This is a solicitation for a construction contract to rehabilitate scenic byway recreation sites in the Sierra National Forest. The United States Department of Agriculture Forest Service is seeking a small business contractor to perform site improvements across multiple locations, with a project value between $5,000,000 and $10,000,000. The contract (Solicitation Number 127EAW25R0024) covers work at several sites including Redinger Overlook, Ross Cabin, Fish Creek Campground, Mile High Vista, Soda Springs, Placer Campground, Sweet Water Campground, Wagner Campground, Little Jackass Campground, Arch Rock Vista Point, Bowler Campground, Jackass Meadow Vista, Portuguese Vista, Cold Springs Vista, Fresno Dome, and Goat Meadow.

Key project requirements include removing and replacing existing facilities, constructing hardened aggregate surfaces, installing vault toilet buildings, creating campsites with tent pads, placing concrete, installing signs, picnic tables, fire rings, food storage lockers, and constructing trash enclosures. The contract has a mandatory 150-calendar day performance period, with work to be completed between May 1st and October 15th. Proposals are due by 1300 PST on June 27th, 2025, to be submitted via email to Gregory Cunningham. No pre-proposal site visit will be held, and prospective offerors are expected to independently review the project locations. The solicitation uses a tradeoff source selection method, evaluating proposals based on past performance, work plan, key personnel, performance schedule, and price.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

127EAW25R0024

USDA FOREST SERVICE

PROCUREMENT & PROPERTY SERVICES (PPS)

CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION

3237 PEACEKEEPER WAY, SUITE 101

MCCLELLAN PARK, CA 95652

127EAW25R0024 - GAOA, Scenic Byway Rec Site Rehab Sierra National Forest

FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $5,000,000 and $10,000,000

Set Aside: Total Small Business Set Aside

IMPORTANT NOTES:

See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal

All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, June 12th, 2025.

A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

GREGORY.CUNNINGHAM@USDA.GOV

1149698

GREGORY CUNNINGHAM (530) 575-7569

1 OF 4205/27/2025

06/27/2025

1300 PST

10 Calender days

FAR 52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

E-mail:________________ UEI #:________________

7EAW

USDA FOREST SERVICE

PROCUREMENT & PROPERTY SERVICES (PPS)

CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION

Invoice Processing Platform, www.ipp.gov

GREGORY CUNNINGHAM

Solicitation No: 127EAW25R0024 Project Name: GAOA, Scenic Byway Rec Site Rehab

Table of Contents

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

B.2 SCHEDULE NOTES

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

C.2 PROJECT LOCATON

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

C.4 TECHNICAL SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

SECTION E--INSPECTION AND ACCEPTANCE

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 INVOICES & PAYMENTS

G.2 CONTRACT ADMINISTRATION DATA

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

H.2 SPECIAL REQUIREMENTS

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 ATTACHMENTS

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K.1 PROVISIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

L.1 GENERAL INSTRUCTIONS

L.2 SUBMISSION OF PROPOSAL DOCUMENTS:

L.3 TECHNICAL PROPOSAL INSTRUCTIONS

L.4 PROVISIONS

SECTION M--EVALUATION FACTORS FOR AWARD

M.1 PROVISIONS

M.2 PROPOSAL EVALUATION

M.3 TECHNICAL EVALUATION FACTORS

M.4 EVALUATION RATINGS

M.5 AWARD DETERMINATION

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

ITEM DESCRIPTION PAY UNIT EST. QTY. UNIT PRICE

TOTAL

PRICE

151 Mobilization LS 1 $ $

REDINGER OVERLOOK

Accessible Ramp 4ftx7ftx4in (Concrete 4,000psi) w/detectable warning surface 4ft x 3ft. LPSM 1 $ $

9900 Paint Railing 72 ft x 2 ft. LPSM 1 $ $

Construct hardened aggregate surface (Includes, excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in

1100 SQFT)

CUYD

2872 Install bench (includes anchor) EACH 1 $ $

2883 Furnish and install 1 Panel Bulletin Board EACH 1 $ $

2883 Furnish and install entrance sign EACH 1 $ $

2883 Furnish and install Accessible Sign EACH 1 $ $

Pavement markings for ADA area 60 in x

15 ft (2 coats) LPSM 1 $ $

Redinger Subtotal $

ROSS CABIN

2100 Remove and dispose existing single vault toilet. EACH 1 $ $ excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in trail pad, 5ft x 850ft)

