1284N819R0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
84N8
SALT LAKE CITY UT 84104
1749 W 500 S
REGION 4 UTAH ACQ SUPPORT CTR
USDA FOREST SERVICE
07/01/20190001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/10/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
Provide Q&As
Update light schedule page 96 of 105 on drawings
Change due date to Wednesday, 17 July 2019
Provide HAZMAT Report
Replace cover Sheet
Replace Page 1 SF1442
Replace Page 25 of Solicitation adding to section J
Replace page 36 of Solicitation changing information on proposal submission
Replace page 38 of Solicitation changing 3 to 5 years
Provide Sign in sheet
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 18
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1284N819R0002/0001
Period of Performance: 08/15/2019 to 11/30/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
REGION 4 UTAH ACQUISITION SUPPORT CENTER INSTRUCTIONAL COVER SHEET
Issuing Office: U.S. Department of Agriculture – Forest Service Region 4 AQM, SWINAC
1249 S Vinnell Way Ste 200 Boise, ID 83709
Solicitation No: 1284N819R0002
Offers are solicited for: Dixie Supervisor’s Office Building, Dixie National Forest
THIS PROJECT IS SET ASIDE 100% FOR SMALL BUSINESS
Important – Notice to Offeror:
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
3. At a minimum, offeror shall submit the following documents with their response to this solicitation:
SF-1442 – Solicitation, Offer and Award (Complete, Date, and Sign) Part I, Section B, Schedule of Items, (PDF and Excel format) provide WBS or similar information used to produce schedule B.
Part II, Section I, FAR 52.225-9 Buy American – Construction Materials (if applicable) Attachment 9, Standard Form 1413 - Subcontractor Form (if applicable) Standard Form 24 - Bid Bond Part IV, Section K, FAR 52.204-8 Annual Representations and Certifications Part IV, Section K, Violation of Arms Control Treaties or Agreements-Certification Responses to Technical, Business Evaluation Factors (Detailed in Sections L & M) NOTE: Forms must be completed and submitted intact.
The solicitation number shall be written on the outside of your envelope. (faxed offers will not be accepted).
Email or mail (thumb-drive) complete proposal to:
USFS Region 4 - Acquisition Support Center ATTN: Matthew Morris 1249 S Vinnell Way Ste 200 Boise, ID, 83709 by the date and time listed in Block 13 on SF 1442
Phone: 208 841 5828 Matthew.morris@usda.gov Solicitation No: 1284N819R0002 IT IS REQUIRED THAT ALL CONTRACTOR’S BE REGISTERED AND VALID IN THE System for Award Management – SAM – DATABASE, PRIOR TO AWARD UNDER THIS SOLICITATION. THE
WEBSITE IS https://www.sam.gov/SAM/; CONTRACTORS SHALL ALSO BE REGISTERED IN THE SAM
DATABASE UNDER THE NAICS CODE THAT THIS SOLICITATION IS BEING ISSUED UNDER, OR
DEMONSTRATE THEIR ABILITY TO QUALIFY AS A SMALL BUSINESS UNDER THE IDENTIFIED NAICS CODE.
or list with line cards & Past Performance Information
Mail (postmarked on date in Block 13 on SF1442) or hand deliver 1 printed copy of technical proposal to:
Steven O'Neil 1789s N Wedgewood Lane Cedar City, UT 84721
1284N819R0002 0001 Page 3 of 18 mailto:Matthew.morris@usda.gov mamorris Highlight mamorris Highlight
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or R i )
1. SOLICITATION NO.
1284N819R0002
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
10-JUNE-
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
1284N819C00TBD
5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
USDA - Forest Service Region 4, Acquisition Management 1249 S Vinnell Way Ste 200 Boise, Idaho 83709
Same as 7
9. FOR INFORMATION
a. NAME Matt Morris
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS) 208 373 4166 matthew.morris@usda.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
Dixie Supervisor’s Office Building
Cedar City Ranger District, Dixie National Forest Cedar City, Iron County, State of Utah
Project Magnitude - The estimated project magnitude is between $5,000,000 and $10,000,000.
TOTAL SMALL BUSINESS SET ASIDE
11. The Contractor shall begin performance within 10 calendar days and complete it within 450 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and 1 electronic copy (either email or thumb drive, NO CDs) copies to perform the work required are due at the place specified in Item 8 by 3:00 pm local time Wednesday, July 17, 2019. If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required. (If “is required” see 52.228-1 & 452.228-70)
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 45 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
1284N819R0002 0001 Page 4 of 18 mailto:matthew.morris@usda.gov
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Wage Rate Requirements (Construction) Statute: If this is a contract in excess of $2,000, the Wage Rate Requirements (Construction) statute requires the Contractor to pay certain minimum wages and benefits to employees working under this contract. These required minimum wages are stated in the attached Wage Decision. Pursuant to Executive Order 13658, the minimum hourly wage rate required to be paid to workers performing on, or in connection with, contracts and subcontracts subject to FAR Subpart 22.19, is at least $10.60 per hour beginning January 1, 2018 , and annually thereafter, an amount determined by the Secretary of Labor. See FAR Subpart 22.19.
The following attachments are a part of this solicitation and any resulting contract (see separate document(s)).
Attachments Not included in award
1284N819R0002 Dixie NF SO Construction Page 25 of 41
Included in award Attachment 14 USFS Compound Cedar City ASB and UHM Survey
1284N819R0002 0001 Page 5 of 18 control, quality control, and cost control on projects completed within the last five (5) years associated with each of the following types of Major Feature Work Experience (MFWE) commensurate with the scope and magnitude of the work presented in this solicitaiton:
Demolition and site development Excavation and Embankment Foundations and Footings Mechanical Systems Electrical and data Systems Utility systems Asphalt and concrete surfacing Framing and structural Roofing systems Finishes (siding, trims, paint, etc.)
Offerors are to provide five (5) past performance references (Attachement 12), that reflect recent, relevant experience within the last five (5) years, as of the solicitation release date, that demonstrate the Offeror’s ability to handle the scope, breadth, and depth identified in the Statement of Work (SOW). Offerors may discuss past accomplishments that indicate the offeror’s ability to perform the work required by the contract. If problems were encountered during contract performance, indicate your efforts to resolve them. For those contracts with less than positive performance, you are encouraged to provide a description of the problems and the efforts made to correct and to prevent future occurrences.
The offeror shall submit Past Performance Questionnaires (Attachment 12) to their references and have the references complete and return the questionnaires to Matt Morris via email to matthew.morris@usda.gov. The contractor shall assure that Past Performance Questionnaires are submitted by references prior to the proposal due date. Failure to submit Past Performance Questionnaires within the requested timeframe may result in the inability of the Government to rate the Offeror’s Past Performance and may affect the overall rating of the Offeror’s proposal. It is the Offeror’s responsibility to ensure that references respond within the required timeframe. If the Offeror does not provide five past performance references during the last three years, the Offeror shall address this and provide a written narrative detailing the reasons for not providing the references.
The Government reserves the right to use any such information received as part of its evaluation of the Offeror’s past performance and to directly solicit input on the Offeror’s past performance from any other sources and the Government may use any other data available to its evaluators, including the personal knowledge of those individuals. The Government reserves the right to limit or expand the number of references it contacts and to contact references other than those provided by the Offeror. If the Offeror omits projects of which the Government evaluation team is aware or becomes aware, customer assessments may be sought from the relevant organization.
