About this file

These are construction plans for the Kinney Creek Trail Bridge Replacement project, prepared by the U.S. Department of Agriculture Forest Service, Region 4, in the Payette National Forest's Council Ranger District, located in Adams County, Idaho. The project involves replacing Bridge No. 221-1.5 with a 40'-0" prefabricated steel truss bridge. The technical specifications require a weathering steel superstructure fabricated by an AISC certified plant, with timber components using specific wood grades and preservative treatments. Key construction requirements include using a helicopter for transport and installation, constructing native approaches with a maximum 6% grade, and removing non-native components of the existing bridge. The project documents include detailed plans for bridge geometry, materials, design loads, erection procedures, and environmental considerations, with a planned implementation date of 4/01/2025.

View the file

Other files for this federal contract opportunity

Other files attached to Kinney Creek Trail Bridge Replacement, newest first.
File Type Posted
Addtl Q_A 127EAV26Q0010.pdf PDF
SF 30 127EAV26Q0010.pdf PDF
Q_A 127EAV26Q0010.pdf PDF
A6 J3 Drawings 127EAV26Q0010.pdf PDF
A6 J6 Progress Schedule.rtf RTF text file
A6 J7 BiobasedStatementLetter.docx DOCX document
A6 J1 Schedule of Items 127EAV26Q0010.xlsx XLSX spreadsheet
A6 RFQ 127EAV26Q0010.pdf PDF
A6 J4 Wage Determination ID20240086.pdf PDF
A6 J5 Experience Questionnaire (FS 6300-27).docx DOCX document
A6 J2 Specifications 127EAV26Q0010.pdf PDF
A6 J8 DesignationofKTRKeyPersonnel-Reps.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NO.

SET NO.

PROJECT:

DATE:

SHEET INDEX

CONSTRUCTION PLANS

SHEET 1 TITLE

SHEET 2 SUMMARY OF QUANTITIES & GENERAL NOTES

SHEET 3 BRIDGE PLAN AND PROFILE VIEW

SHEET 4 TIMBER SILL ON GABION BASKET

SHEET 5 TIMBER SILL CONNECTION DETAIL AND

BEARING SHOE DETAIL

4/01/2025

KINNEY CREEK TRAIL

BRIDGE REPLACEMENT

N

KINNEY CREEK TRAIL BRIDGE

REPLACEMENT

BRIDGE NO. 221-1.5

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION FOUR

PAYETTE NATIONAL FOREST

COUNCIL RANGER DISTRICT

ADAMS COUNTY

AREA MAP

IDAHO INDEX MAP

PROJECT ENGINEER

PAYETTE NATIONAL FOREST

DATE

RECOMMENDED BY:

LOCATION MAP

APPROVED BY:

DESIGNED BY:

FOREST ENGINEER

PAYETTE NATIONAL FOREST

DATE

DISTRICT RANGER

PAYETTE NATIONAL FOREST

DATE

TO HELLS

CANYON

DAM

PROJECT LOCATION

TO OXBOW

DAM

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

GENERAL NOTES:

SPECIFICATIONS: MATERIALS AND CONSTRUCTION OF THIS STRUCTURE SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATION FOR

CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) AND STANDARD SPECIFICATIONS FOR CONSTRUCTION OF

TRAILS AND TRAIL BRIDGES ON FEDERAL PROJECTS.

MATERIALS: USE STEEL SHAPES, PLATES AND BARS OF WEATHERING STEEL CONFORMING TO AASHTO M270, GRADE 50W (ASTM A588 OR ASTM A242)

OR ASTM A847 FOR SQUARE AND RECTANGULAR TUBING. MINIMUM STEEL THICKNESS SHALL BE AS SPECIFIED IN THE GUIDE SPECIFICATIONS FOR

DESIGN OF PEDESTRIAN BRIDGES. USE HIGH STRENGTH BOLTS CONFORMING TO AASHTO M164, (ASTM A325), TYPE 3, UNLESS NOTED OTHERWISE.

USE MALLEABLE IRON WASHERS AGAINST WOOD.

STEEL FABRICATION: THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE SHALL BE FABRICATED BY AN AISC CERTIFIED PLANT - SIMPLE STEEL

BRIDGES OR COMPLEX STEEL STRUCTURES. WHEN STRUCTURAL STEEL IS TO BE WELDED, THE WELDING PROCEDURE SHALL BE IN ACCORDANCE

WITH AWS D1.1 & D1.5 AND SHALL BE SUITABLE FOR THE GRADE OF STEEL AND INTENDED USE OR SERVICE.

TIMBER & LUMBER: SOLID SAWN TIMBER MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF THE GRADING RULES AGENCY FOR

THE SPECIES, TYPE, AND GRADE SPECIFIED BELOW.

