20210827_SabinoPavement_AMEND_MAJOR_PAY_ITEM_LOCATIONS_AND_MILEAGE.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Coronado -GAOA - Renovate Sabino Canyon Recreation Area Pavement
Solicitation number
127EAX21R0033
Issued by

About this file

This document provides details for a federal solicitation seeking pavement renovation services. The solicitation requests bids to supply all labor, equipment, traffic control and other services to pulverize, reshape, compact and repave segments of existing pavement at the Sabino Canyon Recreation Area. Work includes full depth reclamation of some sections, application of fog seal and crack sealing. The construction value is estimated between $1 million to $3 million. Questions are due by September 1st and bids are due by September 15th. A bid bond of 20% is required. The soliciting agency is the US Department of Agriculture Forest Service for the Coronado-GAOA region.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SABINO CANYON MAJOR PAY ITEM LOCATIONS AND MILEAGE
ITEMDESCRIPTIONROAD NUMBERFINAL WIDTH (Approx Existing)MILE POST--START_END(Net Measure)Subtotals from Column F
15204Slope and reference staking; _____method, tolerance class ___
Additive #1 Item20Shuttle Loop to MP 0.740 (top of hill)0.740.74
Base Bid item100200.740 to MP 1.5950.855
Base Bid item100201.705_1.725 (Xing 2 to Xing 3)0.02
Base Bid item100191.790_1.920 (Xing 3 to Xing 4)0.13
Base Bid item100181.940_2.000 (Xing 4 to Xing 5)0.06
Base Bid item100222.300_2.410 (Xing 6 to Xing 7)0.11
Base Bid item100202.425_2.520 (Xing 7 to Xing 8)0.095
Base Bid item100202.600_2.850 (Xing 8 to MP 2.850)0.25
Base Bid item100203.205_3.780 (3.205 to End of Rd Loop)0.575
Base Bid item100 A (Bear Canyon)200.540_0.700 (to Xings)0.16
Base Bid item100 A (Bear Canyon)200.820_1.550 (Xings to End of Rd Loop)0.73
(possibly unused) Base Bid item100 A (Bear Canyon)200.000_0.5400 (Starts at Road 100 jct)0.543.525
4.265
15206Clearing and grubbing limits
(possibly unused) Base Bid item20Shuttle Loop to MP 0.740 (top of hill)0.74
Base Bid item100200.740 to MP 1.5950.855
Base Bid item100201.705_1.725 (Xing 2 to Xing 3)0.02
Base Bid item100191.790_1.920 (Xing 3 to Xing 4)0.13
Base Bid item100181.940_2.000 (Xing 4 to Xing 5)0.06
Base Bid item100222.300_2.410 (Xing 6 to Xing 7)0.11
Base Bid item100202.425_2.520 (Xing 7 to Xing 8)0.095
Base Bid item100202.600_2.850 (Xing 8 to MP 2.850)0.25
Base Bid item100203.205_3.780 (3.205 to End of Rd Loop)0.575
Base Bid item100 A (Bear Canyon)200.540_0.700 (to Xings)0.16
Base Bid item100 A (Bear Canyon)200.820_1.550 (Xings to End of Rd Loop)0.73
(possibly unused) Base Bid item100 A (Bear Canyon)200.000_0.5400 (Starts at Road 100 jct)0.544.265
304.01Full Depth Reclamation (aka full-depth milling)
Additive #1 Item10020Shuttle Loop to MP 0.740 (top of hill)0.740.74
Base Bid item100200.740 to MP 1.5950.855
Base Bid item100201.705_1.725 (Xing 2 to Xing 3)0.02