If subcontracting is proposed for subject Contract, past performance references where the Offeror has served as a prime Contractor with Subcontractors would be of interest.
Note: Information shall be provided for the offeror as well as any principle subcontractor(s) that will perform key aspects of the requirement. If the offeror submits Past Performance Information (PPIR) for a subcontractor, the offeror shall also submit the consent of the subcontractor for the Government to disclose the PPIR to the offeror (prime) during negotiations.
5. Worksite Safety: Offeror shall provide a project specific safety plan that address:
a. Organization’s safety protocols,
b. communication,
c. Safety Plan implementation on the project,
d. Identification of activities that warrant a site specific job hazard analysis (JHA),
e. protection of the public and Government personnel, and
f. Managing subcontractor’s compliance with offer’s safety plan.
1284N819R0002 Dixie NF SO Construction Page 38 of 41
1284N819R0002 0001 Page 6 of 18 mamorris Highlight
52.252-3 ALTERATIONS IN SOLICITATION Alterations in Solicitation (APR 1984)
Portions of this solicitation are altered as follows:
FAR 52.236-27 – Site Visit AGAR 452.215-71 – Instructions for Preparation of Technical and Business Proposals
(End of Provision)
52.252-5 AUTHORIZED DEVIATION IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Agriculture Acquisition Regulation (48 CFR Chapter 4) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of Provision)
452.204-70 INQUIRES (FEB 1988)
Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer. Offerors should contact only the Contracting Officer issuing the solicitation about any aspect of this requirement prior to contract award.
(End of Provision)
452.215-71 INSTRUCTIONS FOR THE PREPARATION OF TECHNICAL AND BUSINESS PROPOSALS
(SEP 1999) (DEVITATION)
(a) General Instructions. Proposals submitted in response to this solicitation shall be furnished in the following format with the numbers of copies as specified below.
(1) The proposal must include a technical and business proposal. Each of the parts shall be separate and complete so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to cost; however, resource information (such as data concerning labor hours and categories, materials, subcontracts, etc.) must be contained in the technical proposal so that the contractor's understanding of the statement of work may be evaluated.
(2) Offerors may, at their discretion, submit alternate proposals or proposals which deviate from the requirement; provided, that an offeror also submit a proposal for performance of the work as specified in the statement of work. Any "alternate" proposal may be considered if overall performance would be improved or not compromised, and if it is in the best interest of the Government. Alternate proposals, or deviations from any requirement of this RFP, must be clearly identified.
(3) The Government will evaluate proposals in accordance with the evaluation criteria set forth in Section M of this RFP.
(4) Offerors shall submit their proposal(s) in the following format and the quantities specified: see cover sheet for address
(i) 1 complete copy, signed, emailed or mailed (thumbdrive) to Matt Morris. due before closing.
(ii) 1 printed copy of the technical proposal. mailed or hand delivered on closing date.
(a)Technical Proposals are limited to 60 pages. Times New Roman, 12 font size, number pages
(b) Include as appendix: 1-subcontractor information, 2-QC Plan 20 page limit, 3-Safety Plan 20 page limit, 4-Past performance
5.1 Technical Proposal Instructions. The technical proposal will be used to make an evaluation and arrive at a determination as to whether the proposal will meet the requirements of the Government. Therefore, the technical proposal must present sufficient information to reflect a thorough understanding of the requirements and a detailed, 1284N819R0002 Dixie NF SO Construction Page 36 of 41
1284N819R0002 0001 Page 7 of 18 mamorris Highlight
LUMINAIRE SCHEDULE (With changes)
Chang ed
TYPE DESCRIPTION MANUFACTURER MODEL # LAMPS MOUNTING
Qty
NOTES:
Yes A(E)
2X4 ARCHITECTURAL LITHONIA 2BLT4 48L SDSM GZ10 LP935 LED RECESSED/CEILING 112
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes B(E)
2X2 ARCHITECTURAL LITHONIA BLC 2X2 3300LM 80CRI 35K LED RECESSED/CEILING 18
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes C(E)
1X4 WRAP AROUND LITHONIA LBL4 4000LM 80CRI 35K MVOLT LED SURFACE/CEILING 26
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes D 2X4 ARCHITECTURAL LITHONIA 2AVL4 50L MDR GZ10 LP835 LED RECESSED/CEILING 24
Yes EE CYLINDER GOTHAM EVO CYL 35/10 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 3 WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes
F(E)
CYLINDER GOTHAM EVO CYL 35/30 6AR WD LS MVOLT GZ10 PM DNA LED PENDANT/CEILING 6
MOUNT BOTTOM AT 10', (E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes
FS(E)
CYLINDER GOTHAM EVO CYL 35/30 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 6
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
Yes FWE CYLINDER GOTHAM EVO CYL 35/30 6AR WD LS MVOLT GZ10 WM DDB LED WALL/CEILING 1
MOUNT BOTTOM AT 10', WIRE TO SECURITY/EMERGENCY CIRCUIT
G(E,1)
DOWN LIGHT JUNO 6RLS G2 10LM 30K 90CRI 120 FRPC WH LED SURFACE/CEILING 5
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT (1) INDICATES SEAL TO
CEILING WITH CAULK PER INSTRUCTIONS TO MAKE WET LOCATION RATED
X1 EXIT SIGN LITHONIA LE S 1 G LED SURFACE/BACK/WALL 10 WIRE TO SECURITY/EMERGENCY CIRCUIT
X2 EXIT SIGN LITHONIA LE S 2 G LED
SURFACE/SIDE/WALL
AND SURFACE/CEILING
WIRE TO SECURITY/EMERGENCY CIRCUIT, CEILING MOUNT REQUIRES BRACKET
TO ALLOW FOR DROP CEILING MOUNT
3 LED FLOODLIGHT LITHONIA OVFL LED 2RH 40K 120 PE WH HP17 LED SURFACE/WALL 8
WIRE TO SECURITY/EMERGENCY CIRCUIT WITH MONITORING OF THE LOCAL
CIRCUIT FOR CONTROL OF FIXTURE, REMOVE PHOTO CONTROL
S1 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T3M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 3 SEE DETAIL FOR POLE
S2 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K TFTM MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 2 SEE DETAIL FOR POLE
S3 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T5M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 4 SEE DETAIL FOR POLE
S4 ROUND BOLLARD LITHONIA KBA8 12C 350 40K ASY MVOLT DDBXD LED CONCRETE PAD 6
S5 LED AREA LUMINAIRE LITHONIA DSX1 LED 30C 530 40K T5W MVOLT MA DDBXD LED
4FT ARM ON SHORT
POLE
SMACU T14 US4 DDB MAST ARM, SEE POLE DETAIL W/ THESE MODS: 12' TALL
POLE, 52" DEEP CONCRETE BASE WITH 48" BELOW GRADE AND ONLY 6 #3 RINGS
TOTAL 241
Changes amount to Color Temperature only, except for Type A fixtures which change to BLT types and CRI to 90.