DECK PLANKS AND BACKING PLANKS

- COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.1 GRADE, GRADING RULES AGENCY - WWPA, WCLIB

RUNNING PLANKS AND RUB RAIL

- COASTAL REGION DOUGLAS FIR - LARCH ROUGH SAWN NO.2 GRADE, GRADING RULES AGENCY - WWPA, WCLIB

RAILS, HANDRAILS UNTREATED

- REDWOOD, S4S, NO.2 GRADE GRADING RULES AGENCY - RIS

- WESTERN RED CEDAR, S4S, SELECT STRUCTURAL GRADE GRADING RULES AGENCY - WWPA, WCLIB

RAILS, HANDRAILS TREATED

- HEM - FIR/DOUGLAS FIR, S4S, NO.1 GRADE GRADING RULES AGENCY - WWPA, WCLIB

DESIGN: THE SUPERSTUCTURE AND SUBSTRUCTURE DESIGN SHALL BE PERFORMED BY THE CONTRACTOR TO THE GEOMETRY SHOWN

ON THESE DRAWINGS AND SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE AASHTO LRFD GUIDE SPECIFICATION FOR

DESIGN OF PEDESTRIAN BRIDGES, CURRENT EDITION OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, AND THE DESIGN LOADS

SHOWN ON THESE DRAWINGS. PREFABRICATED STEEL SUPERSTRUCTURE DESIGN SHALL BE A TRUSS CONFIGURATION SIMILAR TO THAT SHOWN

ON THESE DRAWINGS. BRIDGE DESIGN SHALL PROVIDE CAMBER FOR 100% OF THE FULL DEAD LOAD DEFLECTION PLUS 1% OF BRIDGE SPAN. DESIGN

CALCULATIONS AND SHOP DRAWINGS SHALL BE STAMPED BY A LICENSED PROFESSIONAL ENGINEER. THE COMPLETED SHOP DRAWINGS AND

CALCULATIONS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION.

ERECTION/REMOVAL PLAN: THE CONTRACTOR SHALL SUBMIT AN ERECTION PLAN FOR THE PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE AND A

REMOVAL PLAN OF THE EXISTING TIMBER/STEEL BRIDGE TO THE C.O. FOR APPROVAL 30 DAYS BEFORE ERECTION IS SCHEDULED.

TREATMENT: PRESERVATIVE TREATMENT SHALL BE IN ACCORDANCE WITH THE CURRENT AMERICAN WOOD PROTECTION

ASSOCIATION (AWPA) SPECIFICATIONS USING THE TREATMENT MATERIALS LISTED BELOW. TREATMENT WILL COMPLY WITH THE

REQUIREMENTS OF THE CURRENT EDITION OF WESTERN WOOD PRESERVERS INSTITUTE (WWPI) "BEST MANAGEMENT PRACTICES

FOR THE USE OF TREATED WOOD IN AQUATIC ENVIRONMENTS". USE ONE OF THE TREATMENT TYPES SHOWN BELOW:

SUBSTRUCTURE, PILING, RETAINING WALLS AND CRIBBING - AWPA UC4C

- COPPER NAPHTHENATE IN HYDROCARBON SOLVENT A

- CCA

- ALTERNATE OIL-BASED PRODUCTS APPROVED BY COR

SUPERSTRUCTURE AND DECKING - AWPA UC4C

- COPPER NAPHTHENATE IN HYDROCARBON SOLVENT A

- ALTERNATE OIL-BASED PRODUCTS APPROVED BY COR

TIMBER WEARING SURFACE

- IF MECHANICAL LIFE < 10 YEARS, TREATMENT IS NOT REQUIRED

- IF MECHANICAL LIFE > 10 YEARS, TREATMENT IS REQUIRED

- IF TREATED - AWPA UC4A, EITHER OIL-BASED OR WATERBORNE TREATMENT OPTIONS AS BELOW.

RAILING POSTS AND RAIL BOARDS - AWPA UC4A

- COPPER NAPHTHENATE IN HYDROCARBON SOLVENT A

- ALTERNATE OIL-BASED PRODUCT APPROVED BY COR

- WATERBORNE TREATMENT SUCH AS ALKALINE COPPER QUAT (FORMULATION A, B, C, OR D), COPPER

AZOLES (FORMULATION B OR C), MICRONIZED COPPER AZOLES (FORMULATION C), OR EQUAL, APPROVED BY COR.

HARDWARE

- HARDWARE THROUGH OR INTO OIL-BASED TREATMENT SHALL BE HOT-DIPPED GALVANIZED PER ASTM A123.

- HARDWARE THROUGH OR INTO WATERBORNE TREATMENT SHALL BE STAINLESS OR HOT-DIPPED GALVANIZED PER

ASTM F593 OR ASTM A123. WOOD SCREWS AND CONSTRUCTION LAGS SHALL MEET ICC AC 257.

ADDITIONAL NOTES

- MATERIALS IN CONTACT WITH MARINE OR BRACKISH WATER SHALL COMPLY WITH CHAPTER 5 OF AWPA BOOK OF

STANDARDS.

