SECTION B - SCHEDULE OF ITEMS Rev 2
Shoshone National Forest Roads

The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be included in a task order. See General Notes – Mobilization Pay Items

ZONES: Bidders shall enter the Zone(s) bidding. North = North Zone of Forest South = South Zone of Forest Both = Forest wide
Item No.DescriptionEstimated QuantityMethod of Meas.UnitZones BidBase Year Unit PriceOption Year (1) Unit PriceOption Year (2) Unit PriceOption Year (3) Unit PriceOption Year (4) Unit PriceBase Year Total Price
151(01)Mobilization of motor grader, Cat 140, JD770D, or equivalent from base of operations (one time per job)1CQMile$ - 0
151(02)Mobilization of backhoe/loader, Cat 416E , JD 310G, or equiv., 4-wheel drive, with extendable stick from base of operations (one time per job)1CQMile$ - 0
151(03)Mobilization of dozer, Cat D-4K2, Case 750M, Deere 550K, or equiv., w/tilt blade from base of operations (one time per job)1CQMile$ - 0
151(04)Mobilization of dozer, Cat D-5K2, Case 850M, Deere 650K, or equiv., w/tilt blade from base of operations (one time per job)1CQMile$ - 0
151(05)Mobilization of dozer, Cat D-6K2, Case 1150M, Deere 700K, or equiv., w/tilt blade from base of operations (one time per job)1CQMile$ - 0
151(06)Mobilization of track-mounted excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ thumb attachment from base of operation (one time per job)1CQMile$ - 0
151(07)Mobilization of skid steer, Bobcat S220 or equivalent from base of operations. (one time per job)1CQMile$ - 0
151(08)Mobilization of wheel loader, John Deere 544, Cat 950, or equiv. from base of operations. (one time per job)1CQMile$ - 0
151(09)Mobilization of Dump Truck, 10 C.Y. from base of operations (one time per job)1CQMile$ - 0
151(10)Mobilization of compactor, vibratory steel wheel, 8 ton minimum, from base of operations (one time per job)1CQMile$ - 0
151(11)Mobilization of water tender, 4,000 gallon pressurized; w/ operator. 8 hour minimum per job1CQMile$ - 0
151(12)Mobilization of mini-excavator, Cat 303 5C or equiv. w/ thumb attachment from base. (one time per job)1CQMile$ - 0
151(20)Bonding, Task Order above $35,000Per Task Orders >$35k%Each$ - 0
152(01)Construction Survey and StakingPer Task Order if applicableCQLS$ - 0
157(01)Soil Erosion Control, Silt Fence or Wattles1CQFoot$ - 0
157(02)Sediment Basin1CQEach$ - 0
201(01)Clearing & GrubbingPer Task Order if applicableCQAcre$ - 0
202(55)ARemoval & disposal of trees – dia. Less than 24”, disposal method “f”, Scattering1CQEach$ - 0
202(55)BRemoval & disposal of trees – dia. 24” or greater, disposal method “f”, Scattering1CQEach$ - 0
203(01)ARemoval of Existing Culverts, 12”-24”, disposal method “f”, Remove from Project1CQEach$ - 0
203(01)BRemoval of Existing Culverts, greater than 24”, disposal method “a”, Remove from Project1CQEach$ - 0
204(01)Roadway Excavation, compaction method “d”, finishing method “d”1CQCY$ - 0
204(02)Load and Haul Excavated Material1CQCY-Mile$ - 0
204(20)ADrainage Excavation, Type Rolling Dip Construct1CQEach$ - 0
204(20)BDrainage Excavation, Type Rolling Dip Reconstruct1CQEach$ - 0
204(20)CDrainage Excavation, Type Inlet/Outlet Ditch1CQFoot$ - 0
204(24)Haul1CQTon-Mile$ - 0
207(01)Geotextile, type, <fill in>Per Task Order if applicableCQSY$ - 0
211(03)ARoadway Obliteration, Method 1Per Task Order if applicableCQMile$ - 0
211(03)BRoadway Obliteration, Method 21CQMile$ - 0
211(03)CRoadway Obliteration, Method 31CQMile$ - 0
212(01)CLinear grading, Construction of RoadPer Task Order if applicableCQMile$ - 0