Furnish and place aggregate on parking area, (Includes, 2" scarification, site preparation and placement of surface rock in compacted layer 25ft x50ft)

* 2735 Furnish and install double vault toilet building EACH 1 $ $

3200 Stamped Reinforced Concrete (4,000 psi) around Toilet CUYD 5 $ $

Furnish and install 8"x8"x4ft pressure treated posts w/1" chamfer on top. EACH 15 $ $

2883 Furnish and install 1 Panel Bulletin Board EACH 1 $ $

Reinforced Concrete Crossing 5ft x 6in x 60ft, (6-

CUYD -4,000 psi & 10 Tons - Trackout Rock). CUYD 6 $ $

2883 Furnish and install Accessible Sign EACH 1 $ $

2883 Furnish and install entrance sign EACH 1 $ $

2883 Furnish and install Stop Sign (30"x30") EACH 1 $ $

Ross Cabin Subtotal $

ITEM DESCRIPTION PAY UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

FISH CREEK CAMPGROUND

Remove and dispose existing entrance sign, single vault toilet. LPSM 1 $ $

2883 Furnish and install entrance sign EACH 1 $ $

2883 Furnish and install Stop Sign "R1-1" 30"x30" HIP EACH 1 $ $

2883 Furnish and install One Way sign EACH 1 $ $

Construct aggregate base parking spurs (Including excavation, site preparation, furnish & install surface base rock)

Construct aggregate base roads (Includes excavation, site preparation, furnish & installation of surface base rock along the road & pull out)

* 2735

Furnish and install double vault toilet building. (Including excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)

LPSM

Stamped Reinforced Concrete (4,000 psi) around toilet, see drawings CUYD 5 $ $

Furnish and install Single vault toilet building. (Including excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) around toilet, see drawings CUYD 5 $ $

Construct Single Campsites with tent pad (includes, excavation, grading and surface course material)

Approximately 700 SQFT/Each.(9 CUYD/Each) 4 Sites

Furnish and install 8"x8"x4ft pressure treated posts w/1" chamfer on top. EACH 9 $ $

2805 Furnish and install horizontal barrier (Site 1,2,3 &4) EACH 4 $ $

2873 Install picnic tables (includes anchor) EACH 4 $ $

2876 Install Fire Rings (includes anchor) EACH 4 $ $

2883 Install campsite markers EACH 4 $ $

Construction trash enclosure (includes concrete slab and the procurement and installation of the dumpster and wheel stop and Grading B aggregate base course aprons)

2883 Furnish and install 2 Panel Bulletin Board EACH 1 $ $

Furnish and Install Fee Tube including reinforced concrete EACH 1 $ $

Fish Creek CG Subtotal $

QTY.

UNIT

PRICE

TOTAL

PRICE

MILE HIGH VISTA

Remove and dispose existing asphalt at lookout

(Approximately 850 SQFT) LPSM 1 $ $

2883 Furnish and install entrance sign EACH 1 $ $

2883 Furnish and install Stop Sign "R1-1" 30"x30" HIP EACH 1 $ $

Install 2 panel bulletin boards (includes hardened aggregate surface) EACH 1 $ $

2883 Furnish and install Accessible Sign EACH 1 $ $

Pavement markings for ADA area 60 in x 15 ft &

Accessible ORAR 6ft x 20ft (2 coats) LPSM 1 $ $

Furnish and install 8"x8"x4ft pressure treated posts w/1" chamfer on top. EACH 4 $ $

2805 Furnish and install horizontal barrier EACH 2 $ $

Stamped Reinforced Concrete (4,000 psi) includes excavation, preparation and placement on lookout

850 SQFT-11CUYD and path to toilets 550 SQFT -7

CUYD).

2883 Furnish and install 2 Panel Bulletin Board EACH 1 $ $ excavation of a layer of 4", site preparation and pad, 5ft x 150ft x 4in) Approximately 10 CUYD

Construct Picnic Site (includes, excavation, grading and approximately 500 SQFT or approx. 7 CUYD of surface course material)

CUYD 7 $ $

Construction trash enclosure (includes concrete slab and the procurement and installation of the dumpster and wheel stop and Grading B aggregate base course aprons)

2873 Install picnic tables (includes anchor) EACH 2 $ $

2872 Install bench (includes anchor) EACH 2 $ $

Mile High Vista Subtotal $

QTY.

