Attachment 1. Statement of Work.pdf

PDF 373 KB Posted

Attached to
127EAW24R0017 - Crestline Group CG Renovation
Solicitation number
127EAW24R0017
Issued by

About this file

This document is a Statement of Work for the Crestline Group Campground Renovation project, which is part of the related federal contract opportunity solicitation number 127EAW24R0017.

The Statement of Work outlines the scope of the project, which includes demolition of existing infrastructure and construction of new accessible concrete walkways, concrete pads, stabilized decomposed granite walkways, tent pads, picnic tables, benches, grills, fire pits, bulletin boards, signage, and other site improvements. The work must be completed within 60 calendar days from the issuance of the Notice to Proceed and adhere to Americans with Disabilities Act (ADA) and Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).

The related federal contract opportunity is a Total Small Business Set-Aside solicitation valued between $250,000 and $500,000. Requests for Information are due by May 21, 2024, and a pre-proposal site visit is scheduled for May 20, 2024. The contract requires the submission of several deliverables, including a Fire Plan, Work Plan, Stormwater Management Plan, Construction Waste Management Plan, and Spill Prevention and Response Plan.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRESTLINE GROUP CAMPGROUND RENOVATION

ATTACHMENT 1

STATEMENT OF WORK

1 SCOPE OF WORK

This project will include, but is not limited to the following:

Crestline Group Campground Renovation:

Demolition of existing asphalt walkways, concrete pads, picnic tables, grill, fire ring, benches, campground signage, existing bollards and chain link fencing, and clearing and grubbing.

Construction improvements include, but are not limited to the following; accessible concrete walkways, concrete pads, stabilized decomposed granite walkways and table pads, accessible campsite, tent pads, and installation of new picnic tables, benches, grill, fire pit, bulletin boards, site signage, trash and recycle containers, installation of wood bollards around roadway edge and replacement of chain link fencing on campground boundary, and installation of 6‐inch thick concrete dumpster pad with concrete block retaining wall.

Construction elements include, but are not limited to: site work, surveying, demolition, clearing and grubbing, excavation and placement, compaction, best management practices (BMP’s), aggregate base, portland cement concrete, concrete reinforcement and sampling and testing.

All site improvements shall meet the minimum requirements of Americans With Disabilities Act and Architectural Barriers Act guidelines (ADAABA) and the Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).

All work shall be performed in a manner to minimize ground disturbance.

A Forest Service archeological monitor shall be onsite during all ground disturbance and vegetation clearance. The contractor shall work closely with the Contracting Officer Representative (COR) to schedule required archeological oversight.

Total work time is 60 calendar days from the issuance of the Notice to Proceed.

2 PROJECT LOCATION

Crestline Group Campground– San Diego County, Palomar Ranger District

Travel north on I-15, take exit 46 towards CA-76 E. Continue on CA-76 for 20.5 miles. Take slight left onto S6 (South Grade Rd)/Palomar Mountain R. Continue for 6.7 miles, turn right onto S7 (East Grade Rd). Crestline Group Campground will be on the left.

PAGE 1 - STATEMENT OF WORK

PAGE 2 -STATEMENT OF WORK

3 FOREST CONTACT

For information regarding site conditions, contact Grace Bassett at (619) 984-0804 between the hours of 8:00 am and 4:00 pm, Monday through Friday, except legal holidays.

4 PROJECT MANAGEMENT

The contractor shall appoint a Project Manager and/or Engineer to coordinate all Contractor’s activities during construction and to liaise with the Contracting Officer Representative (COR) and/or Contracting Officer (CO), and Project Engineer for the USDA Forest Service. Engineer/Architect and Surveyor shall be licensed in the State of California. Contractor shall designate in writing an on-site superintendent to be on-site at all times that any construction activities take place and to coordinate all site work and activities.

5 GENERAL INFORMATION

Parking and Storage

The Contractor shall coordinate parking of their vehicles and temporary storage of equipment and materials with the Contracting Officer. Contractor shall have all heavy equipment washed prior to entering the project area to remove soil, seeds and plant material from noxious weeds to prevent the introduction and spread of weeds not already present on Palomar Ranger District or the Cleveland National Forest. Inspections shall be coordinated and scheduled with the Contracting Officer’s Representative.

6 SPECIFICATIONS

The Construction Specification Institute (CSI) specifications applicable to this contract are listed below:

00 01 10 TABLE OF CONTENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 23 SURVEY AND LAYOUT DATA

01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SUBMITTALS

01 40 00 QUALITY REQUIREMENTS

01 41 00 REGULATORY REQUIREMENTS

01 57 24 STORMWATER POLLUTION CONTROL

01 71 13 MOBILIZATION

01 74 00 CLEANING AND WASTE MANAGEMENT

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

02 41 00 DEMOLITION

03 11 00 CONRETE FORMING

03 20 00 CONCRETE REINFORCEMENT

03 30 00 CAST-IN-PLACE CONCRETE

31 10 00 SITE CLEARING

PAGE 3 - STATEMENT OF WORK

31 20 00 EARTH MOVING

32 30 00 SITE IMPROVEMENTS

32 31 13 CHAIN LINK FENCES AND GATES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 12 00 WATER UTILITY DISTRIBUTION EQUIPMENT

33 13 00 DISINFECTING OF WATER UTILITY DISTRIBUTION

7 DELIVERABLES

7-1 Fire Plan

See the Fire Plan for fire restrictions and requirements, emergency contact information, and fire project activity levels.

7-2 Work Plan

The Contractor(s) shall provide the Government with two (2) copies of the Work Plan for the project prior to mobilization. This Work Plan shall include, but is not limited to, the following:

Contractor’s Design Proposal A description of how the work will be performed.

Specific exclusions/ assumptions regarding the specific work to be performed.

A listing of personnel, including subcontractor(s), working on the project.

A list of equipment proposed for use on the project.

A Project Work Schedule.

Detailed cost estimate/ cost breakdown of work to be performed per Specification Section that can be used for partial payments as work is completed and accepted.

Description of what material(s) or method of concrete washout will be used on the project.

7-3 Storm Water Management Plan

Contractor shall develop an Erosion Control/Storm Water Control Plan. Contractor shall identify all types and specific locations of erosion control measures.

7-4 Construction Waste Management Plan

Contractor shall develop a proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this contract, including hazardous materials.

7-5 Spill Prevention Control and Countermeasures (SPCC), spill response plan and an emergency response plan for refueling and servicing vehicles.

Identify and use suitable measures around vehicle service, storage and refueling areas, and waste dumps to fully contain spills and avoid or minimize soil contamination and seepage to groundwater. Use suitable measures to avoid spilling fuels, lubricants, cleaners, and other

PAGE 4 - STATEMENT OF WORK

chemicals during handling and transporting. Report spills to the Contracting Officer’s Representative and initiate suitable cleanup action in accordance with applicable State and Federal laws, rules, and regulations.

7-6 Sampling, Testing, and Abatement Work Plan

Contractor shall develop a Sampling, Testing, and Abatement Work Plan for lead based paint, asbestos abatement, and contaminated soil from leaking vaults abatement.

END OF STATEMENT OF WORK