DIXIE NF SUPERVISOR'S AND CEDAR CITY RANGER
DISTRICT OFFICE Sheet E001 Change
LUMINAIRE SCHEDULE (per signed package)
TYPE DESCRIPTION MANUFACTURER MODEL # LAMPS MOUNTING
Qty
NOTES:
A(E)
2X4 ARCHITECTURAL LITHONIA BLC 2X4 5000LM 80CRI 40K LED RECESSED/CEILING 112
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
B(E)
2X2 ARCHITECTURAL LITHONIA BLC 2X2 3300LM 80CRI 40K LED RECESSED/CEILING 18
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
C(E)
1X4 WRAP AROUND LITHONIA LBL4 4000LM 80CRI 40K MVOLT LED SURFACE/CEILING 26
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
D 2X4 ARCHITECTURAL LITHONIA 2AVL4 50LMDR MVOLT GZ10 LP840 LED RECESSED/CEILING 24
EE CYLINDER GOTHAM EVO CYL 40/10 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 3 WIRE TO SECURITY/EMERGENCY CIRCUIT
F(E)
CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 PM DNA LED PENDANT/CEILING 6
MOUNT BOTTOM AT 10', (E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
FS(E)
CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 6
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
FWE CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 WM DDB LED WALL/CEILING 1
MOUNT BOTTOM AT 10', WIRE TO SECURITY/EMERGENCY CIRCUIT
G(E,1)
DOWN LIGHT JUNO 6RLS G2 10LM 30K 90CRI 120 FRPC WH LED SURFACE/CEILING 5
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT (1) INDICATES SEAL TO
CEILING WITH CAULK PER INSTRUCTIONS TO MAKE WET LOCATION RATED
X1 EXIT SIGN LITHONIA LE S 1 G LED SURFACE/BACK/WALL 10 WIRE TO SECURITY/EMERGENCY CIRCUIT
X2 EXIT SIGN LITHONIA LE S 2 G LED
SURFACE/SIDE/WALL
AND SURFACE/CEILING
WIRE TO SECURITY/EMERGENCY CIRCUIT, CEILING MOUNT REQUIRES BRACKET
TO ALLOW FOR DROP CEILING MOUNT
3 LED FLOODLIGHT LITHONIA OVFL LED 2RH 40K 120 PE WH HP17 LED SURFACE/WALL 8
WIRE TO SECURITY/EMERGENCY CIRCUIT WITH MONITORING OF THE LOCAL
CIRCUIT FOR CONTROL OF FIXTURE, REMOVE PHOTO CONTROL
S1 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T3M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 3 SEE DETAIL FOR POLE
S2 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K TFTM MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 2 SEE DETAIL FOR POLE
S3 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T5M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 4 SEE DETAIL FOR POLE
S4 ROUND BOLLARD LITHONIA KBA8 12C 350 40K ASY MVOLT DDBXD LED CONCRETE PAD 6
S5 LED AREA LUMINAIRE LITHONIA DSX1 LED 30C 530 40K T5W MVOLT MA DDBXD LED
4FT ARM ON SHORT
POLE
SMACU T14 US4 DDB MAST ARM, SEE POLE DETAIL W/ THESE MODS: 12' TALL
POLE, 52" DEEP CONCRETE BASE WITH 48" BELOW GRADE AND ONLY 6 #3 RINGS
TOTAL 241
1284N819R0002 0001 Page 8 of 18
PANEL S SCHEDULE
TYPE: SQUARE D [HCN23656 INTERIOR, HC2665WP NEMA 3R
BOX, HC6SN SOLID NEUTRAL, AND FS METER CT'S BY
CONTRACTOR]
120/208 VAC 3
PHASE A.I.C.:
65,000 SURFACE
MOUNT
FEEDER: TWO SZ 3.0C, 4#4/0&1/0GND. FROM CT CAN, WITH
TWO SIZE 4.0C TO TRANSFORMER PAD AND ON TO POLE
(SEE DETAILS ON SHEET E002 AND ES101)
GROUNDING: #1/0 CU GND SEE DETAIL AND SPECIFICATIONS
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 PANEL M
20128
QGA32225
4/0
20128
MIN.
QGA32100
TVSS 217420 17420
15193 15193
3 PANEL R
15550
QGA32225
4/0
18725
QGA32100
PANEL L 417020 20005 2985
19610 24520 4910
PANEL RN
QGA32125
610296 10296
10240 10240
7 PANEL RS
QGA32100 1
86480 6480
4860 4860
LOAD PER PHASE:
(WATTS)
54873 54201 54813
PANEL M SCHEDULE
TYPE: SQUARE D [NQ442L2 INTERIOR, MH38 BOX, NC38SHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 2.5C, 4#4/0&1#4GND. FROM PANEL S
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
GEOTHERMAL LOOP PUMPS AND CONTROLS
QOB230
6 QOB350
WATER SOURCE HEAT RECOVERY UNIT SECTION A
3 1375 6175 4800 4
5 4800 4800 6
FAN COIL UNITS AND BRANCH SELECT BOXES - EAST
QOB115 14
6 QOB350
WATER SOURCE HEAT RECOVERY UNIT SECTION B
9 1310 6110 4800 10
FAN COIL UNITS AND BRANCH SELECT BOXES - WEST
QOB115 14
6153 4800 12
13 1353 4153
12 QOB320
ENERGY RECOVERY UNIT
15 FIRE ALARM SYSTEM QO115 14 2800 2800 16
SPLIT SYSTEM-TELECOM ROOM
QOB220 12
4240 2800 18
19 1440 3690
10 QOB230
WATER HEATER-MECHANICAL ROOM
21 HOT WATER CIRCULATION PUMP 85 QOB115 14 2335 2250 22
23 0 0 24
25 0 0 26
27 0 0 28
29 0 0 30
31 0 0 32
33 0 0 34
35 0 0 36
37 0 0
QO315
FOREST SERVICE METERING
39 0 0 40
41 0 0 42
LOAD PER PHASE:
(WATTS)
20128 17420 15193
PANEL RN SCHEDULE
TYPE: SQUARE D [NQ442L2 INTERIOR, MH38 BOX, NC38FHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 1.5C, 4#1&1#6GND. FROM PANEL S
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 RECEPT-NORTH OPEN OFFICE NORTHWEST 5 CUBIES, HALL 1080 QOB120 12 2880 12 QOB120 1800 SWITCHED RECEPT-NORTH OPEN OFFICE NORTHWEST 5 CUBIES 2
3 RECEPT-NORTH SHARED OFFICE 5 CUBIES 900
QOB120
12 2700 12
QOB120
1800 SWITCHED RECEPT-NORTH SHARED OFFICE 5 CUBIES 4
5 RECEPT-NORTH OPEN OFFICE SOUTHWEST 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-NORTH OPEN OFFICE SOUTHWEST 5 CUBIES 6
7 RECEPT-NORTH OPEN OFFICE MIDDLE 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-NORTH OPEN OFFICE MIDDLE 5 CUBIES 8