212(02)RLinear grading, Reconstruction of RoadPer Task Order if applicableCQMile$ - 0
230(01)ARoadside Brushing, Both Sides Heavy VegetationPer Task Order if applicableCQMile$ - 0
230(01)BRoadside Brushing, Both Sides Moderate Vegetation1CQMile$ - 0
230(01)CRoadside Brushing, Both Sides Light Vegetation1CQMile$ - 0
230(02)ARoadside Brushing, One Side Heavy VegetationPer Task Order if applicableCQMile$ - 0
230(02)BRoadside Brushing, One Side Moderate Vegetation1CQMile$ - 0
230(02)CRoadside Brushing, One Side Light Vegetation1CQMile$ - 0
251(02)APlaced Rip Rap, Class 2 (D50 = 6”)15CQTon$ - 0
251(02)BPlaced Rip Rap, Class 3 (D50 = 10”)15CQTon$ - 0
251(02)CPlaced Rip Rap, Class 6 (D50 = 22”)15CQTon$ - 0
251(02)DPlaced Rip Rap, Class 9 (D50 = 36”)15CQTon$ - 0
258(01)Retaining WallPer Task Order if applicableCQSF Face$ - 0
301(01)AAggregate base placement, grading U, Government Furnished Material, compaction method “A”15CQTon$ - 0
301(01)BAggregate base placement, grading U, Government Furnished Material, compaction method “B” – vibratory roller15CQTon$ - 0
301(01)CAggregate base, grading U, compaction method “A”15CQTon$ - 0
301(01)DAggregate base, grading U, compaction method “B” – vibratory roller15CQTon$ - 0
301(01)EAggregate base, grading O, compaction method “A”15CQTon$ - 0
301(01)FAggregate base, grading O, compaction method “B” – vibratory roller15CQTon$ - 0
301(15)Aggregate surface course, Type Pit Run, compaction method “A”15CQTon$ - 0
303(01)Roadway Reconditioning, Level 1 and 2 roads.1CQMile$ - 0
303(02)Roadway Reconditioning, Level 3 and 4 roads.1CQMile$ - 0
312(01)Dust Palliative, Type Magnesium Chloride1CQMile$ - 0
602(01)A18-inch 16 gauge diameter corrugated metal pipe, compaction method “f”1CQLF$ - 0
602(01)B24-inch diameter 16 gauge corrugated metal pipe, compaction method “f”1CQLF$ - 0
602(01)C36-inch diameter 16 gauge corrugated metal pipe, compaction method “f”1CQLF$ - 0
602(01)D48-inch diameter 16 gauge corrugated metal pipe, compaction method “f”1CQLF$ - 0
602(01)E60-inch diameter 12 gauge corrugated metal pipe, compaction method “f”1CQLF$ - 0
602(01)F72-inch diameter 10 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(02)A21” span, 15” rise 16 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(02)B28” span, 20” rise 16 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(02)C35” span, 24” rise 16 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(02)D42” span, 29” rise 16 gauge corrugated metal pipe, compaction method “f”CQLFCQ$ - 0
602(02)E49” span, 33” rise 16 gauge corrugated metal pipe, compaction method “f”CQLFCQ$ - 0
602(02)F57” span, 38” rise 16 gauge corrugated metal pipe, compaction method “f”CQLFCQ$ - 0
602(02)G71” span, 47” rise 12 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(02)H83” span, 57” rise 10 gauge corrugated metal pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(03)A14-inch rise, 23-inch span Class 3 reinforced concrete pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(03)B29-inch rise, 45-inch span Class 3 reinforced concrete pipe, compaction method “f”Per Task Order if applicableCQLF$ - 0
602(04)ATransport and Install 18-inch diameter corrugated metal pipe, Government Furnished, compaction method “f”1CQLF$ - 0
602(04)BTransport and Install 24-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f”1CQLF$ - 0
602(04)CTransport and Install 36-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f”1CQLF$ - 0
602(04)DTransport and Install 48-inch diameter 16 gauge corrugated metal pipe, Government Furnished, compaction method “f”1CQLF$ - 0