UNIT

PRICE

TOTAL

PRICE

SODA SPRINGS

Remove and dispose existing 2 bulletin boards, 2 dumpster enclosures, 18 existing picnic tables and 18 fire rings.

2883 Install entrance sign EACH 1 $ $

Construct trash enclosure (includes excavate 4in, concrete slab and the procurement and installation of the dumpster and wheel stop and grading b aggregate base course aprons)

2876 Furnish and Install fire ring. EACH 18 $ $

Install food lockers (includes hardened aggregate surface and black iron pipe) EACH 18 $ $

2873 Install picnic tables (includes anchor) EACH 18 $ $

Construct campsites w/tent pad (includes excavate 4 in, grading, furnish and place a compacted layer of surface course) Approxim 700 SQFT/each Or 9

CUYD/each (18 sites)

Construct aggregate base parking spurs (includes scarify 2", furnish, place, grade and compact a 4 in layer of base rock) Approximately 450 SQFT/Each or 6CUYD/each

(18 Sites)

Furnish and place a 4" layer of surface rock along the road (includes scarify 2", grading and compaction) CUYD 670 $ $

Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) in 2 sections

5ft x 50ft x 4in CUYD 8 $ $

Furnish and install horizontal barrier (Camp Site

1,2,5,6,7,8,12,13,15 & 18). EACH 10 $ $

2883 Install campsite markers (1-18) EACH 18 $ $

2883 Install campsite unit sign (1-8)&(9-17) EACH 2 $ $

Install 2 panel bulletin boards (includes hardened aggregate surface) EACH 1 $ $

Furnish and install a 24" Corrugated metal pipe

(Including 5 Tons of track rock 4ft x6 ft in outlet) LNFT 40 $ $

Furnish and Install Fee Tube including reinforced concrete EACH 1 $ $

Soda Springs Subtotal $

QTY.

UNIT

PRICE

TOTAL

PRICE

PLACER CAMGROUND

excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) in 2 sections 5ft x 50ft x 4in

CUYD 4 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface)

EACH 1 $ $

Placer CG Subtotal $

SWEET WATER CAMPGROUND

excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) in 2 sections 5ft x 50ft x 4in

CUYD 5 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface)

EACH 1 $ $

Sweet Water CG Subtotal $

WAGNER CAMPGROUND

excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) in 2 sections 5ft x 50ft x 4in

CUYD 3 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface)

EACH 1 $ $

Wagner CG Subtotal $

LITTLE JACKASS CAMPGROUND

Remove and dispose existing single vault concrete toilet building, bulletin board, 2 dumpster enclosure, 18 existing picnic tables and 18 fire rings.

Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way

EACH

Stamped Reinforced Concrete (4,000 psi) in 2 sections 5ft x 50ft x 4in

CUYD 4 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface)

EACH 1 $ $

Little Jackass CG Subtotal $

QTY.

UNIT

PRICE

TOTAL

PRICE

ARCH ROCK VISTA POINT

2883 Install Entrance Sign EACH 1 $ $

2805 Install post barriers EACH 10 $ $

Armor ditch, including excavation ditch V shape, 2ft x

8in x 210ft and placing track out rock. TONS 25 $ $ furnish and install rock dissipater with trackout rock

4"x6" TONS 8 $ $

Furnish and install 10 in Corrugated metal pipe LNFT 40 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface) EACH 1 $ $

Construct an accessible hardened aggregate surface ORAR (8 ft x 110 ft x 4 in) and trail (5ft x 450ft x

4in) Includes excavate 4", place material below trail, grading, importing and placing a 4" compacted layer with surface rock.

