Amendment 3 4-21-2020.pdf
PDF 2 MB Posted
- Solicitation number
- 12837120Q0050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 4 4-28-2020.pdf | ||
| 12837120Q0050 Amendment 1.pdf | ||
| 12837120Q0050 - Amendment 2.pdf | ||
| Davis Bacon Act WD AZ20200030.docx | DOCX document | |
| 12837120Q0050 Solicitation package.pdf | ||
| 1283712Q0050 Return Bid Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12837120Q0050 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
SPRINGERVILLE AZ 85938
30 S CHIRICAHUA DR
PO BOX 640
APACHE SITGREAVES NATIONAL FOREST
USDA FOREST SERVICE
99360804/21/2020
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation and/or as amended by one of the following methods: by completing items 8 and 15 and completing the revised schedule attached to this amendment.
Offers may be sent by email to: michelle.l.bahr@usda.gov
Delivery: 11/30/2020
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12837120Q0050
Delivery Location Code: 8167
USDA FOREST SERVICE
COCONINO NATIONAL FOREST SO
1824 S THOMPSON ST
FLAGSTAFF AZ 86004 US
0001 2020 - KAIBAB NF TUSAYAN RD, PUMPHOUSE
IMPROVEMENTS - The intent of the project will be to replace the existing pumping system including all the plumping, pumps, controls, and the rotary phase converter with a more efficient system.
The current system shall be evaluated with a minimum recommendation of two options including costs. The government will review and approve the selected option for installation to replace the existing system.
This solicitation is here by amended to:
1.) Answers to clarifying questions. See the included in this document: "Clarifying Questions
Tusayan RS Pump House-response"
2.) Valve Photos-included below
3.) SOW update
4.) Solicitation Closing has been extended to:
May 7, 2020, 4:00 p.m. Arizona Time
All other terms and conditions remain the same.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
21 April 2020
To: USFS Tusayan Ranger Station: Pump House Improvements
Clarifying Questions Tusayan RS Pump House-response
Subject: Client Questions – FS answered questions on 04/14/2020.
1. From an engineering stand point what is USFS’ ultimate objective of the pump house improvements? For example we would like to increase rate of water moving capability, would like to keep same supply time but with single pump, we would like to update the electrical controls such as VFD, increase equipment reliability or life-span of equipment or reduce long-term maintenance requirements, etc? Answered.
2. Are there any current issues or shortfalls in the pump house or water distribution system that the USFS would like to have repaired or improved? Answered. What does the USFS dislike about the current pump house operations or configurations? The building is small and the controls should be placed such that the operator/water deliverer can easily reach with clear approach the pump start controls. The shut off valves and priming valves to the pumps should also be easily accessed with clear approach.
3. If the sky is the limit, what improvements would the USFS for its pump house? This is not in the contract, but a larger building slightly farther from the existing roadway would be desired.
4. At a minimum, what pump house improvements the USFS would like accomplished? This is included in the specifications.
5. Is there an established budget for the project? The solicitation provides this information.
6. Can we get better photos of the valve boxes? Such as downward looking of the valves and boxes? A photo was submitted and will be provided, but the valve is too deep and can’t be seen.
The valve is approximately four (4) feet below grade.
7. We know it can get cold on the South Rim, Is there risk of freezing for the pump house and water distribution system? In the recent past have you suffered freeze damage? Answered.
8. What was the cause of the last disruption to the water distribution system or the pump house equipment? Answered.
9. When is the last time the water distribution has been check for leakage or water loss?
Answered.
10. What is the O.D. and I.D. of the distribution lines that run to 4’ Valves? Answered.
11. Are there any issues with the 4’ values and value boxes (OB1 & OB2)? Are the values currently operational? What is the mechanical condition of the values? What is the last time they have been exercised? All parts answered.
12. Are the values (OB1 & OB2) flange connections? Are current boxes steel or concrete?
Answered.
13. Would the USFS be interested in value installation that would minimize water disruption to less than four hours? A New Gate Valve is installed inline in 2-4 hours, LIVE, "without interruption" of the Service main. Shut the valve when you are ready, it operates just like a Regular Valve with a
Standard Valve Key. Available for: ACP, C-900 PVC, DUCTILE IRON, CAST IRON, PVC and STEEL.
Answered.
14. Do you have a valve type preference? Answered.
15. What is the life span the USFS would like out of the new pump house equipment? Answered.
16. What is the annual run time for the pump house? Answered.
17. What is the material of the water distribution lines: ACP, C-900 PVC, DUCTILE IRON, CAST IRON, PVC and STEEL? (This is an important question.) Answered.
18. Can the install of values if optioned be performed independent of the pump house upgrade? For example, using new procedures we could install valves without disrupting service within a two-day period and not tied to pump station work. The pump station upgrade work would maintain the seven-day time schedule. Yes.
