NEW Attachment 12 - Request For Information Responses .pdf
PDF 137 KB Posted
- Attached to
- 127EAW24R0017 - Crestline Group CG Renovation
- Solicitation number
- 127EAW24R0017
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains the responses to a Request for Information (RFI) related to the federal contract opportunity "127EAW24R0017 - Crestline Group CG Renovation". The RFI responses provide details on government-furnished items such as signs, bulletin boards, and trash/recycle containers to be installed by the contractor. It also confirms the quantities for existing chain link fence to be removed and replaced, and the specifications for concrete block retaining walls. The RFI responses clarify that the campground will not be open to the public during construction, that a qualified person can serve as the Superintendent, QC Manager, and SSHO, and that soil boring reports are not available. The document also provides details on the removal of existing picnic tables and campground site signs. The related federal contract opportunity is a solicitation for a construction project between $250,000 and $500,000, set aside for small businesses, with a site visit scheduled for May 20, 2024 and RFIs due by May 21, 2024.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) RESPONSES
127EAW24R0017 - Crestline Group CG Renovation
RFI 1. Provide quantity/detail for government furnished signs to be installed by contractor.
Answer: Three (3) Government furnished site signs shall be installed by the contractor. The layout for the government furnished signs and a sample detail for the sign installation is attached. Arrangement of posts will vary from sample detail to allow for dimensions of government furnished signs, however overall appearance/orientation shall be the same. Smaller signs to be installed at intersections shall have two posts and shall meet MUTCD requirements. Contractor shall supply all hardware, posts, and supports required for installation.
RFI 2. Provide a detail for government furnished bulletin board to be installed by contractor.
Answer: The detail for the government furnished bulletin board to be installed by the contractor is attached.
RFI 3. Confirm Cleveland National Forest supplied trash container is the only trash container to be installed.
Answer: The only trash container to be installed will be supplied by the Government.
RFI 4. Confirm if contractor is to supply/install recycle container(s). Provide specification/product selection.
Answer: The Government shall supply the trash/recycle container for the contractor to install. Recycle container shall be Bearsaver CE Series Double Trash Enclosure, ADA Compliant (Item #HA2-CH). A sample detail drawing is attached.
RFI 5. Provide bidding quantity for LF of chain link fence to be removed and replaced.
Answer: The existing chain link fence to be removed is 334 linear feet. The new chain link fence shall be extended to reach the road by approximately 108 linear feet, for a total of approximately 442 linear feet.
RFI 6. Provide masonry specification for concrete block retaining wall.
Answer: Masonry specifications for the retaining walls have been added to the specifications. See Specification 32 32 19 Masonry Structure. The retaining wall for the dumpster pad and the retaining wall for the group area shall meet these specifications.
RFI 7. Confirm concrete block retaining wall to be 6” grey concrete masonry units.
Answer: Six inch (6”) concrete masonry units may be used, if they meet the requirements of Specification 32 32 19 Masonry Structure. Masonry units shall be split face, to match existing vault toilet building. See Specification 32 30 00 Site Improvements Section 2.3 Retaining Wall and Details A-C in the drawings.
RFI 8. Will the campground be open to the public during construction?
Answer: No, the campground will not be open to the public during construction.
RFI 9. Can 1 qualified person “triple hat” as the Superintendent, QC Manager and SSHO?
Answer: Yes, a qualified person can be the Superintendent, QC Manager, and SSHO.
RFI 10. Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.
Answer: No, soil boring reports are not available. It is not assumed that there will be no rocks or obstructions in the excavation areas. See Specification 31 20 00 Earth Moving.
FOR OFFICIAL USE ONLY
RFI 11. Provide quantity for existing tables to be removed.
Answer: Fourteen (14) existing picnic tables shall be removed.
RFI 12. Provide detail for campground site sign(s) to be removed.
Answer: There are no drawings for the existing bulletin board or site sign. The existing bulletin board has two (approximately) 8-inch diameter metal posts with concrete foundations and the existing site sign has two (approximately) 8-inch square wood posts with concrete foundations.