9 RECEPT-NORTH OPEN OFFICE EAST 4 CUBIES 720
QOB120
12 2160 12
QOB120
1440 SWITCHED RECEPT-NORTH OPEN OFFICE EAST 4 CUBIES 10
RECEPT-2 NORTH OFFICES (LEO, DR) AND SHARED OFFICE
1440 QOB120 12 3420 12 QOB120 1980
SWITCHED RECEPT-2 NORTH OFFICES (LEO, DR), HUDDLE ROOMS,
AND SHARED OFFICE
13 RECEPT-NORTH FILE/PRINT AREA AND OPEN OFFICE SHARED WALL 1080 QOB120 12 1260 12 QOB120 180 RECEPT-NORTH OPEN OFFICE LEFT SIDE OF SINK 14
15 RECEPT-NORTH SMALL CONFERENCE ROOM AND SMALL STORAGE 900
QOB120
12 1080 12
QOB120
180 RECEPT-NORTH OPEN OFFICE RIGHT SIDE OF SINK 16
17 RECEPT-MAIN BREAK ROOM WORK COUNTER/EXTERIOR 540 QOB120 12 720 12 QOB120 180 RECEPT-MAIN BREAK ROOM LEFT SIDE OF SINK 18
19 RECEPT-LOBBY DRINK/RESTROOMS/NORTHWEST SIDE 900 QOB120 12 1080 12 QOB120 180 RECEPT-MAIN BREAK ROOM RIGHT SIDE OF SINK 20
21 HAND DRYER- MENS SMALL PUBLIC
2000 QOB120
QOB120 700
RECEPT-MAIN BREAK ROOM FRIDGE 22
23 HAND DRYER- WOMENS SMALL PUBLIC 2000 QOB120 12 3400 12 QOB120 1400 RECEPT-MAIN BREAK ROOM VENDING AREA 24
25 0 180 12 QOB120 180 RECEPT-MAIN BREAK ROOM SOUTH COUNTER 26
27 0 1656 14 QOB115 1656 RECEPT-MAIN BREAK GARBAGE DISPOSAL 28
29 0 0 30
31 0 0 32
33 0 0 34
35 0 0 36
37 0 0 38
39 0 0 40
41 0 0 42
LOAD PER PHASE:
(WATTS)
8100 10296 10240
PANEL T SCHEDULE
TYPE: SQUARE D [NQ418L1 INTERIOR, MH26 BOX, NC26SHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 1C, 4#6&1#8GND. FROM PANEL R
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 RECEPT-NORTH WALL EAST 360
QOB120
12 360 2
3 RECEPT-NORTH WALL WEST 360 QOB120 12 2360 12 QOB120 2000 RECEPT-TWISTLOCK EAST WALL NORTH 4
5 RECEPT-WEST WALL NORTH 360 QOB120 12 2360 12 QOB120 2000 RECEPT-TWISTLOCK EAST WALL SOUTH 6
7 RECEPT-WEST WALL SOUTH
360 QOB120
360 8
9 RECEPT-SOUTH WALL 360 QOB120 12 360 10
11 0 0 12
13 0 0 14
15 0 0 16
17 0 0 18
LOAD PER PHASE:
(WATTS)
720 2720 2360
PANEL L SCHEDULE
TYPE: SQUARE D [NQ418L1 INTERIOR, MH26 BOX, NC26FHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 1.5C, 4#1&1#6GND. FROM PANEL S
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AWG BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 0 0 2
3 LIGHTING-SOUTHEAST WING 1195 QOB120 12 2405 12 QOB120 1210
LIGHTING-RANGER OFFICE, CONFERENCE & RESTROOMS
LIGHTING-SOUTH OFFICES MAIN AREA & MIDDLE UTILITY ROOMS AND
MIDDLE CONFERENCE ROOM
1235 QOB120 12 2265 12 QOB120 1030
LIGHTING-NORTHWEST WING EXCEPT EAST EDGE AND SMALL
STORAGE AREAS
LIGHTING-DUMP ROOM, PRINT AREA, AND EAST AREAS EXCEPT
NORTH EDGE
QOB120
12 2270 12
QOB120
LIGHTING-NW WING THRU MIDDLE AREA EAST AND NORTH EDGES,
INCLUDING MAIN CONF STORAGE & STORAGE AT BREAKROOM
TIMER AND CONTROLS, AND LIGHTING-HALLS AND LOBBY
580 QOB120 12 580 10
11 LIGHTING-PARKING NORMAL 1145
QOB120
10 2645 12
QOB120
SECURITY/EMERGENCY LIGHTING, AND INVERTER
LIGHTING-PARKING SECURITY, KIOSK, AND FLAG
QOB120
10 905 14
15 0 0 16
17 0 0 18
LOAD PER PHASE:
(WATTS)
3175 2985 4910
LEGEND
METER BASE, PER POWER COMPANY
REQUIREMENTS
LOAD CENTER/ PANELBOARD "X", MAY BE LABELED
PNL "X" OR JUST "X" IF TO CROWDED
SURGE SUPPRESSOR
FOREST SERVICE ELECTRICAL METER, FOREST
SERVICE PROVIDED WITHOUT CT'S, SEE
SPECIFICATIONS
CURRENT TRANSFORMER CABINET, 36x48x11, PER
POWER COMPANY REQUIREMENTS, FS CT'S NOT
ALLOWED INSIDE
SAFETY DISCONNECT SWITCH, GENERAL DUTY WITH
HANDLE DISCONNECT, SIZE AND FUSES PER
APPLICATION
BELOW SLAB COMMUNICATIONS LINE (ELECTRICAL
LINES NOT SHOWN)
BURIED COMMUNICATIONS LINE (ELECTRICAL LINES
NOT SHOWN)
12-INCH LADDER TRAY
WIRE BASKET RUNWAY OF SIZES SHOWN
JUNCTION BOX, FEED FOR FURNITURE OR OTHER
EQUIPMENT TYPICAL
CONSOLIDATION POINT JUNCTION BOX,
COMMUNICATIONS FEED FOR FURNITURE
GFCI DEVICE, MOUNT FULLY ACCESSIBLE, PROTECTS
DOWNFED CONCEALED RECEPTACLE
MOTOR OR MOTORS, SEE MECHANICAL FOR "X"
NOMENCLATURE AND REQUIREMENTS
MOTORIZED DAMPER(S) WITH DISCONNECTS
POSSIBLE, COORDINATE WITH MECHANICAL PLANS
FOR INFORMATION AND CONTROL REQUIREMENTS
FAN COIL OR BRANCH SELECTOR BOX, SIZE VARIES,
SEE MECHANICAL
HAND DRYER, SEE ARCHITECTURE
SQUARE, SIDE OF POLE MOUNTED LUMINAIRES,
TYPE "X", ON CONCRETE BASE WITH POLE
rGEN
SQUARE BOLLARD LUMINAIRES, TYPE "X"
LINEAR LUMINAIRE, TYPE "X", LOWER CASE LETTER
INDICATES SWITCH GROUP. MOUNTING STYLE:
SURFACE, AND RECESSED. SIZE MAY VARY
LUMINAIRE, TYPE "X", LOWER CASE LETTER
INDICATES SWITCH GROUP. MOUNTING STYLE:
SURFACE, SUSPENDED, AND WALL
EXIT SIGN, SINGLE FACE W/ DIRECTING ARROW(S),
TYPE "X". MOUNTING STYLE: BACK, SIDE, AND
CEILING
EXIT SIGN, DOUBLE FACE W/ DIRECTING ARROW(S),
TYPE "X". MOUNTING STYLE: SIDE AND CEILING
EMERGENCY LIGHT, TYPE "X", WITH REMOTE BACKUP
POWER
SWITCH, SINGLE POLE. TYPICAL: LOWER CASE
LETTERS INDICATE SWITCH CONTROL GROUP
SWITCH, MOTION SENSING (AUTO ON)
SWITCH, MOTION SENSING (MANUAL ON) WITH
DIMMING CONTROL
SWITCH, DIMMING CONTROL
SWITCH, TIMER
SWITCH, LOW VOLTAGE COMES WITH SCREEN
SWITCH, LOW VOLTAGE CONTROL FOR PROJECTOR
BOX, SEE SHEET EOO3
OCCUPANCY SENSOR, LINE VOLTAGE, TYPE "X",
LOWER CASE LETTER INDICATES SWITCH GROUP.
