Amendment 2 Attachment 1.docx
DOCX document 44 KB Posted
- Solicitation number
- 127EAX24R0005
- Issued by
-
Department of Agriculture Forest Service
About this file
This amendment provides additional details for solicitation number 127EAX24R0005 from the Department of Agriculture Forest Service. The solicitation seeks proposals for improvements to the GAOA Echo Amphitheatre recreation site located in the Carson National Forest in New Mexico. Specifically, the Forest Service is requesting bids for Phase II of construction work at the amphitheatre, following an initial phase of site development. Response submissions are due by the date specified in the original solicitation documentation. The amendment attachment includes supplemental instructions or requirements for offerors to consider when preparing their proposals for the Phase II site improvements project. Details provided will ensure proposals address the Forest Service's needs for completing the next stage of development at the GAOA Echo Amphitheatre recreation area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 SOI.docx | DOCX document | |
| amendment 4.docx | DOCX document | |
| amendment 3.docx | DOCX document | |
| amendment 2.docx | DOCX document | |
| Amendment 1 Attachment 3.docx | DOCX document | |
| Amendment 1 Attachment 2.docx | DOCX document | |
| Amendment 1 Attachment 1.docx | DOCX document | |
| amendment 1.docx | DOCX document | |
| Section 00151 - Mobilization.docx | DOCX document | |
| Section 02100 - Timber Retaining Walls and Gravel Pad.doc | DOC document | |
| Section 02510 - Water Distribution.doc | DOC document | |
| Section 16400 - Underground Cable.doc | DOC document | |
| Wage determination.pdf | ||
| ECHO Drawings.pdf | ||
| Section 02316 - Excavation Trenching and Backfilling for Utility Systems.doc | DOC document | |
| 127EAX24R0005.pdf | ||
| Section 02101 - Road and Campsite Resurfacing.doc | DOC document | |
| Section 02102 - Clearing and Grubbing.doc | DOC document | |
| Section 02104 - General Recreation Site.doc | DOC document | |
| Section 02103 - Split Rail Fence.doc | DOC document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Service Carson National Forest Supervisor's Office 208 Cruz Alta Rd Taos NM 87571 575-758-6200
File Code: 7100 Date: February 29, 2024 Route To:
Subject: GAOA-Echo Amphitheater Recreation Site Development Phase II Solicitation No. 127EAX24R0005 Request for Information (RFI) Responses: Attachment 1, Amendment 0002
This document shall serve as the official response to questions provided by potential bidders for the subject project.
Questions:
1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?
RESPONSE: The Carson National Forest is not providing guidance to how contractors manage the project. Contractors shall acknowledge that the forest will have staff on site that will be overseeing work and coordinating with the contractor representative throughout the project. If a contractor decides to provide multiple superintendents, that is purely up to them.
2. Are contractors required to issue a contract specific QA/QC Plan?
RESPONSE: No. Carson National Forest staff will be on site daily to ensure the project is on track and work is being done according to contract drawings & specifications.
3. Are contractors required to issue a contract specific Safety Plan?
RESPONSE: No, however the contractor shall be responsible for following any/all applicable OSHA guidelines. Also, it shall be noted that overall safety, health and well-being of the contractor and their employees is not the responsibility of the forest. The USFS will not assume liability for any accidents. Contractor shall exercise extreme caution when trenching and excavating as utilities depicted in the drawings are for visual purpose only.
4. Is this project tax exempt?
RESPONSE: The project is tax exempt except for any applicable state or local taxes.
5. Copper Nathenate treated timbers are not "commercially available". Will the USFS allow the use of another treatment or allow for the Copper Nathenate to be field applied on site after cutting?
RESPONSE: Copper Nathenate may be applied on site per manufacturer recommendations. Contractors shall submit Material Data Sheet and application instructions for the Copper Nathenate for forest service staff to ensure the treatment is applied appropriately.
6. Sheet X-15 details 1 and 3 show a 3" layer of compacted ABC over the utility trenches. This is not discussed in the specifications. Is it the intent/desire of the USFS to cap ALL utility trenched with compacted base course?
RESPONSE: Yes, all utility trenches to be capped with a 3” layer of compacted base course per the details. See specifications for compaction standards.
7. Can you provide the detail for FSORAG 4.7 for hydrant installation?
RESPONSE: See detail below. The hydrant details in the drawings were put together in accordance with FSORAG 4.7.
image1.png image2.jpeg
File details come from the government source that posted it. Updated .