This document provides details for a federal solicitation seeking pavement renovation services. The solicitation requests bids to supply all labor, equipment, traffic control and other services to pulverize, reshape, compact and repave segments of existing pavement at the Sabino Canyon Recreation Area. Work includes full depth reclamation of some sections, application of fog seal and crack sealing. The construction value is estimated between $1 million to $3 million. Questions are due by September 1st and bids are due by September 15th. A bid bond of 20% is required. The soliciting agency is the US Department of Agriculture Forest Service for the Coronado-GAOA region.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SABINO CANYON MAJOR PAY ITEM LOCATIONS AND MILEAGE | ||||||
| ITEM | DESCRIPTION | ROAD NUMBER | FINAL WIDTH (Approx Existing) | MILE POST--START_END | (Net Measure) | Subtotals from Column F |
| 15204 | Slope and reference staking; _____method, tolerance class ___ | |||||
| Additive #1 Item | 20 | Shuttle Loop to MP 0.740 (top of hill) | 0.74 | 0.74 | ||
| Base Bid item | 100 | 20 | 0.740 to MP 1.595 | 0.855 | ||
| Base Bid item | 100 | 20 | 1.705_1.725 (Xing 2 to Xing 3) | 0.02 | ||
| Base Bid item | 100 | 19 | 1.790_1.920 (Xing 3 to Xing 4) | 0.13 | ||
| Base Bid item | 100 | 18 | 1.940_2.000 (Xing 4 to Xing 5) | 0.06 | ||
| Base Bid item | 100 | 22 | 2.300_2.410 (Xing 6 to Xing 7) | 0.11 | ||
| Base Bid item | 100 | 20 | 2.425_2.520 (Xing 7 to Xing 8) | 0.095 | ||
| Base Bid item | 100 | 20 | 2.600_2.850 (Xing 8 to MP 2.850) | 0.25 | ||
| Base Bid item | 100 | 20 | 3.205_3.780 (3.205 to End of Rd Loop) | 0.575 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.540_0.700 (to Xings) | 0.16 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.820_1.550 (Xings to End of Rd Loop) | 0.73 | ||
| (possibly unused) Base Bid item | 100 A (Bear Canyon) | 20 | 0.000_0.5400 (Starts at Road 100 jct) | 0.54 | 3.525 | |
| 4.265 |
| 15206 | Clearing and grubbing limits | |||||
| (possibly unused) Base Bid item | 20 | Shuttle Loop to MP 0.740 (top of hill) | 0.74 | |||
| Base Bid item | 100 | 20 | 0.740 to MP 1.595 | 0.855 | ||
| Base Bid item | 100 | 20 | 1.705_1.725 (Xing 2 to Xing 3) | 0.02 | ||
| Base Bid item | 100 | 19 | 1.790_1.920 (Xing 3 to Xing 4) | 0.13 | ||
| Base Bid item | 100 | 18 | 1.940_2.000 (Xing 4 to Xing 5) | 0.06 | ||
| Base Bid item | 100 | 22 | 2.300_2.410 (Xing 6 to Xing 7) | 0.11 | ||
| Base Bid item | 100 | 20 | 2.425_2.520 (Xing 7 to Xing 8) | 0.095 | ||
| Base Bid item | 100 | 20 | 2.600_2.850 (Xing 8 to MP 2.850) | 0.25 | ||
| Base Bid item | 100 | 20 | 3.205_3.780 (3.205 to End of Rd Loop) | 0.575 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.540_0.700 (to Xings) | 0.16 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.820_1.550 (Xings to End of Rd Loop) | 0.73 | ||
| (possibly unused) Base Bid item | 100 A (Bear Canyon) | 20 | 0.000_0.5400 (Starts at Road 100 jct) | 0.54 | 4.265 |
| 304.01 | Full Depth Reclamation (aka full-depth milling) | |||||
| Additive #1 Item | 100 | 20 | Shuttle Loop to MP 0.740 (top of hill) | 0.74 | 0.74 | |
| Base Bid item | 100 | 20 | 0.740 to MP 1.595 | 0.855 | ||
| Base Bid item | 100 | 20 | 1.705_1.725 (Xing 2 to Xing 3) | 0.02 | ||
| Base Bid item | 100 | 19 | 1.790_1.920 (Xing 3 to Xing 4) | 0.13 | ||
| Base Bid item | 100 | 18 | 1.940_2.000 (Xing 4 to Xing 5) | 0.06 | ||
| Base Bid item | 100 | 22 | 2.300_2.410 (Xing 6 to Xing 7) | 0.11 | ||
| Base Bid item | 100 | 20 | 2.425_2.520 (Xing 7 to Xing 8) | 0.095 | ||
