This document is a detailed Schedule of Items for the GAOA Scenic Byway Recreation Site Rehabilitation project in Sierra National Forest, Madera County. The project involves comprehensive rehabilitation and construction work across multiple sites including Redinger Overlook, Ross Cabin, Fish Creek Campground, Mile High Vista, Soda Springs, Placer CG, Sweet Water CG, Wagner CG, Little Jackass CG, Arch Rock Vista Point, Bowler CG, Jackass Meadow Vista, Portuguese Vista, Cold Springs Vista, Fresno Dome Vista Point, and Goat Meadow.
Key scope of work includes installing/removing vault toilets, constructing hardened aggregate surfaces, installing picnic tables, fire rings, food lockers, entrance signs, stop signs, bulletin boards, concrete work, site grading, constructing campsites with tent pads, and installing barriers and site markers. The project is a Total Small Business Set Aside with a projected contract value between $5,000,000 and $10,000,000, issued by the Department of Agriculture Forest Service under solicitation number 127EAW25R0024. Requests for information were due by June 12th, 2025, and the project sites are open for individual prospective offeror inspection without a formal pre-proposal site visit.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
GAOA SCENIC BYWAY RECREATION SITE REHABILITATION
SIERRA NATIONAL FOREST
MADERA COUNTY Revised 6/20/2025
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 151 |
| Mobilization |
| LS |
| 1 |
| $ |
| $ |
REDINGER OVERLOOK
| 3200 |
| Accesible Ramp 4ftx7ftx4in (Concrete 4,000psi) |
w/detectable warning surface 4ft x 3ft.
| LPSM |
| 1 |
| $ |
| $ |
| 9900 |
| Paint Railing 72 ft x 2 ft. |
| LPSM |
| 1 |
| $ |
| $ |
Construct hardened aggregate surface (Includes, excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in 1100 SQFT)
CUYD
| 2872 |
| Install bench (includes anchor) |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install 1 Panel Bulletin Board |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install entrace sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Accesible Sign |
| EACH |
| 1 |
| $ |
| $ |
| 9900 | |
| Pavement markings for ADA | area 60 in x |
15 ft (2 coats)
| LPSM |
| 1 |
| $ |
| $ |
| Redinger Subtotal |
| $ |
ROSS CABIN
| 2100 |
| Remove and dispose exisitng single vault toilet. |
| EACH |
| 1 |
| $ |
| $ |
Construct hardened aggregate surface (Includes, excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in trail pad, 5ft x 850ft)
CUYD
Furnish and place aggergate on parking area, (Includes, 2" scarification, site preparation and placement of surface rock in compacted layer 25ft x50ft)
CUYD
| * 2735 |
| Furnish and install double vault toilet building |
| EACH |
| 1 |
| $ |
| $ |
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) around Toilet |
| CUYD |
| 5 |
| $ |
| $ |
| 2805 |
| Furnish and install 8"x8"x4ft presure treated posts w/1" |
chamfer on top.
| EACH |
| 15 |
| $ |
| $ |
| 2883 |
| Furnish and install 1 Panel Bulletin Board |
| EACH |
| 1 |
| $ |
| $ |
| 3200 |
| Reinforced Concrete Crossing 5ft x 6in x 60ft, (6- |
CUYD -4,000 psi & 10 Tons - Trackout Rock).
| CUYD |
| 6 |
| $ |
| $ |
| 2883 |
| Furnish and install Accesible Sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install entrace sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Stop Sign (30"x30") |
| EACH |
| 1 |
| $ |
| $ |
| Ross Cabin Subtotal |
| $ |
Updated 6/20/2025
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Fish Creek CG
| 2100 |
| Remove and dispose exisitng entrance sign, single vault |
toilet.
| LPSM |
| 1 |
| $ |
| $ |
| 2100 |
| Removal & disposal of deberis. Placement of trees on |
left side on entrance road.
| LPSM |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install entrace sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install One Way sign |
| EACH |
| 1 |
| $ |
| $ |
Construct aggregate base parking spurs (Including excavation, site preparation, furnish & install surface base rock)
CUYD
Construct aggregate base roads (Includes excavation, site preparatoin, furnish & installation of surface base rock along the road & pull out)
CUYD
Embankment Material, (Includes excavation, site preparatoin, furnish & installation of embankement material to repair erosion on area near Fee tube and sinlge toilet).
