Fillable_Schedule_Shoshone_Rds_IDIQ_Rev2.xlsx
XLSX spreadsheet 90 KB Posted
- Attached to
- Shoshone National Forest Roads IDIQ
- Solicitation number
- 1282BH19R0005
About this file
Fillable_Schedule_Shoshone_Rds_IDIQ_Rev2
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SECTION B - SCHEDULE OF ITEMS Rev 2 |
| Shoshone National Forest Roads |
The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be included in a task order. See General Notes – Mobilization Pay Items
| ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wide | |||||||||||
| Item No. | Description | Estimated Quantity | Method of Meas. | Unit | Zones Bid | Base Year Unit Price | Option Year (1) Unit Price | Option Year (2) Unit Price | Option Year (3) Unit Price | Option Year (4) Unit Price | Base Year Total Price |
| 151(01) | Mobilization of motor grader, Cat 140, JD770D, or equivalent from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(02) | Mobilization of backhoe/loader, Cat 416E , JD 310G, or equiv., 4-wheel drive, with extendable stick from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(03) | Mobilization of dozer, Cat D-4K2, Case 750M, Deere 550K, or equiv., w/tilt blade from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(04) | Mobilization of dozer, Cat D-5K2, Case 850M, Deere 650K, or equiv., w/tilt blade from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(05) | Mobilization of dozer, Cat D-6K2, Case 1150M, Deere 700K, or equiv., w/tilt blade from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(06) | Mobilization of track-mounted excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ thumb attachment from base of operation (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(07) | Mobilization of skid steer, Bobcat S220 or equivalent from base of operations. (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(08) | Mobilization of wheel loader, John Deere 544, Cat 950, or equiv. from base of operations. (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(09) | Mobilization of Dump Truck, 10 C.Y. from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(10) | Mobilization of compactor, vibratory steel wheel, 8 ton minimum, from base of operations (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(11) | Mobilization of water tender, 4,000 gallon pressurized; w/ operator. 8 hour minimum per job | 1 | CQ | Mile | $ - 0 | ||||||
| 151(12) | Mobilization of mini-excavator, Cat 303 5C or equiv. w/ thumb attachment from base. (one time per job) | 1 | CQ | Mile | $ - 0 | ||||||
| 151(20) | Bonding, Task Order above $35,000 | Per Task Orders >$35k | % | Each | $ - 0 | ||||||
| 152(01) | Construction Survey and Staking | Per Task Order if applicable | CQ | LS | $ - 0 | ||||||
| 157(01) | Soil Erosion Control, Silt Fence or Wattles | 1 | CQ | Foot | $ - 0 | ||||||
| 157(02) | Sediment Basin | 1 | CQ | Each | $ - 0 | ||||||
| 201(01) | Clearing & Grubbing | Per Task Order if applicable | CQ | Acre | $ - 0 | ||||||
| 202(55)A | Removal & disposal of trees – dia. Less than 24”, disposal method “f”, Scattering | 1 | CQ | Each | $ - 0 | ||||||
| 202(55)B | Removal & disposal of trees – dia. 24” or greater, disposal method “f”, Scattering | 1 | CQ | Each | $ - 0 | ||||||
| 203(01)A | Removal of Existing Culverts, 12”-24”, disposal method “f”, Remove from Project | 1 | CQ | Each | $ - 0 | ||||||
| 203(01)B | Removal of Existing Culverts, greater than 24”, disposal method “a”, Remove from Project | 1 | CQ | Each | $ - 0 | ||||||
| 204(01) | Roadway Excavation, compaction method “d”, finishing method “d” | 1 | CQ | CY | $ - 0 | ||||||
| 204(02) | Load and Haul Excavated Material | 1 | CQ | CY-Mile | $ - 0 | ||||||
| 204(20)A | Drainage Excavation, Type Rolling Dip Construct | 1 | CQ | Each | $ - 0 | ||||||
| 204(20)B | Drainage Excavation, Type Rolling Dip Reconstruct | 1 | CQ | Each | $ - 0 | ||||||
| 204(20)C | Drainage Excavation, Type Inlet/Outlet Ditch | 1 | CQ | Foot | $ - 0 | ||||||
| 204(24) | Haul | 1 | CQ | Ton-Mile | $ - 0 | ||||||
| 207(01) | Geotextile, type, <fill in> | Per Task Order if applicable | CQ | SY | $ - 0 | ||||||
| 211(03)A | Roadway Obliteration, Method 1 | Per Task Order if applicable | CQ | Mile | $ - 0 | ||||||
| 211(03)B | Roadway Obliteration, Method 2 | 1 | CQ | Mile | $ - 0 | ||||||
| 211(03)C | Roadway Obliteration, Method 3 | 1 | CQ | Mile | $ - 0 | ||||||
| 212(01)C | Linear grading, Construction of Road | Per Task Order if applicable | CQ | Mile | $ - 0 | ||||||