19. When is it estimated the job will be awarded? When does the USFS want to commence work?
The FS would like to schedule the work to start in October.
20. Or: What is the timeframe the USFS would like the pump house upgrade accomplished? The pump house upgrade is the critical part and shall be completed as described in the specifications.
21. What specific improvements are requested with access? Control panel to be next to hose connection, cabinets relocated for better access inside, etc.? Clear approach to shut off valves to pumps and priming valves. Clear approach to start/stop button for pump controls.
22. From the photos it looks like it is a single unload line. Does the USFS desire ability to unload two trucks at one time? No. Or the ability to hook up two trucks at once, unload first truck than be able to immediately move to unload the second truck? No.
23. Does the USFS desire automatic or programmed unmanned unloading? No. How about secure controls outside of pump house or remote controls? If there is a benefit – this may be considered, but uncertain of your question – secure controls to building or equipment?
24. If that some of the equipment will have to be manufactured can the USFS extend the period after the notice to proceed to accommodate this constraint? This can be considered if majority of proposals are identifying the same issue.
25. Is the site visit still going to happen on the 17th despite isolation orders across the country? The site visit is as scheduled. Your representative is expected to keep the physical separation and encouraged to bring face mask, sanitizer, or disinfection wipes.
26. If we can increase the HP on pump to keep the same or increase GPM output would operating in a single pump be acceptable? The second pump, which would a twin, would serve as back up or alternative or could be used to unload two trucks? The FS would rather operate two pumps to even the wear on each pump. They can operate alternately if one pump is capable to unload the water in a shorter delivery time.
27. Is FS hard fast on operating two pumps during unloading? Is FS ok with using one pump with better out put? Yes, it is acceptable for one pump to complete a delivery. Two pumps shall be provided and installed and designed to operate alternately if the design is for one pump operation.
28. From your previous answers I take away that speed of unload or improvement in unload capacity is the critical engineering factor. Is this correct? Yes.
29. What is you second desired improvement requirement? Replacing the pump controls to provide a safe manual operation for the water provider with easy to read information. (ie. water level in tank (ft) and water meter to measure water delivered).
Thank you for your complete answers. This we help us understand your needs and requirements.
Also, there responses we help us with technical issues.
TUSAYAN RS PUMP HOUSE SOL #12837120Q0050
KAIBAB NATIONAL FOREST
VALVE PHOTOS
PHOTO 1: VIEW OF 4-INCH VALVE IN OPTIONAL BID. VALVE IS TOO DEEP.
PHOTO 2: VIEW OF SERIES OF VALVES.
THE VALVE IN CONTRACT IS WITH LID
REMOVED.
KAIBAB NATIONAL FOREST
TUSAYAN RANGER DISTRICT
AMENDMENT 03
FOR
TUSAYAN RANGER STATION
2020 – PUMPHOUSE IMPROVEMENTS
REPLACEMENT OF PUMPS, PLUMBING AND PUMP CONTROLS
CLARIFICATIONS / QUESTIONS:
A. Schedule of Work –
a. Base Bid – Work shall be completely installed and operating within 7 days to return the system to normal operations. Contractor shall schedule work in coordination with the Forest Service and the Grand Canyon National Park Service. This will optimize the available time to complete all the work.
b. Optional Bid items, if awarded, may be scheduled outside (before or after) the base bid one (1) week scheduled work.
B. Task 2: Pumphouse Improvements The work for this task consists of the following:
1) Evaluate the current system and submit a minimum of ONE best recommended option to the Forest Service including costs.
C. New Components, Section J, Testing:
All new installations such as the new 4-inch fittings, the new and/or repaired sections shall follow the Preventive Measures During Construction. The interior of the new components and fittings should be cleaned and swabbed, as necessary, with a 5 percent hypochlorite disinfecting solution in accordance with Arizona Department Environmental Quality, Engineering Bulletin No 8.
D. New Components, Section B, Plumbing:
The connection where GCNP connects to unload the water shall remain the same size.
The existing connection is a quick connect (cam and groove) three (3) – inch with proper plug.
E. Question was asked about depth of waterline – The waterlines are at least 36-inches to 48-inches deep.
F. Question – Does Forest Service have a specific time frame for the work to start? Yes, the work shall start mid-October or early November.
G. New Valve location for OB-2A – Please see attached map. The previous location was outside of the pumphouse.
EXISTING VALVE
OB-2A
OB-2B
OB-1
NEW VALVE INSTALLATION
OB-2A LOCATION WILL
CHANGE CLOSER TO
LOCATION OB-2B.
PREVIOUS LOCATION WAS
NEAR THE PUMPHOUSE.
| 12837120Q0050.pdf |
| 20200424 Questions Tusayan RS Pump House V.30-response.pdf |