Base Bid item100191.790_1.920 (Xing 3 to Xing 4)0.13
Base Bid item100181.940_2.000 (Xing 4 to Xing 5)0.06
Base Bid item100222.300_2.410 (Xing 6 to Xing 7)0.11
Base Bid item100202.425_2.520 (Xing 7 to Xing 8)0.095
Base Bid item100202.600_2.850 (Xing 8 to MP 2.850)0.25
Base Bid item100203.205_3.780 (3.205 to End of Rd Loop)0.575
Base Bid item100 A (Bear Canyon)200.540_0.700 (to Xings)0.16
Base Bid item100 A (Bear Canyon)200.820_1.550 (Xings to End of Rd Loop)0.732.985
Additive #2 Item100 A (Bear Canyon)200.000_0.540 (Starts at Road 100 jct)0.540.54
4.265
40301Hot asphalt concrete pavement 3-inch compacted depth, PAG Residential 1/2-inch mix
Additive #1 Item20Shuttle Loop to MP 0.740 (top of hill)0.740.74
Base Bid item100200.740 to MP 1.5950.855
Base Bid item100201.705_1.725 (Xing 2 to Xing 3)0.02
Base Bid item100191.790_1.920 (Xing 3 to Xing 4)0.13
Base Bid item100181.940_2.000 (Xing 4 to Xing 5)0.06
Base Bid item100222.300_2.410 (Xing 6 to Xing 7)0.11
Base Bid item100202.425_2.520 (Xing 7 to Xing 8)0.095
Base Bid item100202.600_2.850 (Xing 8 to MP 2.850)0.25
Base Bid item100203.205_3.780 (3.205 to End of Rd Loop)0.575
Base Bid item100 A (Bear Canyon)200.540_0.700 (to Xings)0.16
Base Bid item100 A (Bear Canyon)200.820_1.550 (Xings to End of Rd Loop)0.732.985
Additive #2 Item100 A (Bear Canyon)200.000_0.540 (Starts at Road 100 jct)0.540.54
4.265
40601Fog Seal at 0.06 GAL/SY
Additive #1 Item10020Shuttle Loop to MP 0.740 (top of hill)0.74
Additive #1 Item100200.740 to MP 1.5950.855
Additive #1 Item100181.940_2.000 (Xing 4 to Xing 5)0.06
Additive #1 Item100222.300_2.410 (Xing 6 to Xing 7)0.11
Additive #1 Item100202.425_2.520 (Xing 7 to Xing 8)0.095
Additive #1 Item100202.600_2.850 (Xing 8 to MP 2.850)0.25
Additive #1 Item100203.205_3.780 (3.205 to End of Rd Loop)0.575
Additive #1 Item100 A (Bear Canyon)200.540_0.700 (to Xings)0.16
Additive #1 Item100 A (Bear Canyon)200.820_1.550 (Xings to End of Rd Loop)0.733.575
3.575
40601Fog Seal at 0.12 GAL/SY on EXISTING PAVEMENT
Additive #1 Item100201.605_1.690 (Xing 1 to Xing 2)0.085
Additive #1 Item100202.000_2.115 (2.000 to Xing 5)0.115
Additive #1 Item100202.150_2.275 (Xing 5 to Xing 6)0.125
Additive #1 Item10022Loop at 2.115 (22'x200')0.038
Additive #1 Item100202.850_2.990 (2.850 to Xing 9)0.14
Additive #1 Item100203.100_3.205 (Xing 9 to 3.205)0.1050.608
< Additive #1 Item, but change to 0.06 GAL/SY if Additive #2 awarded >100 A (Bear Canyon)190.000_0.5400.540.54
1.148
41413Crack sealant
Base Bid item100201.605_1.690 (Xing 1 to Xing 2)0.085
Base Bid item100202.000_2.115 (2.000 to Xing 5)0.115
Base Bid item100202.150_2.275 (Xing 5 to Xing 6)0.125
Base Bid item10022Loop at 2.115 (22'x200')0.038
Base Bid item100202.850_2.990 (2.850 to Xing 9)0.14
Base Bid item100203.100_3.205 (Xing 9 to 3.205)0.1050.608
< delete if Additive #2 awarded >100 A (Bear Canyon)190.000_0.5400.540.54
1.148
Rev: 8/31/2021

File details come from the government source that posted it. Updated .