CUYD
* 2735 Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) around double |
vault toilet, see drawings
| CUYD |
| 6 |
| $ |
| $ |
Furnish and install Single vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) around single |
vault toilet, see drawings
| CUYD |
| 5 |
| $ |
| $ |
Construct Single Campsites with tent pad (includes, excavation, grading and surface course material) Approximately 700 SQFT/Each.(9 CUYD/Each) 4 Sites
CUYD
| 2805 |
| Furnish and install 8"x8"x4ft presure treated posts w/1" |
chamfer on top.
| EACH |
| 9 |
| $ |
| $ |
| 2805 |
| Furnish and install horizontal barrier (Site 1,2,3 &4) |
| EACH |
| 4 |
| $ |
| $ |
| 2873 |
| Install picninc tables (includes anchor) |
| EACH |
| 4 |
| $ |
| $ |
| 2876 |
| Install Fire Rings (includes anchor) |
| EACH |
| 4 |
| $ |
| $ |
| 2877 |
| Install food lockers (includes hardened aggregate surface |
and black iron pipe)
| EACH |
| 4 |
| $ |
| $ |
| 2883 |
| Install campsite markers |
| EACH |
| 4 |
| $ |
| $ |
Construction trash enclosure (includes concrete slab and the procurement and installation of the dumpster and wheel stop and Grading B aggregate base course aprons)
LPSM
| 2883 |
| Furnish and install 2 Panel Bulletin Board |
| EACH |
| 1 |
| $ |
| $ |
| 3200 |
| Furnish and Install Fee Tube including reinforced |
concrete
| EACH |
| 1 |
| $ |
| $ |
| Fish Creek CG Subtotal |
| $ |
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Mile High Vista
| 2100 |
| Remove and dispose existing asphalt at lookout |
(Approximately 850 SQFT)
| LPSM |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install entrace sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Install 2 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Accesible Sign |
| EACH |
| 1 |
| $ |
| $ |
| 9900 |
| Pavement markings for ADA area 60 in x 15 ft & |
Accesible ORAR 6ft x 20ft (2 coats)
| LPSM |
| 1 |
| $ |
| $ |
| 2805 |
| Furnish and install 8"x8"x4ft presure treated posts w/1" |
chamfer on top.
| EACH |
| 4 |
| $ |
| $ |
| 2805 |
| Furnish and install horizontal barrier |
| EACH |
| 2 |
| $ |
| $ |
Stamped Reinforced Concrete (4,000 psi)includes exacavation, preration and placement on lookout 850 SQFT-11CUYD and path to toilets 550 SQFT -7 CUYD).
CUYD
| 2883 |
| Furnish and install 2 Panel Bulletin Board |
| EACH |
| 1 |
| $ |
| $ |
Construct hardened aggregate surface (Includes, excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in trail pad, 5ft x 150ft x 4in) Approximately 10 CUYD
CUYD
Construct Picnic Site (includes, excavation, grading and approximately 500 SQFT or approx 7 CUYD of surface course material)
CUYD
Construction trash enclosure (includes concrete slab and the procurement and installation of the dumpster and wheel stop and Grading B aggregate base course aprons)
EACH
| 2873 |
| Install picninc tables (includes anchor) |
| EACH |
| 2 |
| $ |
| $ |
| 2872 |
| Install bench (includes anchor) |
| EACH |
| 2 |
| $ |
| $ |
| 9900 |
| Paint Railing 65 ft x 3.5 ft. |
| LPSM |
| 1 |
| $ |
| $ |
| Mile High Vista Subtotal |
| $ |
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
SODA SPRINGS
Remove and dispose existing 2 bulletin boards, 2 dumpster enclosures, 18 existing picnic tables and 18 fire rings.