MOUNTING: WALL AND CEILING
OCCUPANCY SENSOR, LOW VOLTAGE AND POWER
PACK, TYPE "X", LOWER CASE LETTER INDICATES
SWITCH GROUP. SEE SHEET EOO3, ONE OR MORE
SENSORS DETAIL FOR TYPE INFORMATION
PHOTO CONTROL, TYPE "X", LOWER CASE LETTER
INDICATES SWITCH GROUP
LIGHT HARVESTING DIMMING CONTROLLER, LOWER
CASE LETTER INDICATES SWITCH GROUP(S),
ENSURE COMPATIBILITY WITH CONTROLS, LAMPS,
AND BALLASTS
RECEPTACLE, DUPLEX
RECEPTACLE, DUPLEX, SWITCHED
RECEPTACLE, DUPLEX, MOUNT TO SERVE COUNTER
TOP
RECEPTACLE, GFCI
RECEPTACLE, GFCI WITH WEATHERPROOF COVER
RECEPTACLE, QUAD OR TWO DUPLEX
RECEPTACLE, SURGE PROTECTED DUPLEX
DOWNFEEDING SECOND DUPLEX
RECEPTACLE, 20 AMP, 120 VAC, TWISTLOCK
RECEPTACLE IN FLOOR BOX OF TYPE INDICATED
DATA OUTLET, 2-PORT UNLESS NOTED WITH A
NUMBER WHICH INDICATES DIFFERING NUMBER OF
PORTS
DATA OUTLET IN PROJECTOR BOX INCLUDES LOCAL
DATA LINES, SEE DETAIL SHEET E003
DATA OUTLET IN CABINET INCLUDES LOCAL DATA
LINES, SEE DETAIL SHEET E003
DATA ACCESS HOLES WITH EMPTY CONDUIT AND
PULL LINE BETWEEN, SEE DETAIL SHEET E003
DATA OUTLET, FLOOR MOUNTED
X-#
CIRCUIT TAG: "X" INDICATES PANEL, AND "#" IS THE
CIRCUIT NUMBER
BRANCH CIRCUIT: o - INDICATES GROUND, LONG LINE
- "NEUTRAL" OR "GROUNDED CONDUCTOR" AND THE
SHORT LINE - "HOT" OR "LINE" CONDUCTORS
##" INDICATES UNUSUAL MOUNTING HEIGHT
M
PANEL X
TVSS
FS METER
CT
T
B B
J
J
T
GFCI
X
D
D
X
X
X X
X a
X a
X a
X X X
X X
X
S
S
M
S
MD
S
D
S
T
S
S
S
L
M X a
MD
X a
PC
X a
LS
a
S
C
GFCI
WP
T
P S
S
A
CONSTRUCTION NOTES
1. NOTE LADDER TRAY AND WIRE BASKET CABLE TRAY LOCATIONS AND PENETRATION
LOCATIONS AND PROVIDE SLEEVES AND BLOCKING DURING WALL CONSTRUCTION.
LADDER TRAY IS MOUNTED JUST ABOVE THE EQUIPMENT RACK HEIGHT. THE WIRE
BASKET LOCATIONS SHOWN ARE APPROXIMATE, COORDINATE LOCATION AND MOUNTING
HEIGHTS WITH SPECIFICATIONS AND MECHANICAL. WIRE BASKETS MAY BE BELOW OR
ABOVE MECHANICAL FOR A MAXIMUM OF 48 INCHES BEFORE FULL ACCESS IS PROVIDED
FOR A MINIMUM OF 24 INCHES.
2. COORDINATE UNDER FLOOR LOCATIONS OF POWER CONNECTIONS IN OPEN AREAS
(EXTERIOR WALL CONSTRUCTION AND STRUCTURAL REQUIREMENTS MAY NOT BE
CONDUCIVE TO MULTIPLE CABLES OR LARGE CONDUITS THROUGH WALL), AND FLOOR
RECEPTACLES AND DATA LINES, WITH FEEDING CONDUITS. DATA LINE EMBEDDED
CONDUITS SHALL EITHER BE BROUGHT UP NEAREST WALL TO DISTRIBUTION SYSTEM IN
ATTIC AREA, OR RUN CONTINUOUSLY TO STUB UP IN TELECOMMUNICATIONS ROOM.
3. COORDINATE EQUIPMENT LOCATIONS WITHIN MECHANICAL ROOM TO ALLOW FOR ALL TO
BE INSTALLED. DOOR SECURITY CONTROL EQUIPMENT TO BE INSTALLED WITHIN THE
COMMUNICATIONS ROOM, COORDINATE LOCATION WITH FOREST SERVICE CONTRACTING
OFFICER COMMUNICATIONS REPRESENTATIVE.
