This solicitation seeks proposals to renovate pavement at the Sabino Canyon Recreation Area. The scope of work includes pulverizing existing pavement through milling, reshaping and compacting the milled areas, and repaving with hot mix asphalt. The project is estimated to cost between $1-3 million. Questions are due by September 1st and responses are due by September 15th. A bid bond of 20% is required. The soliciting agency is the US Department of Agriculture Forest Service Southwestern Region. The solicitation also includes additive bid items to renovate additional segments of Roads 100, 100A, and intermittent concrete ditch lining.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

v1: 8/27/2021Renovation of Sabino Canyon Recreation Area Pavement
SCHEDULE OF ITEMS
BASE BID ITEMS
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
151.01MobilizationLump Sum1EA
152.04Slope and reference staking, roadway existing ('subgrade') surface and finish stakes per table 152.-1Mile3.525EA$0.00
152.06Clearing and grubbing limits--flagged BOTH SIDESMile4.265EA$0.00
157.13Soil Erosion & Pollution Control including ditch and inlet wattlesMile4.265EA$0.00
201.03Clearing and grubbing, 6-feet wide per road shoulder, BOTH SIDES, dispose off National Forest LandMile4.625EA$0.00
202.04Special clearing and grubbing, ditchlines, cutslopes as indicated by CORACRE1EA$0.00
301.01Aggregate surface course, per 703.05 and gradation per Table 703-3, compaction method per 301.05, primarily for shouldingTon1436EA$0.00
303.07Roadway reconditioning, per 303.07--Ditch, Shoulder, Road (approx 2.985 miles)Mile2.99EA$0.00
304.01Full Depth Reclamation, aka full depth milling of pavement (approx 2.985 miles)SY35079EA$0.00
403.01Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix.Ton6378EA$0.00
414.13Crack sealant, completeTon10.5EA$0.00
418.04Asphalt Pavement Full Depth Patch, Type 2 (FDP-2).SY250EA$0.00
602.11Install 24-inch Corrugated galvanized steel 16 gauge drainage pipe, including sawcut and patch w/3-inch hot mix, junction Road 100A & 100B on 100BFoot60EA$0.00
634.01Pavement markings, thermoplastic, type H, with glass beads, WHITEFoot2800EA
634.02Pavement markings, thermoplastic, type H, with glass beads, YELLOWFoot3200EA
635.01Temporary traffic control--Sabino Road 100--One Lane or Delay Public Access--During survey, veg, crack, fog workDay28EA$0.00
635.02Temporary traffic control--Sabino Road 100--Full Closure--During ditch, shoulder, milling, paving workDay30EA$0.00
635.03Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog workDay14EA$0.00
635.04Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving workDay14EA$0.00
635.05A PAIR of Variable Message Sign sized for 45 mphDay75EA$0.00
635.06Variable Message Sign sized for 25 mphDay75EA$0.00
637.01Field OfficeDay75EA$0.00
SUBTotal NO MOB$0.00
BASE BIDSUBTOTAL WITH MOB$0.00
ADDITIVE BID ITEM #1
Road 100 from MP 0.000 to 0.740 plus Fog Seal MP 0.000 to End
151.12MobilizationLump SumEA
152.14Slope and reference staking, roadway existing ('subgrade') surface and finish stakes per table 152.-1Mile0.74EA$0.00
304.11Full Depth Reclamation (approx 0.740 miles)SY9117EA$0.00
403.11Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix.Ton1661EA$0.00
406.11Fog Seal @ 0.06 gal/sy on new matTon11.85EA$0.00
406.12Fog Seal @ 0.12 gal/sy on old matTon20.53EA$0.00
635.13Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog workDay8EA$0.00
635.14Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving workDay8EA$0.00
SUBTotal NO MOB$0.00
TOTAL WITH MOB$0.00

SUBTOTAL WITH MOB $0.00

ADDITIVE BID ITEM #2
Road 100A from MP 0.000 to 0.540
151.22MobilizationLump SumEA
303.27Roadway reconditioning, per 303.07--Ditch, Shoulder, RoadMile0.54EA$0.00
304.21Full Depth Reclamation (approx 0.540 miles)SY6653EA$0.00
403.21Hot asphalt concrete pavement, 3-inch compacted depth, PAG Residential 1/2-inch mix.Ton1210EA$0.00
406.21Fog Seal @ 0.06 gal/sy on new matTon1.79EA$0.00
635.23Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During survey, veg, crack, fog workDay5EA$0.00
635.24Temporary traffic control--Lower Sabino/Bear Roads 100A, B, D--During ditch, shoulder, milling, paving workDay5EA$0.00
SUBTotal NO MOB$0.00
TOTAL WITH MOB$0.00

SUBTOTAL WITH MOB $0.00

ADDITIVE BID ITEM #3
Road 100 Intermittent Concrete Ditch Lining MP 3.50 to 3.78, to match adjacent area
151.32MobilizationLump SumEA
608.31Type 4 Concrete Paved Waterway--concrete ditch apron--4-inch slab depth--WWF reinforcement--Adobe integral colorSY600EA$0.00
303.33Ditch Reconditioning--clean interior of grated cross drainsLump Sum5EA$0.00
635.32Temporary traffic control--Sabino Road 100--Full Closure--During concrete apron and cross drain workDay7EA$0.00
SUBTotal NO MOB$0.00
TOTAL WITH MOB$0.00

SUBTOTAL WITH MOB $0.00