Arch Rock Vista Point Subtotal

BOWLER CAMPGROUND

2883 Furnish and install Stop Sign "R1-1" 30"x30" HIP EA 1 $ $

2883 Install entrance sign EA 1 $ $

Furnish and place a 4" layer of surface rock along the road (includes Grading and compaction)

TONS

Construct campsites (includes excavate 4 in, grading, furnish and place a compacted layer of surface course) Approximate 850 SQFT/each plus 2 tent pads each 260 SQFT/Each

SQFT

15532

2873 Install picnic tables (includes anchor) EACH 22 $ $

2876 Install Fire Rings (includes anchor) EACH 22 $ $

Install food lockers (includes hardened aggregate surface and black iron pipe) EACH 22 $ $ excavation, installation, backfill, clean up, one way

2805 Furnish and install horizontal barrier (Camp Site 7) EACH 1 $ $

2883 Install campsite markers EACH 11 $ $

Construct aggregate base parking spurs (includes excavate 4 in, grading, import and place base course) Approximately 850 SQFT/Each

Stamped Reinforced Concrete (4,000 psi) sections 440

SQFT CUYD 6 $ $

Construct trash enclosure (includes excavate 4in, concrete slab and the procurement and installation of the dumpster and wheel stop and grading b aggregate base course aprons)

Bowler CG Subtotal $

QTY.

UNIT

PRICE

TOTAL

PRICE

JACKASS MEADOW VISTA

2883 Furnish and install Accessible Sign EACH 1 $ $

2883 Install Entrance Sign EACH 1 $ $

Furnish and install single vault toilet building. (Including excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) sections 440

SQFT CUYD 6 $ $

excavation of a layer of 4", site preparation and pad, 5ft x 80ft x4in)

SQFT

2883 Furnish and install Stop Sign "R1-1" 30"x30" HIP EACH 2 $ $

9900 Paint parking stalls w/ 4" white lines. LNFT 80 $ $

9900 Paint ADA section 60'x15ft with 45 angle 4" blue lines LPSM 1 $ $

Jackass Meadow Vista Subtotal $

PORTUGUESE VISTA

Furnish and install Steel bridge railing (2 Layers type II, class B) LNFT 60 $ $

2883 Furnish and Install Entrance Sign EACH 1 $ $

617 Furnish and install terminal section Type G4-CRT EACH 1 $ $

Install 1 panel bulletin boards (includes hardened aggregate surface) EACH 1 $ $

9900 Paint Railing (50ftx20in) LPSM 1 $ $

Portuguese Vista Subtotal $

COLD SPRINGS VISTA

2883 Install Entrance Sign EACH 1 $ $

Remove and dispose 1 existing double vault concrete toilet buildings. (Including 15 CUYD to backfill empty space for one site) excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) 1 section 440

SQFT CUYD 6 $ $

Cold Springs Vista Subtotal $

FRESNO DOME

excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) sections 440

SQFT CUYD 6 $ $

Fresno Dome Subtotal $

GOAT MEADOW

excavation, installation, backfill, clean up, one way

Stamped Reinforced Concrete (4,000 psi) sections 440

SQFT CUYD 5 $ $

Goat Meadow Subtotal $

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE

DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name: POC & Title:

Email: Phone Number:

UEI Number: Tax ID:

COMBINED TOTAL = $

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

This project consists of the combination of two GAOA projects. Project GAOA #1 is to replace toilets that are in poor condition. The second GAOA project is to rehabilitate recreation sites, vista points and Campgrounds. Work items for project #1 can identified in the schedule of items with an asterisk (*) before the item number.

This project consists of, but not limited to, furnishing all labor, equipment, materials, and incidentals necessary to conduct clearing and grubbing, demolition and removal of existing facilities, excavation, rehabilitation and new construction of campsites, including single, double & group camp sites, construction of tent pads, outdoor recreation access routes (ORARS), installation of vault toilet buildings, placement of additional aggregate base material, re-grading of base material, placement of new concrete, painted traffic markings, installation of facility signs, installation of picnic tables, service tables, fire rings, food storage lockers, installation of wheel stops, furnish & installation of aggregate base, and all other aspects shown on the project plans.

See attachment “1. Statement of Work” for further details.

C.2 PROJECT LOCATON

Multiple locations throughout the Sierra National Forest. See attached project maps for detailed locations.

C.3 MAGNITUDE OF CONSTRUCTION PROJECT

FAR 32.204 - Disclosure of Magnitude of the Construction Project:

• Between $5,000,000 and $10,000,000

C.4 TECHNICAL SPECIFICATIONS

Technical Specifications: See Section J for Statement of Work and other pertinent information.