PANEL RS SCHEDULE
TYPE: SQUARE D [NQ442L2 INTERIOR, MH38 BOX, NC38FHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 1C, 4#1&1#6GND. FROM PANEL S
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 RECEPT-EAST OPEN OFFICE SOUTH EXTENSION 4 CUBIES 720 QOB120 12 2160 12 QOB120 1440 SWITCHED RECEPT-EAST OPEN OFFICE SOUTH EXTENSION 4 CUBIES 2
RECEPT-SOUTH OPEN OFFICE NORTHWEST 5 CUBIES
900 QOB120
QOB120 1800
SWITCHED RECEPT-SOUTH OPEN OFFICE NORTHWEST 5 CUBIES
5 RECEPT-SOUTH OPEN OFFICE SOUTHWEST 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-SOUTH OPEN OFFICE SOUTHWEST 5 CUBIES 6
7 RECEPT-SOUTH OPEN OFFICE SOUTHEAST 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-SOUTH OPEN OFFICE SOUTHEAST 5 CUBIES 8
9 RECEPT-SOUTH OPEN OFFICE NORTHEAST 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-SOUTH OPEN OFFICE NORTHEAST 5 CUBIES 10
11 RECEPT-SOUTH OPEN OFFICE MIDDLE 4 CUBIES 720
QOB120
12 2160 12
QOB120
1440 SWITCHED RECEPT-SOUTH OPEN OFFICE MIDDLE 4 CUBIES 12
RECEPT-LARGE STORAGE/GENERAL MIDDLE OPEN OFFICE AND
EXTENSION/GENERAL SOUTH OPEN OFFICE/SMALL SOUTH STORAGE
1620 QOB120 12 3060 12 QOB120 1440 SWITCHED RECEPT-SOUTH HUDDLE ROOMS 14
15 RECEPT-SOUTH PRINT ROOM 540 QOB120 12 1080 12 QOB120 540 RECEPT-SOUTH PRINT ROOM 16
17 0 0 18
19 0 0 20
21 0 0 22
23 0 0 24
25 0 0 26
27 0 0 28
29 0 0
31 0 0 32
33 0 0 34
35 0 0 36
37 0 0 38
39 0 0 40
41 0 0 42
LOAD PER PHASE:
(WATTS)
7920 6480 4860
LUMINAIRE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL # LAMPS MOUNTING
Qty
NOTES:
A(E)
2X4 ARCHITECTURAL LITHONIA BLC 2X4 5000LM 80CRI 40K LED RECESSED/CEILING 112
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
B(E)
2X2 ARCHITECTURAL LITHONIA BLC 2X2 3300LM 80CRI 40K LED RECESSED/CEILING 18
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
C(E)
1X4 WRAP AROUND LITHONIA LBL4 4000LM 80CRI 40K MVOLT LED SURFACE/CEILING 26
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
D 2X4 ARCHITECTURAL LITHONIA 2AVL4 50LMDR MVOLT GZ10 LP840 LED RECESSED/CEILING 24
EE CYLINDER GOTHAM EVO CYL 40/10 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 3 WIRE TO SECURITY/EMERGENCY CIRCUIT
F(E)
CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 PM DNA LED PENDANT/CEILING 6
MOUNT BOTTOM AT 10', (E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
FS(E)
CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 FCM DDB LED SURFACE/CEILING 6
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT
FWE CYLINDER GOTHAM EVO CYL 40/30 6AR WD LS MVOLT GZ10 WM DDB LED WALL/CEILING 1 MOUNT BOTTOM AT 10', WIRE TO SECURITY/EMERGENCY CIRCUIT
G(E,1)
DOWN LIGHT JUNO 6RLS G2 10LM 30K 90CRI 120 FRPC WH LED SURFACE/CEILING 5
(E) INDICATES WIRE TO SECURITY/EMERGENCY CIRCUIT (1) INDICATES SEAL TO
CEILING WITH CAULK PER INSTRUCTIONS TO MAKE WET LOCATION RATED
X1 EXIT SIGN LITHONIA LE S 1 G LED SURFACE/BACK/WALL 10 WIRE TO SECURITY/EMERGENCY CIRCUIT
X2 EXIT SIGN LITHONIA LE S 2 G LED
SURFACE/SIDE/WALL
AND SURFACE/CEILING
WIRE TO SECURITY/EMERGENCY CIRCUIT, CEILING MOUNT REQUIRES BRACKET
TO ALLOW FOR DROP CEILING MOUNT
3 LED FLOODLIGHT LITHONIA OVFL LED 2RH 40K 120 PE WH HP17 LED SURFACE/WALL 8
WIRE TO SECURITY/EMERGENCY CIRCUIT WITH MONITORING OF THE LOCAL
CIRCUIT FOR CONTROL OF FIXTURE, REMOVE PHOTO CONTROL
S1 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T3M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 3 SEE DETAIL FOR POLE
S2 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K TFTM MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 2 SEE DETAIL FOR POLE
S3 LED AREA LUMINAIRE LITHONIA CSX1 LED 60C 1000 40K T5M MVOLT SPA DDBXD LED ABOUT 4" ARM ON POLE 4 SEE DETAIL FOR POLE
S4 ROUND BOLLARD LITHONIA KBA8 12C 350 40K ASY MVOLT DDBXD LED CONCRETE PAD 6
S5 LED AREA LUMINAIRE LITHONIA DSX1 LED 30C 530 40K T5W MVOLT MA DDBXD LED
4FT ARM ON SHORT
POLE
SMACU T14 US4 DDB MAST ARM, SEE POLE DETAIL W/ THESE MODS: 12' TALL
POLE, 52" DEEP CONCRETE BASE WITH 48" BELOW GRADE AND ONLY 6 #3 RINGS
TOTAL 241
UNLESS OTHERWISE NOTED, CABLE SUSPENDED AND PENDANT MOUNTED FIXTURES SHALL BE MOUNTED 9' TO THE BOTTOM OF THE
LUMINAIRE.
EXIST SIGNS AND LED FLOODLIGHTS SHALL BE MOUNTED 7'6" TO THE FIXTURE BOTTOM.
SMALL (UNCAPITALIZED) LETTERS ON LUMINAIRES AND CONTROLS INDICATE SWITCHING/DIMMING BANKS OF CONTROLLED FIXTURES.
PANEL R SCHEDULE
TYPE: SQUARE D [NQ442L2 INTERIOR, MH38 BOX, NC38SHR
FRONT, AND PK27GTA GROUND BAR]
120/208 VAC
3 PHASE
A.I.C.: 10,000
FLUSH MOUNT
FEEDER: SZ 2.5C, 4#4/0&1#4GND. FROM PANEL S
CKT LOAD DESCRIPTION
WATT
S
BREAKER
AW
G
LOAD (WATTS)
AW
G
BREAKER
WATT
S
LOAD DESCRIPTION CKT
A B C
1 RECEPT-MIDDLE OPEN OFFICE NORTHWEST 5 CUBIES 900
QOB120
12 2700 12
QOB120
1800 SWITCHED RECEPT-MIDDLE OPEN OFFICE NORTHWEST 5 CUBIES 2
RECEPT-MIDDLE OPEN OFFICE NORTHEAST 4 CUBIES, EXT, AND HALL
