCT 2015) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower
Rights (APR 2014) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications. (Dec 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (JUL 2018) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or
Proposed for Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (OCT 2018)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (JUL 2013)
52.222-3 Convict Labor (JUNE 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
1284N819R0002 Dixie NF SO Construction Page 17 of 41
52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEPT 2013)
52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JULY 1995) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG
2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
52.223-20 AEROSOLS (JUN 2016)
52.223-21 FOAMS (JUN 2016)
52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance--Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014)
52.228-15 PEFORMANCE AND PAYMENT BONDS – CONSTRUCTION (OCT 2010)
52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) Alternate I (DEC 1991) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-1 PERFORMACNE OF WORK BY CONTRACTOR (APR 1984)
52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984)
1284N819R0002 Dixie NF SO Construction Page 18 of 41
52.236-26 Preconstruction Conference (FEB 1995) 52.242-5 Payments to Small Business Subcontractors (JAN 2017) 52.242-13 Bankruptcy (JULY 1995) 52.243-4 Changes (JUNE 2007) 52.244-6 Subcontracts for Commercial Items (OCT 2018) 52.245-1 Government Property (JAN 2017) Alternate I (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.246-21 Warranty of Construction Alternate I (Apr 1984) 52.248-3 Value Engineering--Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEPT 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (Nov 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 752.236-77 Emergency Response (NOV 1996)
52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2017) (DEVIATION 2019-O0003)
Class Deviation 2019-O0003 (dtd 12/3/18)—Limitations on Subcontracting for Small Business. Effective immediately this deviation remains in effect until it is incorporated into the FAR and DFARS, or otherwise rescinded
Limitations on Subcontracting (Jan 2019) (DEVIATION 2019-O0003)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. As used in this clause—
“Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone set-aside or sole source award under the HUBZone Program.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;
and
(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Agreement. By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract in the case of a contract for—
1284N819R0002 Dixie NF SO Construction Page 19 of 41
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(2) Supplies (other than procurement from a non-manufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.
(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERRED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause--
"Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall--
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to Matthew Morris, Contract Specialist.
52.225-9 BUY AMERICAN–CONSTRUCTION MATERIALS (MAY2014)(DEVIATION)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
1284N819R0002 Dixie NF SO Construction Page 20 of 41
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Component" means any article, material, or supply incorporated directly into construction materials.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.
Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means--
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a…