This solicitation seeks proposals to renovate pavement at the Sabino Canyon Recreation Area. The scope of work includes pulverizing existing pavement through milling, reshaping and compacting the milled areas, and repaving with hot mix asphalt. The project is estimated to cost between $1-3 million. Questions are due by September 1st and responses are due by September 15th. A bid bond of 20% is required. The soliciting agency is the US Department of Agriculture Forest Service Southwestern Region. The solicitation also includes additive bid items to renovate additional segments of Roads 100, 100A, and intermittent concrete ditch lining.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| v1: 8/27/2021 | Renovation of Sabino Canyon Recreation Area Pavement |
| SCHEDULE OF ITEMS |
| BASE BID ITEMS | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 151.01 | Mobilization | Lump Sum | 1 | EA | ||
| 152.04 | Slope and reference staking, roadway existing ('subgrade') surface and finish stakes per table 152.-1 | Mile | 3.525 | EA | $0.00 | |
| 152.06 | Clearing and grubbing limits--flagged BOTH SIDES | Mile | 4.265 | EA | $0.00 | |
| 157.13 | Soil Erosion & Pollution Control including ditch and inlet wattles | Mile | 4.265 | EA | $0.00 | |
| 201.03 | Clearing and grubbing, 6-feet wide per road shoulder, BOTH SIDES, dispose off National Forest Land | Mile | 4.625 | EA | $0.00 | |
| 202.04 | Special clearing and grubbing, ditchlines, cutslopes as indicated by COR | ACRE | 1 | EA | $0.00 | |
| 301.01 | Aggregate surface course, per 703.05 and gradation per Table 703-3, compaction method per 301.05, primarily for shoulding | Ton | 1436 | EA | $0.00 | |
| 303.07 | Roadway reconditioning, per 303.07--Ditch, Shoulder, Road (approx 2.985 miles) | Mile | 2.99 | EA | $0.00 | |
| 304.01 | Full Depth Reclamation, aka full depth milling of pavement (approx 2.985 miles) | SY | 35079 | EA | $0.00 | |
| 403.01 | Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix. | Ton | 6378 | EA | $0.00 | |
| 414.13 | Crack sealant, complete | Ton | 10.5 | EA | $0.00 | |
| 418.04 | Asphalt Pavement Full Depth Patch, Type 2 (FDP-2). | SY | 250 | EA | $0.00 | |
| 602.11 | Install 24-inch Corrugated galvanized steel 16 gauge drainage pipe, including sawcut and patch w/3-inch hot mix, junction Road 100A & 100B on 100B | Foot | 60 | EA | $0.00 | |
| 634.01 | Pavement markings, thermoplastic, type H, with glass beads, WHITE | Foot | 2800 | EA | ||
| 634.02 | Pavement markings, thermoplastic, type H, with glass beads, YELLOW | Foot | 3200 | EA | ||
| 635.01 | Temporary traffic control--Sabino Road 100--One Lane or Delay Public Access--During survey, veg, crack, fog work | Day | 28 | EA | $0.00 | |
| 635.02 | Temporary traffic control--Sabino Road 100--Full Closure--During ditch, shoulder, milling, paving work | Day | 30 | EA | $0.00 | |
| 635.03 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog work | Day | 14 | EA | $0.00 | |
| 635.04 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving work | Day | 14 | EA | $0.00 | |
| 635.05 | A PAIR of Variable Message Sign sized for 45 mph | Day | 75 | EA | $0.00 | |
| 635.06 | Variable Message Sign sized for 25 mph | Day | 75 | EA | $0.00 | |
| 637.01 | Field Office | Day | 75 | EA | $0.00 | |
| SUBTotal NO MOB | $0.00 | |||||
| BASE BID | SUBTOTAL WITH MOB | $0.00 |
| ADDITIVE BID ITEM #1 | ||||||
| Road 100 from MP 0.000 to 0.740 plus Fog Seal MP 0.000 to End | ||||||
| 151.12 | Mobilization | Lump Sum | EA | |||
| 152.14 | Slope and reference staking, roadway existing ('subgrade') surface and finish stakes per table 152.-1 | Mile | 0.74 | EA | $0.00 | |
| 304.11 | Full Depth Reclamation (approx 0.740 miles) | SY | 9117 | EA | $0.00 | |
| 403.11 | Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix. | Ton | 1661 | EA | $0.00 | |
| 406.11 | Fog Seal @ 0.06 gal/sy on new mat | Ton | 11.85 | EA | $0.00 | |
| 406.12 | Fog Seal @ 0.12 gal/sy on old mat | Ton | 20.53 | EA | $0.00 | |
| 635.13 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog work | Day | 8 | EA | $0.00 | |
| 635.14 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving work | Day | 8 | EA | $0.00 | |
| SUBTotal NO MOB | $0.00 | |||||
| TOTAL WITH MOB | $0.00 |
SUBTOTAL WITH MOB $0.00
| ADDITIVE BID ITEM #2 | ||||||
| Road 100A from MP 0.000 to 0.540 | ||||||
| 151.22 | Mobilization | Lump Sum | EA | |||
| 303.27 | Roadway reconditioning, per 303.07--Ditch, Shoulder, Road | Mile | 0.54 | EA | $0.00 | |
| 304.21 | Full Depth Reclamation (approx 0.540 miles) | SY | 6653 | EA | $0.00 | |
| 403.21 | Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix. | Ton | 1210 | EA | $0.00 | |
| 406.21 | Fog Seal @ 0.06 gal/sy on new mat | Ton | 1.79 | EA | $0.00 | |
| 635.23 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog work | Day | 5 | EA | $0.00 | |
| 635.24 | Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving work | Day | 5 | EA | $0.00 | |
| SUBTotal NO MOB | $0.00 | |||||
| TOTAL WITH MOB | $0.00 |
SUBTOTAL WITH MOB $0.00
| ADDITIVE BID ITEM #3 | ||||||
| Road 100 Intermittent Concrete Ditch Lining MP 3.50 to 3.78, to match adjacent area | ||||||
| 151.32 | Mobilization | Lump Sum | EA | |||
| 608.31 | Type 4 Concrete Paved Waterway--concrete ditch apron--4-inch slab depth--WWF reinforcement--Adobe integral color | SY | 600 | EA | $0.00 | |
| 303.33 | Ditch Reconditioning--clean interior of grated cross drains | Lump Sum | 5 | EA | $0.00 | |
| 635.32 | Temporary traffic control--Sabino Road 100--Full Closure--During concrete apron and cross drain work | Day | 7 | EA | $0.00 | |
| SUBTotal NO MOB | $0.00 | |||||
| TOTAL WITH MOB | $0.00 |
SUBTOTAL WITH MOB $0.00