900 QOB120 12 2340 12 QOB120 1440 SWITCHED RECEPT-MIDDLE OPEN OFFICE NORTHEAST 4 CUBIES 4
5 RECEPT-MIDDLE OPEN OFFICE NORTH MIDDLE 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-MIDDLE OPEN OFFICE NORTH MIDDLE 5 CUBIES 6
7 RECEPT-MIDDLE OPEN OFFICE SOUTH MIDDLE 4 CUBIES
720 QOB120
QOB120 1440
SWITCHED RECEPT-MIDDLE OPEN OFFICE SOUTH MIDDLE 4 CUBIES
9 RECEPT-MIDDLE OPEN OFFICE EAST 5 CUBIES 900 QOB120 12 2700 12 QOB120 1800 SWITCHED RECEPT-MIDDLE OPEN OFFICE EAST 5 CUBIES 10
RECEPT-MIDDLE 5 SOUTHEAST PRIVATE OFFICES, EXT
1620 QOB120 12 3780 12 QOB120 2160
SWITCHED RECEPT-MIDDLE 5 SOUTHEAST 5 PRIVATE OFFICES/2
MIDDLE EAST HUDDLE ROOMS
13 RECEPT-MIDDLE 3 SOUTHWEST OFFICES/CONFERENCE 1620
QOB120
12 3060 12
QOB120
1440 SWITCHED RECEPT-MIDDLE 2 SOUTHWEST OFFICES/CONFERENCE 14
15 RECEPT-MIDDLE 2 NORTH OFFICES/EXTERIOR 1620 QOB120 12 3060 12 QOB120 1440 SWITCHED RECEPT-MIDDLE NORTH EAST OFFICE/MID CONFERENCE 16
17 RECEPT-MID PRINT-FILE/2 MID STORAGE/2 MID HALL EAST/FIRE RISER 1620 QOB120 12 3060 12 QOB120 1440 RECEPT-MECHANICAL/MAIN RESTROOMS/JANITOR/2MID HALL & DRINK 18
19 RECEPT-MID OPEN OFFICE BREAK SINK LEFT SIDE 180
QOB120
12 360 12
QOB120
180 RECEPT-MID OPEN OFFICE BREAK SINK RIGHT SIDE 20
21 RECEPT-MAIN CONFERENCE SOUTH AND FLOOR/HALL 1620 QOB120 12 2700 12 QOB120 1080 RECEPT-MAIN CONFERENCE NORTH AND CEILING 22
23 RECEPT-MIDDLE BREAK AREA COUNTER LEFT SIDE 180 QOB120 12 360 12 QOB120 180 RECEPT-MIDDLE BREAK AREA COUNTER RIGHT SIDE 24
25 RECEPT-LOBBY SOUTH AND RECEPTION 1260
QOB120
12 1440 12
QOB120
180 RECEPT-MAIN CONFERENCE BREAK COUNTER RIGHT 26
27 HAND DRYER- MENS MAIN 2000 QOB120 12 2000 28
29 HAND DRYER- WOMENS MAIN 2000 QOB120 12 2000 30
PANEL T
QOB250 6
900 12 QOB120 180 RECEPT-MAIN CONFERENCE BREAK COUNTER LEFT 32
33 2720 2720 34
35 2360 6210
QOB240
ELECTRIC VEHICLE CHARGING STATION
37 RECEPT-MAILROOM 1080 QOB120 12 4930 3850 38
39 0 1500
10 Q0B220
ELECTRIC SLIDING GATE
41 0 1500 1500 42
LOAD PER PHASE:
(WATTS)
15550 17020 19610
LOAD CALCULATIONS
DEMAND PHASE A PHASE B PHASE C
PANEL M @100% 20,128 17,420 15,193
PANEL L @100% 3,175 2,985 4,910
LOADING FROM BELOW 17,092 17,205 17,842
PANEL T @100% 720 2,985 2,360
TOTAL 41,115 40,595 40,305
MAXIMUM AMPERAGE DRAW 339 AMPS
RECEPTACLE (INCLUDES OTHERS) LOADING CALCULATIONS
PANEL R 15,550 17,020 19,610
MINUS PANEL T -720 -2,720 -2,360
PANEL RN 8,100 10,296 10,240
PANEL RS 7,920 6,480 4,860
TOTAL 30,850 21,076 32,350
1ST 10,000 @ 100% 3,333 3,333 3,333
REMAINDER @50% 13,759 13,872 14,509
TOTAL RECEPTACLE 17,092 17,205 17,842
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 1/1
:3 7 S
AB
RO
W N
X:
\D
IX
IE
\D
IX
IE
.S
UP
ER
VI
SO
RS
.D
IS
TR
IC
T.
\D W
G\
DI
XI
ES
OE
LE
CG
EN
ER
AL
.D W
G;
REGION 4
INTERMOUNTAIN REGION
DIXIE NF
SUPERVISOR'S
AND CEDAR CITY
RANGER
DISTRICT OFFICE
DIXIE NATIONAL FOREST
DISTRICT NAME
ELECTRICAL LEGEND,
NOTES AND PANEL
SCHEDULES
S.BROWN
S.BROWN
D.JEPPSEN
E001 96 105
Approved:
1284N819R0002 0001 Page 9 of 18
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E shillworthen Typewritten Text David Jeppsen 4/23/19
Dixie SO Prebid 612612019
4oo^ L.4o.,,n
Gxa*l &tly6."{L
A,u. ll-u¿
/u,-ì. ^tn l \ f*11 zs',nert¿./
..)o/,r, S+^lÅ.o
\ \rut-ôì tS* ì>a¡.r fÂx.
l.loe¿n sÀçr^as¿, /V^f /(or/,'> l/"^ llo'^"t's
Sreveñ Ðñrrt- FYrtt+ g¿xs,ø Çfteur+ H(ttnvop-TttF
Name
I
C( ¿"-4. c urz
/\nrtcçroo &ruqt¡cr*ox llø,vr* h**tvtt-vø,J
J 4"1 Cir-n k- ït-f F -î^.,a
SaiÅlçron,ú LtL l)r:'*¡".,.l MArm¡,rmnr (,,.<
Fs -(o usDA -FS - D¡ xi t \)âìÞ\ -Fs -DrxrÉ utDA-F> I USDft re Orginazation qB S- gîo-,Fts aoz - 881 -ÁÇ00
AZe * 69tr_zizL
7ø7 - 7lz-- Sl"ty'
43S-510 -Zbq6 ful-7? t-êqs7
Ð"sso"qur"!
Q"l #4 çç?s Zo9 37s Vl¿é
*r-t6ç-3?? j ,l*s- 23b -ob2.ì æl- 629-5?.Þg
Ðo t- 0;.t-7à-? 7
Phone æ¡e't @ c (cø¡.*...rc
LR,
sbosqpE@.ffi" vu
WcQli¿læþ-ed'\
*oo./*n¡- OîêS-."/,, b^ftìeï bcos ê,& ¡ ¡Écrne
)e|r¡.'@€* rcrPqLl-
,ìutt@rfsÒl,dn.cr,, Þtt¡re¿"C¡x (- ÞovsÀ¡ó,òu&gp.c¿f\ hil^lÅgPutúv+ Qrl4+r,-]"ct- lcprt n"rr/ytrf,|{.:P o/"n lrt,us@u.t.g*
5tt¡rtYr . Orr'c-ì\ Queo*'Got
R-*¿¡rÉ,-oc¿Ø*^r^, ç le / le y, ¡ ¡: / /-yvorrt<, ?- us?o-' îâ v
Toà Sra?
P.'u"e áug w ãla
:,nw& frf rr** (bv",t
,àwl ?¿rnns
Mha."e
Fs n+
F.5.
7 Fq.
Prime/Sub
[..fi"/on l]/r¡
Døøo ¡ F¡e*t¡-rCt
6(ffi'b't*¿-T' t lf Sub, Speciality
1284N819R0002 0001 Page 10 of 18
Dixie SO Prebid 612612019 f
"''âÉ úsxrs,xl
4n^, 'lrr"f( ,ffa/a{tuo**- N"l r'/l^o,rrc forr ûJown
Selk frrtrd",fh Name
41 €wLTWc-
ÊII-dò^ G*.f t\ tl
Ú"¿r* {ó62{,fu/
¡ÁAest/-+{L tFSII¿ItlGL
Vøçço ên^o.4. 't*sÐee1
Pnc¿ P/rar," Ønr
(tuVØffire Erørrdr,<
Orginazation^
4% -5?0 *ú,12fr
102- 511- 3êoø t\ lLlx lsl t377 t/ frf-qéfZfâz
4bf -667"otLL{ ttz r-6îí- 6)2 %"rs^277--t241
[oz-?oß -t36Ò
4çr -rtûe 4z// Phone
(vøû Él)waarq
$æ¡a6er+t1¿r6^ L.AtrrÀl^ /'Å êçw,t fuc¡uhrn^,'*li^-'io, , /a/ê¿ueAa¿¿n
¡øt Ctit4ttgtt*ttsebtw\ Cor''\ lcl,cruroþd e¿r¿?