LPSM
| 2883 |
| Install entrance sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install One Way sign |
| EACH |
| 1 |
| $ |
| $ |
Construct trash enclosure (includes excavate 4in, concrete slab and the procurement and installation of the dumpster and wheel stop and grading b aggregate base course aprons)
LPSM
Construct trash enclosure (includes excavate 4in, concrete slab and the procurement and installation of the dumpster and wheel stop and grading b aggregate base course aprons)
LPSM
| 2876 |
| Furnish and Install fire ring. |
| EACH |
| 18 |
| $ |
| $ |
| 2877 |
| Install food lockers (includes hardened aggregate surface |
and black iron pipe)
| EACH |
| 18 |
| $ |
| $ |
| 2873 |
| Install picnic tables (includes anchor) |
| EACH |
| 18 |
| $ |
| $ |
Construct campsites w/tent pad (includes excavate 4 in, grading, furnish and place a compacted layer of surface course) Approxim 700 SQFT/each Or 9 CUYD/each (18 sites)
CUYD
Construct aggregate base parking spurs (includes scarify 2", furnish, place, grade and compact a 4 in layer of base rock) Approximately 450 SQFT/Each or 6CUYD/each (18 Sites)
CUYD
Furnish and place a 4" layer of surface rock along the road (includes scarify 2", grading and compaction)
CUYD
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) in 2 sections |
5ft x 50ft x 4in
| CUYD |
| 8 |
| $ |
| $ |
| 2805 |
| Furnish and install horizontal barrier (Camp Site |
1,2,5,6,7,8,12,13,15 & 18).
| EACH |
| 10 |
| $ |
| $ |
| 2883 |
| Install campsite markers (1-18) |
| EACH |
| 18 |
| $ |
| $ |
| 2883 |
| Install campsite unit sign (1-8)&(9-17) |
| EACH |
| 2 |
| $ |
| $ |
| 2883 |
| Install 2 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| 2722 |
| Furnish and install a 24" Corrugated metal pipe |
(Including 5 Tons of track rock 4ft x6 ft in outlet)
| LNFT |
| 40 |
| $ |
| $ |
| 3200 |
| Furnish and Install Fee Tube including reinforced |
concrete
| EACH |
| 1 |
| $ |
| $ |
| SODA SPRINGS Subtotal |
| $ |
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Placer CG
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) in 2 sections |
5ft x 50ft x 4in
| CUYD |
| 4 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| Placer CG Subtotal |
| $ |
Sweet Water CG
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) in 2 sections |
5ft x 50ft x 4in
| CUYD |
| 5 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| Sweet Water CG Subtotal |
| $ |
Wagner CG
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) in 2 sections |
5ft x 50ft x 4in
| CUYD |
| 3 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| Wagner CG Subtotal |
| $ |
Little Jackass CG
Remove and dispose existing single vault concrete toilet building, bulletin board, 2 dumpster enclosure, 18 existing picnic tables and 18 fire rings.
LPSM
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) in 2 sections |
5ft x 50ft x 4in
| CUYD |
| 5 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| Little Jackass CG Subtotal |
| $ |
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Arch Rock Vista Point
| 2883 |
| Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
| 2805 |
| Install post barriers |
| EACH |
| 10 |
| $ |
| $ |
| 2345 |
| Armor ditch, including excavation ditch V shape, 2ft x |
8in x 210ft and placing track out rock.
| TONS |
| 25 |
| $ |
| $ |
| 2345 |
| furnish and install rock dissipater with trackout rock |
4"x6"
| TONS |
| 8 |
| $ |
| $ |
| 2345 | |
| Furnish and install 10 in | Corrugated metal |
pipe
| LNFT |
| 40 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
Construct an accesible hardened aggregate surface ORAR (8 ft x 110 ft x 4 in) and trail (5ft x 450ft x 4in)Includes excavate 4", place material below trail, grading, importing and placing a 4" compacted layer with surface rock.