| Base Bid item | 100 | 20 | 2.600_2.850 (Xing 8 to MP 2.850) | 0.25 | ||
| Base Bid item | 100 | 20 | 3.205_3.780 (3.205 to End of Rd Loop) | 0.575 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.540_0.700 (to Xings) | 0.16 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.820_1.550 (Xings to End of Rd Loop) | 0.73 | 2.985 | |
| Additive #2 Item | 100 A (Bear Canyon) | 20 | 0.000_0.540 (Starts at Road 100 jct) | 0.54 | 0.54 | |
| 4.265 | ||||||
| 40301 | Hot asphalt concrete pavement 3-inch compacted depth, PAG Residential 1/2-inch mix | |||||
| Additive #1 Item | 20 | Shuttle Loop to MP 0.740 (top of hill) | 0.74 | 0.74 | ||
| Base Bid item | 100 | 20 | 0.740 to MP 1.595 | 0.855 | ||
| Base Bid item | 100 | 20 | 1.705_1.725 (Xing 2 to Xing 3) | 0.02 | ||
| Base Bid item | 100 | 19 | 1.790_1.920 (Xing 3 to Xing 4) | 0.13 | ||
| Base Bid item | 100 | 18 | 1.940_2.000 (Xing 4 to Xing 5) | 0.06 | ||
| Base Bid item | 100 | 22 | 2.300_2.410 (Xing 6 to Xing 7) | 0.11 | ||
| Base Bid item | 100 | 20 | 2.425_2.520 (Xing 7 to Xing 8) | 0.095 | ||
| Base Bid item | 100 | 20 | 2.600_2.850 (Xing 8 to MP 2.850) | 0.25 | ||
| Base Bid item | 100 | 20 | 3.205_3.780 (3.205 to End of Rd Loop) | 0.575 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.540_0.700 (to Xings) | 0.16 | ||
| Base Bid item | 100 A (Bear Canyon) | 20 | 0.820_1.550 (Xings to End of Rd Loop) | 0.73 | 2.985 | |
| Additive #2 Item | 100 A (Bear Canyon) | 20 | 0.000_0.540 (Starts at Road 100 jct) | 0.54 | 0.54 | |
| 4.265 |
| 40601 | Fog Seal at 0.06 GAL/SY | |||||
| Additive #1 Item | 100 | 20 | Shuttle Loop to MP 0.740 (top of hill) | 0.74 | ||
| Additive #1 Item | 100 | 20 | 0.740 to MP 1.595 | 0.855 | ||
| Additive #1 Item | 100 | 18 | 1.940_2.000 (Xing 4 to Xing 5) | 0.06 | ||
| Additive #1 Item | 100 | 22 | 2.300_2.410 (Xing 6 to Xing 7) | 0.11 | ||
| Additive #1 Item | 100 | 20 | 2.425_2.520 (Xing 7 to Xing 8) | 0.095 | ||
| Additive #1 Item | 100 | 20 | 2.600_2.850 (Xing 8 to MP 2.850) | 0.25 | ||
| Additive #1 Item | 100 | 20 | 3.205_3.780 (3.205 to End of Rd Loop) | 0.575 | ||
| Additive #1 Item | 100 A (Bear Canyon) | 20 | 0.540_0.700 (to Xings) | 0.16 | ||
| Additive #1 Item | 100 A (Bear Canyon) | 20 | 0.820_1.550 (Xings to End of Rd Loop) | 0.73 | 3.575 | |
| 3.575 | ||||||
| 40601 | Fog Seal at 0.12 GAL/SY on EXISTING PAVEMENT | |||||
| Additive #1 Item | 100 | 20 | 1.605_1.690 (Xing 1 to Xing 2) | 0.085 | ||
| Additive #1 Item | 100 | 20 | 2.000_2.115 (2.000 to Xing 5) | 0.115 | ||
| Additive #1 Item | 100 | 20 | 2.150_2.275 (Xing 5 to Xing 6) | 0.125 | ||
| Additive #1 Item | 100 | 22 | Loop at 2.115 (22'x200') | 0.038 | ||
| Additive #1 Item | 100 | 20 | 2.850_2.990 (2.850 to Xing 9) | 0.14 | ||
| Additive #1 Item | 100 | 20 | 3.100_3.205 (Xing 9 to 3.205) | 0.105 | 0.608 | |
| < Additive #1 Item, but change to 0.06 GAL/SY if Additive #2 awarded > | 100 A (Bear Canyon) | 19 | 0.000_0.540 | 0.54 | 0.54 | |
| 1.148 |
| 41413 | Crack sealant | |||||
| Base Bid item | 100 | 20 | 1.605_1.690 (Xing 1 to Xing 2) | 0.085 | ||
| Base Bid item | 100 | 20 | 2.000_2.115 (2.000 to Xing 5) | 0.115 | ||
| Base Bid item | 100 | 20 | 2.150_2.275 (Xing 5 to Xing 6) | 0.125 | ||
| Base Bid item | 100 | 22 | Loop at 2.115 (22'x200') | 0.038 | ||
| Base Bid item | 100 | 20 | 2.850_2.990 (2.850 to Xing 9) | 0.14 | ||
| Base Bid item | 100 | 20 | 3.100_3.205 (Xing 9 to 3.205) | 0.105 | 0.608 | |
| < delete if Additive #2 awarded > | 100 A (Bear Canyon) | 19 | 0.000_0.540 | 0.54 | 0.54 | |
| 1.148 | ||||||
| Rev: 8/31/2021 |