Øp¿c-ño,-- ¿- 4¿D'sz
Twow@ Ptænar
Vlz@a'yøfrieeKøq Email
9d_B -l¿ut lct\-*e il.þs+d, ëøe ¿"ry
11-, €ttru stJ6
I SqÇ þ-¡ø¿ ccs¿o.con ftatæ lêt þr¿
,.r, ?ub (a>-t
Prime/Sub
It'æ-vrzrxa çra< ç íqb,t/îaltù lf Sub, Speciality
1284N819R0002 0001 Page 11 of 18
1. This is due on July 15, which is a Monday. Since a hard copy must be mailed, that means we will have to mail it Friday, July 12. Can this be pushed back one day to give us more time to finalize numbers with our subs? Or can the proposal be emailed with a hard copy sent and postmarked by COB of July 15?
• Changed date to the 17th, Wednesday. Email or mail (on thumb drive) a complete copy to Matt Morris due by closing date listed in Block 13 on SF1442.
• Mail (postmarked by the 17th) or hand deliver Technical proposal to Steven ONeil
2. Page 1 of the RFP says we must include at a minimum Standard Form 1413. Typically we submit these once the subcontractors are in contract with the general. Can these be submitted if awarded?
• Either provide a 1413 with contractor’s information or provide a list of all contractors you have/working with on a proposal. Provide
3. Factor 1 states, “If subcontractors are to be used, each subcontractor’s information used for this contract must be included.” Does this mean that if we use subcontractors to demonstrate that we meet qualifications OR does that mean if we use subcontractors on the project?
• We want to see any subcontractors you are going to use to complete you team. If you are talking to three subs for one specialty, provide a list of the three and give information on you preferred selection (based on best value) Provide Information on preferred selection.
4. Factor 2 also asks for subcontractors’ recent experience. Since we are limited to 60 pages and since Factor 1 and 2 both ask for subcontractors’ experience, please advise.
• Subcontractor’s will be included in the 60,
5. Factor 3 asks for a project-specific quality control plan. A project-specific quality control plan will easily take up half of the page count. Can this please be excluded from the page count?
• Add as appendix to Tech proposal
6. Factor 5 asks for our safety plan. Does this need to be project-specific? If yes, can this be excluded from the page count because it will take over half of the page count?
• Add as appendix to Tech proposal
7. There is no spec provided for the type X emergency light fixtures on the plans. Will a generic spec be acceptable?
• There are no unidentified fixtures of type “X.” There are types “X1,” “X2,” “3,” and other Exit and Emergency lights that are defined in the Luminaire schedule.
8. Under Factor 4 – Past Performance on page 38, it says to include “projects completed within the last five (5) years.” However, in the paragraph under the list of features of work on the same page, it says, “experience within the last three (3) years.” Can we include projects within the last 5 years? For key personnel, we are asked about the past 5 years, so it would be helpful to be able to link our past performance projects to our key personnel.
• Changed the 3 to a five
9. Some contracting officers won’t complete past performance questionnaires if a CPAR exists. Can we submit a CPAR in lieu of a questionnaire?
• Yes CPARS can be submitted in lieu of questionnaires in the Technical proposal
10. Can we submit questionnaires that contracting officers completed for other previously submitted proposals?
1284N819R0002 0001 Page 12 of 18
• Yes, as long as POCs contact information is included
11. The solicitation gives Offerors the option to either email electronic copies of their proposals or provide the same on USB drives.
• Correct, Email me the complete proposal by the due date and time, matthew.morris@usda.gov , or mail USB drive due by closing.
12. Question: If Offerors elect to email the electronic copies, to whom should this transmission be addressed? matthew.morris@usda.gov
13. Question: Please provide any attachment file size limitations that are applied to USDA email communications.
• At least 25MB
14. Question: In order to provide the government with the lowest competitive pricing, would it be acceptable for Offerors to leave the bid schedule and WBS section blank in the hardcopies and include this information in the electronic copies that will be emailed or placed on USB drives?
• Yes, they should only be submitted electronically. No paper copy
15. Question: Since Sections of the solicitation package are included elsewhere in the proposal (Section A, Section B, Section K), and other Sections are informative only, what exactly are Offerors to provide to satisfy “(i) 1 copy of the completed, signed offer (Sections A through K of the solicitation package)?”
• See attached changed page. All information to me, paper copy of Technical proposal to Steve O’Neil
16. 452.215-71 Instructions for the Preparation of Technical and Business Proposals, Key Personnel directs Offerors to include to include resumes for site superintendent and the QC Officer to be assigned to the job, along with an alternate for each.
• See changed page attached.
17. However, Section H-3 Site Superintendent states that the site superintendent shall be responsible for onsite quality control.
• Superintendent and QC can be the same person
18. Question: Please confirm that the superintendent and QC officer resumes can be combined in our proposal submission, i.e. one resume for “Site Superintendent/QC Officer” + one resume for an alternate.
• If same person, only one resume required
19. Concerning the request for product substitution for the lockers and toilet partitions for the
Dixie Supervisor’s Office project. Could you provide a response as follows:
• The Forest Service does not provide preapproved substitutions for construction contracts. Any product meeting the technical requirements of 101550, Toilet Partitions and Section 105113, Metal Lockers will be considered as submitted by the successful bidder.
20. Can current projects that are at least 75% complete be provided to document recent, relevant experience under Factor 4?
• Yes, nearly complete projects can be included
21. Government clients are often reluctant to complete new Past Performance Questionnaires
(PPQ) for projects that either have a final government-provided CPARS or CCASS evaluations, or for projects that already had PPQs completed that were returned to the Offeror. Is it acceptable for Offerors to include previously completed PPQs in their
1284N819R0002 0001 Page 13 of 18 proposals in lieu of obtaining new PPQs? Is it acceptable to include final CPARS or CCASS evaluations in the proposal in lieu of obtaining new PPQs?
• If a project is in CPARS, provide a list or actual reports of relevant projects with technical proposal. Not included in 60 page account, include at appendix
22. Federal solicitations typically request Offerors to provide Past Experience documentation as evidence they have completed recent and relevant work, and Past Performance documentation (PPQs, CPARS, CCASS) as evidence of how well they performed on the projects. The solicitation is somewhat unclear as to how Offerors are to present their five projects in the proposal under Factor 4.
1. Please confirm that Offerors are to provide five past experience projects in Attachment 12 format in the proposal, and that a copy of Attachment 12 will be sent to their references, who will evaluate the Offeror’s performance and return the evaluation directly to USDA.
• If you have 5 projects in CPARS, provide a list or include the 5 reports as an appendix. If you do not have at least 5 relevant projects in CPARS, previously completed questionnaires, or have a project you want included, then send attachment 12 to your customer to complete and send back to me.