Section J of this contract contains Supplemental and Special Project Specifications that supplement and/or modify the Standard Specifications. The Standard, Supplemental, and Special Project Specifications shall all be used in conjunction with each other to properly determine the correct specification for each Pay Item in the Schedule of Items.

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D-2 PROJECT LABELING FOR OFFICIAL COORESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The

Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-18 Variation in Estimated Quantity (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 Calander days: anticipated start July 2025. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 INVOICES & PAYMENTS

All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.

This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.

Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s).

Itemized invoice shall include at a minimum:

Contractor Name & Address Contract, Task Order or Purchase Order numbers Invoice Number Description of Services or work completed Date of services or completion.

G.2 CONTRACT ADMINISTRATION DATA

1. Contract Award. A written award or acceptance of offer mailed or otherwise furnished to the

Contractor shall result in a binding contract without further action by either party.

2. Notice to Proceed. The Contractor shall commence work upon receipt of a properly executed https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

Notice to Proceed.

3. Changes. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract the said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

4. Unauthorized Instructions from Government or Other Personnel. The Contractor shall not accept instructions issued by any person employed by the U.S. Government or otherwise other than the Contracting Officer, or the authorized representative of the Contracting Officer acting within the limits of his/her authority.

5. Designation of Contracting Officer’s Representative (COR). Designation will be made upon contract award and a copy of the designation letters will be furnished to the Contractor. Limits of authority are described in each designation letter.

6. Designation of Authorized Representative of the Contractor. The Contractor shall assign a member or employee who will act as Project Manager during the course of this contract or during the course of this project. The official shall be responsible for affording liaison between the contract forces and the contracting offices. This designation shall be in writing and a copy furnished to the Contracting Officer.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

Key Personnel

(a) The Contractor shall assign to this contract the following key personnel:

i. Project Manager

ii. Project Superintendent

iii. Quality Control Manager

iv. Project Safety Manager

v. After-Hours Emergency Contact

vi. Signature Authority for Contract Mod

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.2 SPECIAL REQUIREMENTS

Emergencies Fire Plan

[ X ]See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.

Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J):

[ ](a) Trail Construction - 100 meters on either side of the centerline [ ](b) Construction of Structures - 100 meters around the perimeter of the project [ ](c) Road Construction - 400 meters on either side of the centerline [ X ](d) Special for this project: See attached Fire Plan.

Utility Services The contractor is responsible for water, electricity, and restrooms. They may be available at the site if coordinated prior to usage.

Superintendence by Contractor In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.

Loss, Damage or Destruction Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.

Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor their personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.

Archaeological and Historic Sites Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.

Spill Plan

If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.

Equipment Cleaning All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.

Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.

If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.

Work Limit Items All construction activity shall be performed during the period between May 1st and Oct 15th.

Any ground disturbing work not completed by Oct 15th shall be winterized. Ground disturbing work may resume on May 1st of the following year. Winterization shall consist of placing wood chips on all disturbed areas at the direction of the COR, aggregate material (if asphalt work is not complete), covering of stockpiles, leaving the site in a safe condition and allowing for use of the site by the Forest Service or its assignees. Winterization shall be at the contractor’s expense if the work is not completed by October 15th.

Work may continue past Oct 15th if the foundation and any other ground disturbing work have been completed. Materials may only be staged from hardened surfaces such as pavement or concrete.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) https://www.acquisition.gov/browse/index/far

Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of

Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN

2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment (AUG 2020) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (MAY

2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017)52.223-5 Pollution

Prevention and Right-to-Know Information (MAY 2011) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

(MAY 2024) (DEVIATION FEB 2025)

52.223-6 Drug-Free Workplace (MAY 2001) https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN

2016) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate II (APR 1984) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Products and Commercial Services (NOV 2023) 52.246-21 Warranty of Construction (MAR 1994)

Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEP

1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.253-1 Computer Generated Forms (JAN 1991) 452.204-70 Modification for Contract Closeout 452.204-71 Personal Identity Verification of Contractor Employees 452.236-70 Emergency Response, Fire Suppression, and Liability

52.225-9 Buy American Act-Construction Materials (OCT 2022)

(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal

Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if– (A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all component used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners.

Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together.

Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the

United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)).

The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy

American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.

(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1) (i)Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .