11. NEW VIA AMENDMENT A00003 - Dwgs_Rev_G2_317.pdf

PDF 1 MB Posted

Attached to
Forest Service - M6 Road Slide Repair
Solicitation number
127EAW26Q0006
Issued by

About this file

This is a Schedule of Items drawing for the M6 Road Repair project under the United States Department of Agriculture Forest Service, Pacific Southwest Region (R05), located in the Mendocino National Forest's Upper Lake Ranger District. The document outlines nine work items with associated quantities, units of measure, and detailed scope descriptions for road repair and environmental restoration activities.

The project encompasses mobilization, construction surveying and staking, soil erosion and pollution control, clearing and grubbing with disposal methods, roadway excavation and embankment work (5,220 cubic yards), riprap installation (10 tons of Class 3 riprap), surface aggregate placement (183 tons), geocomposite drain system installation (852 square yards), temporary erosion control blankets (1,555 square yards), and temporary traffic control. Key specifications include proper culvert inlet and outlet placement with road alignment restoration; clearing of trees, brush, and root wads with merchantable logs over 12 inches diameter placed in designated deck locations and smaller material chipped and spread over disturbed areas; excavation to design depths with geogrid-reinforced fill placed in lifts no greater than 12 inches; riprap placement with nonwoven Type C geotextile underlayment; and installation of geocomposite drain walls with 6-inch perforated pipe, 8-inch corrugated metal pipe with screen, drain rock, and geotextile filter. The work is subject to an approved Pollution and Erosion Control Plan and Traffic Control Plan maintained throughout the project duration.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

3/

/2

:1

G

EO

R

G E.

B U

TL

ER

D :\M

N F\

M 6_

R O

A D

R

EP

A

IR

\D W

G S\

M 6_

FI

LL

FA

IL

_S H

EE

T-

G 2_

R

EV

.D W

G

(R05)

PACIFIC SOUTHWEST

M6 ROAD REPAIR S15

MENDOCINO

NATIONAL FOREST

UPPER LAKE

RANGER DISTRICT

SCHEDULE AND

NOTES

G BUTLER

G BUTLER

F. RICO

NOTES TO THE SCHEDULE OF ITEMS

15201 WORK FOR THIS ITEM INCLUDES NECESSARY MEASURES TO ENSURE PROPER

PLACEMENT (HORIZONTAL AND VERTICAL/ELEVATION) OF THE CULVERT INLET AND

OUTLET AND TO RESTORE THE ROAD ALIGNMENT AND WIDTH.

15701 WORK FOR THIS ITEM WILL INCLUDE ALL EQUIPMENT, MATERIALS, AND LABOR

NECESSARY TO PERFORM THE REQUIREMENTS OF THE APPROVED POLLUTION AND

EROSION CONTROL PLAN. THIS ITEM COVERS ALL PHASES OF THE CONTRACT.

15713 THIS WORK INVOLVES THE REMOVAL OF ALL TREES, BRUSH, ROOT WADS, AND DEAD

TREES AND LIMBS FROM THE AREAS TO BE EXCAVATED, MERCHANTABLE LOGS

(OVER 12" DIAMETER) WILL BE PLACED IN A DECK AS DIRECTED BY THE CONTRACTING

OFFICER AT A LOCATION NEAR THE INTERSECTION OF M6 AND 19N59(S). LOGS UNDER

12: WILL BE PLACES ON SLOPES ADJACENT TO THE WORK AS DIRECTED BY THE

CONTRACTING OFFICER. TOPS, LIMBS, AND SMALL TREES MUST BE CHIPPED AND

SPREAD OVER THE DISTURBED AREAS AT THE COMPLETION OF ALL OTHER WORK.

20101 IN ACCORDANCE WITH SECTION 202.05, TOPS AND LIMBS SHALL BE SCATTERED PER

METHOD f ON ADJACENT AREAS BELOW THE ROAD AS INDICATED BY THE C.O. WITH APPROVAL OF THE C.O., THE CONTRACTOR MAY UTILIZE METHOD g (CHIPPING) WITH

PLACEMENT OF THE CHIPS AS INDICATED BY THE C.O. LIMITED MERCHANTABLE

TIMBER MAY BE PLACED ON ADJACENT AREAS AS INDICATED BY THE C.O. ANY

EXCESS TIMBER MUST BE DECKED ON NEARBY LANDING (DISPOSAL SITE).

20401 WORK FOR THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR

NECESSARY FOR THE EXCAVATION TO DESIGN DEPTHS AND THE PLACEMENT OF

BASE MATS AND THE CONSTRUCTION OF THE GEOGRID REINFORCED FILL TO THE

FINISHED GRADES AS SHOWN ON THE DRAWINGS, THE BACKFILL SHALL BE PLACED

AND COMPACTED IN LIFTS NO GREATER THAN 12". IT IS PRESUMED THAT THE

EXCAVATION WILL PRODUCE AMPLE BACKFILL MATERIAL. IN THE EVENT OF A

SHORTAGE, THE CONTRACTING OFFICER WILL IDENTIFY A LOCAL SOURCE FOR

SUITABLE MATERIAL.

25102 WORK FOR THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR REQUIRED

TO FURNISH AND PLACE THE RIPRAP AS SHOWN IN THE DRAWINGS. INCLUDED IS THE

NONWOVEN TYPE C GEOTEXTILE TO BE PLACED UNDER THE CLASS 2 RIPRAP.

30102 WORK FOR THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR REQUIRED

TO FURNISH AND PLACE, SHAPE, AND COMPACT THE SURFACE AGGREGATE ON THE

ROAD AFTER COMPLETION THE THE BACKFILL.

60504 WORK FOR THIS ITEM WILL INCLUDE ALL EQUIPMENT, MATERIALS AND LABOR

NECESSARY FURNISH AND INSTALL THE GEOCOMPOSITE DRAIN WALL AND

ASSOCIATED DRAINAGE FEATURES. INCLUDED ARE THE 6" PERFORATED AND

DOUBLE-WALL PIPE AND FITTINGS, THE 8" CMP W/ SCREEN, DRAIN ROCK, GEOTEXTILE

FILTER, AND RELATED HARDWARE. THE SPECIFIC REQUIREMENT FOR THE

GEOCOMPOSIT IS: SHEET DRAIN TYPE 1, CLASS 1, TYPE A,

62901 WORK FOR THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR REQUIRED

TO FURNISH AND INSTALL TYPE 3.B, 1(STAKES) EROSION CONTROL BLANKETS ON THE

DISTURBED AND NEWLY SHAPED FILL SLOPES ABOVE AND BELOW THE ROADWAY.

63501 THIS ITEM INCLUDES ALL EQUIPMENT, MATERIALS, AND LABOR TO ESTABLISH AND

MAINTAIN THE APPROVED TRAFFIC CONTROL PLAN FOR THE DURATION OF SITE

WORK.

SCHEDULE OF ITEMS

File details come from the government source that posted it. Updated .