- TREATMENT LEVELS SHOWN ABOVE ARE MINIMUM. INCREASED LEVELS ARE ALLOWED, IF APPROVED BY COR.

- USE WATERBORNE TREATMENT (AWPA UC4A) FOR RAILING POSTS AND RAIL BOARDS IN AREAS OF HIGH

PEDESTRIAN USE OR TO REDUCE ODOR.

- INDUSTRIAL ABSORBENT (E.G. ECOSORB OR APPROVED EQUAL) MAY BE APPLIED TO OIL-BASED TREATED

TIMBER TO REDUCE ODOR.

- FIELD TREAT ALL CUTS, BORES, HOLES AND OTHER ALTERATIONS MADE AFTER INITIAL PRESSURE TREATMENT

PROCESS, WITH 3 BRUSH COATS OF COPPER NAPHTHENATE OR ACCORDING TO AWPA M4.

- SEE FPL GENERAL TECHNICAL REPORT NO. 275 FOR AVAILABILITY AND USES OF TREATED TIMBER ALTERNATIVES.

DWG SHEET NO.

OF

SHEET

CHECKED

DESIGNER

DATE

DRAWING TITLE

PROJECT NAME

United States Department of Agriculture Forest Service

COUNCIL RANGER DISTRICT

PAYETTE NATIONAL FOREST

KINNEY CREEK TRAIL BRIDGE REPLACEMENT

INTERMOUNTAIN REGION

REGION 4 SUMMARY OF

QUANTITIES &

GENERAL NOTES

4/01/2025

S. THOMAS-FOX

B. DREIER

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

SCHEDULE OF ITEMS

APPROX. EL

2308.0'

Q2 EL 2311.0'

Q100 EL 2312.0'

BOTTOM OF GABION

ELEVATION @ A-1 = 2317.0'

CONSTRUCT NEW

NATIVE APPROACHES

FROM NATIVE MATERIAL

MAX GRADE 6%

(TYP. BOTH SIDES)

40'-0" PREFABRICATED STEEL TRUSS

NOTES:

1. CONTRACTOR SHALL SUBMIT AN ERECTION/REMOVAL PLAN FOR TRANSPORTING EQUIPMENT

AND MATERIALS, ERECTING NEW BRIDGE, AND REMOVING EXISTING BRIDGE, FOR REVIEW AND

APPROVAL BY THE CO 30 DAYS PRIOR TO CONSTRUCTION. HELICOPTER SHALL BE USED FOR

TRANSPORT, INSTALLATION AND REMOVAL WORK. BRIDGE ERECTION/REMOVAL PLAN SHALL

CLEARLY SPECIFY NUMBER OF FLIGHTS AND FLIGHT DAYS.

2. NON NATIVE COMPONENTS OF THE EXISTING BRIDGE SHALL BE REMOVED FROM THE PAYETTE

N.F. AND DISPOSED.

BOTTOM OF GABION

ELEVATION @ A-2 = 2317.0'

GABION @ A-1

BOTTOM OF GABION ELEV.

2317.00'

POINT TABLE

NO. COORDINATES

CL A1 ELEV 2317.00 N4999354 E522844

CL A2 ELEV 2317.00 N4999365 E522852

CL A1

EDGE OF TRAIL

APPROACH (TYP)

STREAM BANK

GABION @ A-2

BOTTOM OF GABION ELEV.

2317.00'

EDGE OF TRAIL

APPROACH (TYP)

CL A2

NATIVE APPROACHES

CONTRACTOR TO

COORDINATE FILL

AMOUNTS AND ALIGNMENT

WITH FINAL BRIDGE DECK

ELEVATION.

STREAM BANK

DWG SHEET NO.

OF

SHEET

CHECKED

DESIGNER

DATE

DRAWING TITLE

PROJECT NAME

United States Department of Agriculture Forest Service

COUNCIL RANGER DISTRICT

PAYETTE NATIONAL FOREST

KINNEY CREEK TRAIL BRIDGE REPLACEMENT

INTERMOUNTAIN REGION

REGION 4 BRIDGE PLAN AND

PROFILE VIEW

4/01/2025

S. THOMAS-FOX

B. DREIER

BRIDGE PLAN VIEW

NOT TO SCALE

BRIDGE PROFILE VIEW

NOT TO SCALE

AutoCAD SHX Text

KINNEY CREEK

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

964 - PREFABRICATED TRAIL BRIDGE PRE

964 - PREFABRICATED TRAIL BRIDGE PRE

Kinney Creek Trail Bridge.pdf
Sheets and Views
1 TITLE
2 SUMMARY OF QUANTITIES & GENERAL NOTES
3 BRIDGE PLAN AND PROFILE VIEW
STD_964-10-02a.pdf
STD_964-10-03.pdf

File details come from the government source that posted it. Updated .