| 212(02)R | Linear grading, Reconstruction of Road | Per Task Order if applicable | CQ | Mile | $ - 0 | ||||||
| 230(01)A | Roadside Brushing, Both Sides Heavy Vegetation | Per Task Order if applicable | CQ | Mile | $ - 0 | ||||||
| 230(01)B | Roadside Brushing, Both Sides Moderate Vegetation | 1 | CQ | Mile | $ - 0 | ||||||
| 230(01)C | Roadside Brushing, Both Sides Light Vegetation | 1 | CQ | Mile | $ - 0 | ||||||
| 230(02)A | Roadside Brushing, One Side Heavy Vegetation | Per Task Order if applicable | CQ | Mile | $ - 0 | ||||||
| 230(02)B | Roadside Brushing, One Side Moderate Vegetation | 1 | CQ | Mile | $ - 0 | ||||||
| 230(02)C | Roadside Brushing, One Side Light Vegetation | 1 | CQ | Mile | $ - 0 | ||||||
| 251(02)A | Placed Rip Rap, Class 2 (D50 = 6”) | 15 | CQ | Ton | $ - 0 | ||||||
| 251(02)B | Placed Rip Rap, Class 3 (D50 = 10”) | 15 | CQ | Ton | $ - 0 | ||||||
| 251(02)C | Placed Rip Rap, Class 6 (D50 = 22”) | 15 | CQ | Ton | $ - 0 | ||||||
| 251(02)D | Placed Rip Rap, Class 9 (D50 = 36”) | 15 | CQ | Ton | $ - 0 | ||||||
| 258(01) | Retaining Wall | Per Task Order if applicable | CQ | SF Face | $ - 0 | ||||||
| 301(01)A | Aggregate base placement, grading U, Government Furnished Material, compaction method “A” | 15 | CQ | Ton | $ - 0 | ||||||
| 301(01)B | Aggregate base placement, grading U, Government Furnished Material, compaction method “B” – vibratory roller | 15 | CQ | Ton | $ - 0 | ||||||
| 301(01)C | Aggregate base, grading U, compaction method “A” | 15 | CQ | Ton | $ - 0 | ||||||
| 301(01)D | Aggregate base, grading U, compaction method “B” – vibratory roller | 15 | CQ | Ton | $ - 0 | ||||||
| 301(01)E | Aggregate base, grading O, compaction method “A” | 15 | CQ | Ton | $ - 0 | ||||||
| 301(01)F | Aggregate base, grading O, compaction method “B” – vibratory roller | 15 | CQ | Ton | $ - 0 | ||||||
| 301(15) | Aggregate surface course, Type Pit Run, compaction method “A” | 15 | CQ | Ton | $ - 0 | ||||||
| 303(01) | Roadway Reconditioning, Level 1 and 2 roads. | 1 | CQ | Mile | $ - 0 | ||||||
| 303(02) | Roadway Reconditioning, Level 3 and 4 roads. | 1 | CQ | Mile | $ - 0 | ||||||
| 312(01) | Dust Palliative, Type Magnesium Chloride | 1 | CQ | Mile | $ - 0 | ||||||
| 602(01)A | 18-inch 16 gauge diameter corrugated metal pipe, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(01)B | 24-inch diameter 16 gauge corrugated metal pipe, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(01)C | 36-inch diameter 16 gauge corrugated metal pipe, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(01)D | 48-inch diameter 16 gauge corrugated metal pipe, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(01)E | 60-inch diameter 12 gauge corrugated metal pipe, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(01)F | 72-inch diameter 10 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(02)A | 21” span, 15” rise 16 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(02)B | 28” span, 20” rise 16 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(02)C | 35” span, 24” rise 16 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(02)D | 42” span, 29” rise 16 gauge corrugated metal pipe, compaction method “f” | CQ | LF | CQ | $ - 0 | ||||||
| 602(02)E | 49” span, 33” rise 16 gauge corrugated metal pipe, compaction method “f” | CQ | LF | CQ | $ - 0 | ||||||
| 602(02)F | 57” span, 38” rise 16 gauge corrugated metal pipe, compaction method “f” | CQ | LF | CQ | $ - 0 | ||||||
| 602(02)G | 71” span, 47” rise 12 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(02)H | 83” span, 57” rise 10 gauge corrugated metal pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(03)A | 14-inch rise, 23-inch span Class 3 reinforced concrete pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(03)B | 29-inch rise, 45-inch span Class 3 reinforced concrete pipe, compaction method “f” | Per Task Order if applicable | CQ | LF | $ - 0 | ||||||
| 602(04)A | Transport and Install 18-inch diameter corrugated metal pipe, Government Furnished, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(04)B | Transport and Install 24-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(04)C | Transport and Install 36-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(04)D | Transport and Install 48-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(04)E | Transport and Install 60-inch diameter 12 gauge corrugated metal pipe, Government Furnished, compaction method “f” | 1 | CQ | LF | $ - 0 | ||||||
| 602(05)A | Furnish and Install end section for 18” pipe culvert | 1 | CQ | Each | $ - 0 | ||||||