602(04)ETransport and Install 60-inch diameter 12 gauge corrugated metal pipe, Government Furnished, compaction method “f”1CQLF$ - 0
602(05)AFurnish and Install end section for 18” pipe culvert1CQEach$ - 0
602(06)AFurnish and Install end section for 24” pipe culvert1CQEach$ - 0
602(07)AFurnish and Install end section for 21” span, 15” rise pipe arch culvertPer Task Order if applicableCQEach$ - 0
602(07)BFurnish and Install end section for 28” span, 20” rise pipe arch culvertPer Task Order if applicableCQEach$ - 0
602(07)CFurnish and Install end section for 35” span, 24” rise pipe arch culvertPer Task Order if applicableCQEach$ - 0
602(07)DFurnish and Install end section for 42” span, 29” rise pipe arch culvertPer Task Order if applicableCQEach$ - 0
605(08)AGranular Backfill, AASHTO M 43 Size #56 (1” to 3/8”), washed15CQTon$ - 0
605(08)BGranular Backfill, AASHTO M 43 Size #1 (3 ½” to 1 ½”), washed15CQTon$ - 0
619(01)Furnish and Install Fence, type barbed wire1CQFoot$ - 0
619(02)Furnish and Install Gate, type barbed wire, size 16’ wide1CQEach$ - 0
619(02)ATransport and Install Government Furnished 16’ Type 1 Gate1CQEach$ - 0
619(02)BFurnish and Install 16’ Type 1 Gate1CQEach$ - 0
619(03)Transport and Install Government Furnished 16’ Type 2 Gate1CQEach$ - 0
619(04)Furnish and Install 16’ Type 2 Gate1CQEach$ - 0
619(06)Transport and Install Government furnished 16’ Cattleguard1CQEach$ - 0
619(07)Furnish and Install 16’ Cattleguard1CQEach$ - 0
622(01)Motor Grader, Cat 140, JD770D, or equivalent; with operator1CQHour$ - 0
622(02)Backhoe/Loader, Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick; with operator1CQHour$ - 0
622(03)Crawler Dozer, Cat D-4K2, Case 750M, Deere 550K, or equivalent, w/ tilt blade; with operator1CQHour$ - 0
622(04)Crawler Dozer, Cat D-5K2, Case 850M, Deere 650K, or equivalent, w/ tilt blade; with operator1CQHour$ - 0
622(05)Crawler Dozer, Cat D-6K2, Case 1150M, Deere 700K, or equivalent, w/ tilt blade; with operator1CQHour$ - 0
622(06)Track Mounted Excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ thumb attachment; with operator1CQHour$ - 0
622(07)Track Mounted Excavator, Cat 320, Case CX210D, Deere 210G, or equiv., w/ rock hammer attachment; with operator1CQHour$ - 0
622(08)Wheel Loader, John Deere 544, Cat 950, or equivalent, with operator1CQHour$ - 0
622(09)Mini-excavator, Cat 303 5C or equiv. w/ thumb attachment; with operator1CQHour$ - 0
622(10)Skid steer, Bobcat S220 or equivalent; with operator1CQHour$ - 0
622(11)Compactor, vibratory steel wheel, 8 Ton Minimum1CQHour$ - 0
622(12)Dump Truck, 10 C.Y. with operator1CQHour$ - 0
623(01)AGeneral Labor1CQHour$ - 0
623(01)CMobile Welder w/operator1CQHour$ - 0
625(01)Seeding, Dry Method1CQAcre$ - 0
633(10)Remove Sign (includes disposal of sign off Government property)1CQEach$ - 0
633(90)AInstall Single Post Sign (4"x4" post) - Government Furnished Sign1CQEach$ - 0
633(90)BInstall Double Post Sign (4"x4" posts) - Government Furnished Sign1CQEach$ - 0
633(90)CInstall Carsonite Sign, Government Furnished Sign1CQEach$ - 0
648(04)Place Streambed Simulation Rock, Placement method <fill in>Per Task Order if applicableCQCY$ - 0
802(01)Ditch Cleaning1CQMile$ - 0
805(01)ACulvert Cleaning, under 24"1CQEach$ - 0
805(01)BCulvert Cleaning, 24" to 35"1CQEach$ - 0
805(01)CCulvert Cleaning, 36" and larger1CQEach$ - 0
805(02)AGrade Dip Cleaning1CQEach$ - 0
805(02)BRolling Dip Cleaning1CQEach$ - 0
809(01)Developing Water Supply and WateringPer Task Order if applicableCQCY
900(01)Snow Plowing, Single Lane1CQMile$ - 0
900(02)Snow Plowing, Double Lane1CQMile$ - 0
$ - 0