CUYD
| Arch Rock Vista Point Subtotal |
| $ |
Bowler CG
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EA |
| 1 |
| $ |
| $ |
| 2883 |
| Install entrance sign |
| EA |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install One Way sign |
| EACH |
| 1 |
| $ |
| $ |
Furnish and place a 4" layer of surface rock along the road (includes Grading and compaction)
TONS
Construct campsites (includes excavate 4 in, grading, furnish and place a compacted layer of surface course) Approxim 850 SQFT/each plus 2 tent pads each 260 SQFT/Each
SQFT
15532
| 2873 |
| Install picnic tables (includes anchor) |
| EACH |
| 22 |
| $ |
| $ |
| 2876 |
| Install Fire Rings (includes anchor) |
| EACH |
| 22 |
| $ |
| $ |
| 2877 |
| Install food lockers (includes hardened aggregate surface |
and black iron pipe)
| EACH |
| 22 |
| $ |
| $ |
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 2805 |
| Furnish and install horizonral barrier (Camp Site 7) |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Install campsite markers |
| EACH |
| 11 |
| $ |
| $ |
Construct aggregate base parking spurs (includes exavate 4 in, grading, import and place base course) Approximately 850 SQFT/Each
CUYD
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) sections 440 |
SQFT
| CUYD |
| 6 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
Construct trash enclosure (includes excavate 4in, concrete slab and the procurement and installation of the dumpster and wheel stop and grading b aggregate base course aprons)
EACH
| Bowler CG Subtotal |
| $ |
| ITEM |
| DESCRIPTION |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Jackass Meadow Vista
| 2883 |
| Furnish and install Accesible Sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
Furnish and install single vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) sections 440 |
SQFT
| CUYD |
| 6 |
| $ |
| $ |
Construct hardened aggregate surface (Includes, excavation of a layer of 4", site preparation and placement of surface rock in compacted layer in trail pad, 5ft x 80ft x4in)
SQFT
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 2 |
| $ |
| $ |
| 9900 |
| Paint parking stalls w/ 4" white lines. |
| LNFT |
| 80 |
| $ |
| $ |
| 9900 |
| Paint ADA section 60'x15ft with 45 angle 4" blue lines |
| LPSM |
| 1 |
| $ |
| $ |
| Jackass Meadow Vista Subtotal |
| $ |
Portuguese Vista
| 556 |
| Furnish and install Steel bridge railing (2 Layers type II, |
class B)
| LNFT |
| 60 |
| $ |
| $ |
| 2883 |
| Furnish and Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
| 617 |
| Furnish and install teminal section Type G4-CRT |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Install 1 panel bulletin boards (includes hardened |
aggregate surface)
| EACH |
| 1 |
| $ |
| $ |
| 9900 |
| Paint Railing (50ftx20in) |
| LPSM |
| 1 |
| $ |
| $ |
| Portuguese Vista Subtotal |
| $ |
Cold Springs Vista
| 2883 |
| Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
Remove and dispose 1 existing double vault concrete toilet buildings. (Including 15 CUYD to backfill empy space for one site)
LPSM
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
EACH
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 1 |
| $ |
| $ |
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) 1 section 440 |
SQFT
| CUYD |
| 6 |
| $ |
| $ |
| Cold Springs Vista Subtotal |
| $ |
Fresno Dome Vsta Point
| 2883 |
| Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
| 2883 |
| Furnish and install Stop Sign "R1-1" 30"x30" HIP |
| EACH |
| 1 |
| $ |
| $ |
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
LPSM
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) sections 440 |
SQFT
| CUYD |
| 6 |
| $ |
| $ |
| Fresno Dome Vsta Point Subtotal |
| $ |
Goat Meadow
| 2883 |
| Install Entrance Sign |
| EACH |
| 1 |
| $ |
| $ |
Furnish and install double vault toilet building. (Inluding excavation, installation, backfill, clean up, one way freight, vent screens, crane, 20 LNFT armor ditch and rock dissipater)
EACH
| 3200 |
| Stamped Reinforced Concrete (4,000 psi) sections 270 |
SQFT
| CUYD |
| 5 |
| $ |
| $ |
| Goat Meadow Subtotal |
| $ |
COMBINED TOTAL = $