| 602(06)A | Furnish and Install end section for 24” pipe culvert | 1 | CQ | Each | $ - 0 | ||||||
| 602(07)A | Furnish and Install end section for 21” span, 15” rise pipe arch culvert | Per Task Order if applicable | CQ | Each | $ - 0 | ||||||
| 602(07)B | Furnish and Install end section for 28” span, 20” rise pipe arch culvert | Per Task Order if applicable | CQ | Each | $ - 0 | ||||||
| 602(07)C | Furnish and Install end section for 35” span, 24” rise pipe arch culvert | Per Task Order if applicable | CQ | Each | $ - 0 | ||||||
| 602(07)D | Furnish and Install end section for 42” span, 29” rise pipe arch culvert | Per Task Order if applicable | CQ | Each | $ - 0 | ||||||
| 605(08)A | Granular Backfill, AASHTO M 43 Size #56 (1” to 3/8”), washed | 15 | CQ | Ton | $ - 0 | ||||||
| 605(08)B | Granular Backfill, AASHTO M 43 Size #1 (3 ½” to 1 ½”), washed | 15 | CQ | Ton | $ - 0 | ||||||
| 619(01) | Furnish and Install Fence, type barbed wire | 1 | CQ | Foot | $ - 0 | ||||||
| 619(02) | Furnish and Install Gate, type barbed wire, size 16’ wide | 1 | CQ | Each | $ - 0 | ||||||
| 619(02)A | Transport and Install Government Furnished 16’ Type 1 Gate | 1 | CQ | Each | $ - 0 | ||||||
| 619(02)B | Furnish and Install 16’ Type 1 Gate | 1 | CQ | Each | $ - 0 | ||||||
| 619(03) | Transport and Install Government Furnished 16’ Type 2 Gate | 1 | CQ | Each | $ - 0 | ||||||
| 619(04) | Furnish and Install 16’ Type 2 Gate | 1 | CQ | Each | $ - 0 | ||||||
| 619(06) | Transport and Install Government furnished 16’ Cattleguard | 1 | CQ | Each | $ - 0 | ||||||
| 619(07) | Furnish and Install 16’ Cattleguard | 1 | CQ | Each | $ - 0 | ||||||
| 622(01) | Motor Grader, Cat 140, JD770D, or equivalent; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(02) | Backhoe/Loader, Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(03) | Crawler Dozer, Cat D-4K2, Case 750M, Deere 550K, or equivalent, w/ tilt blade; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(04) | Crawler Dozer, Cat D-5K2, Case 850M, Deere 650K, or equivalent, w/ tilt blade; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(05) | Crawler Dozer, Cat D-6K2, Case 1150M, Deere 700K, or equivalent, w/ tilt blade; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(06) | Track Mounted Excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ thumb attachment; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(07) | Track Mounted Excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ rock hammer attachment; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(08) | Wheel Loader, John Deere 544, Cat 950, or equivalent, with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(09) | Mini-excavator, Cat 303 5C or equiv. w/ thumb attachment; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(10) | Skid steer, Bobcat S220 or equivalent; with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 622(11) | Compactor, vibratory steel wheel, 8 Ton Minimum | 1 | CQ | Hour | $ - 0 | ||||||
| 622(12) | Dump Truck, 10 C.Y. with operator | 1 | CQ | Hour | $ - 0 | ||||||
| 623(01)A | General Labor | 1 | CQ | Hour | $ - 0 | ||||||
| 623(01)C | Mobile Welder w/operator | 1 | CQ | Hour | $ - 0 | ||||||
| 625(01) | Seeding, Dry Method | 1 | CQ | Acre | $ - 0 | ||||||
| 633(10) | Remove Sign (includes disposal of sign off Government property) | 1 | CQ | Each | $ - 0 | ||||||
| 633(90)A | Install Single Post Sign (4"x4" post) - Government Furnished Sign | 1 | CQ | Each | $ - 0 | ||||||
| 633(90)B | Install Double Post Sign (4"x4" posts) - Government Furnished Sign | 1 | CQ | Each | $ - 0 | ||||||
| 633(90)C | Install Carsonite Sign, Government Furnished Sign | 1 | CQ | Each | $ - 0 | ||||||
| 648(04) | Place Streambed Simulation Rock, Placement method <fill in> | Per Task Order if applicable | CQ | CY | $ - 0 | ||||||
| 802(01) | Ditch Cleaning | 1 | CQ | Mile | $ - 0 | ||||||
| 805(01)A | Culvert Cleaning, under 24" | 1 | CQ | Each | $ - 0 | ||||||
| 805(01)B | Culvert Cleaning, 24" to 35" | 1 | CQ | Each | $ - 0 | ||||||
| 805(01)C | Culvert Cleaning, 36" and larger | 1 | CQ | Each | $ - 0 | ||||||
| 805(02)A | Grade Dip Cleaning | 1 | CQ | Each | $ - 0 | ||||||
| 805(02)B | Rolling Dip Cleaning | 1 | CQ | Each | $ - 0 | ||||||
| 809(01) | Developing Water Supply and Watering | Per Task Order if applicable | CQ | CY | |||||||
| 900(01) | Snow Plowing, Single Lane | 1 | CQ | Mile | $ - 0 | ||||||
| 900(02) | Snow Plowing, Double Lane | 1 | CQ | Mile | $ - 0 | ||||||
| $ - 0 |
File details come from the government source that posted it.