R9_Ino_Shelter_Request_WR20192953.pdf

PDF 370 KB Posted

Attached to
Radio Shelters Federal contract opportunity
Solicitation number
12760419Q0028
Issued by
Department of Agriculture Forest Service Washington Office Acquisitions

About this file

Ino Shelter Request

View the file

Other files for this federal contract opportunity

Other files attached to Radio Shelters, newest first.
File Type Posted
Questions.docx DOCX document
R6_Drake_Peak_NEPA_Memo_WR20193029.pdf PDF
Shelter_PWS_April_8_2019.docx DOCX document
GPATLMRFY19LifeCycle.docx DOCX document
R6_Drake_Peak_Shelter_Request_WR20193029.pdf PDF
BOM.xlsx XLSX spreadsheet
R9_Ino_NEPA_LTF_WR20192953.docm DOCM document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Telecommunications Shelter Request Form

SCOPE: This PROPOSAL covers: Replacement Radio Communications Shelter New Shelter with Service Request #:

Prepared By: Date Prepared:

Site Name:

RADIO SHELTER LOCATION

District: City: County: State: Region: Forest:

Location Description:

Site Longitude: W ⁰ ' "

SA Longitude: W ⁰ ' "

Site Elevation: Ft.

SA Elevation: Ft.

Location Site Latitude: N ⁰ ' "

' " Staging area Latitude: N ⁰ Staging Area driving directions:

Shelter delivery address:

Logistics Is the local Forest able to offload the shelter from the delivery truck?

Yes, the equipment to be used is No, equipment will need to be scheduled through the contract

Will the shelter be able to be stored at this location until the time of install (up to a year)?

Site Access Is this a drive to site?

Yes: The road is in great condition, can handle heavy equipment, has no sharp turns and has plenty of room at the top for large equipment.

Yes: The road is drivable but will need a four-wheel drive and some preplanning/repair.

No: A helicopter install is necessary.

Description of installation site:

Other consideration for access to the site:

Other consideration for placement of the shelter:

(Combo or Key) Is there a perimeter fence?

Key access (POC)

Gate Locked?

Phone Number:

Site Info:

Site/Tower Hazards (Nearby cliffs, loose rock, other Shelters or towers etc).

Site accessibility? (Helicopter Only, Road condition, Large/ Heavy Truck Access, Obstructions, etc.)

Is this a High traffic area that would need special considerations? (Foot traffic, camp sites, etc.) No Yes explain:

General Considerations

Are utilities available? No Yes Access Restrictions or Concerns:

If access to the site is in disrepair will the Forest improve: No Yes, if no explain:

Where can the equipment (excavators & tractors, etc.) be stored?

Are there any requirements regarding inspection or washing of equipment to address noxious weed requirements?

No Yes, explain:

Will there be Special equipment required: Notes: Anything not covered above that might have an impact on the project?

Shelter Specifications:

Requested shelter size:

Will an attached monopole/tower need to be included: No Yes, if yes, Height needed ’

Total # of antennas Models of the FS antennas:

Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft

List identity and models of the Cooperator antennas:

Type Antenna @ ft belonging to Type Antenna @ ft belonging to Type Antenna @ ft belonging to Type Antenna @ ft belonging to

What direction should the tower articulate: West to East East to West Other:

Interior # of racks needed # radios to be installed Shelter wired for: AC DC additional options needed # of battery trays needed # Batteries to be installed Battery make/model:

HVAC Needed No Yes, If Yes which? Air Conditioning Heater Both

Exterior Solar No Yes, If Yes Mounted Top Side Both Other Direction for the door to face: North South East West

Additional solutions needed:

The vendor should provide the following services (please check all work need):

Demolish or remove existing Shelter. Existing Shelter weight: lbs. Size:

Additional considerations (specialty equipment needed, access, etc.):

Will the existing shelter be available for backhaul the day of install? Yes No If not, describe the plan for your existing shelter:

Where will the shelter be backhauled too:

Installation of shelter at site.

Special considerations not addressed already:

Custom shelter design needed. (Attach unique specifications to this request) Other :

Name of NEPA Document:

What is the topographic category of this site?

What is the wind speed at this site? Average mph Maximum mph Site radial ice loading:

Have NEPA, DM or LTF document been completed and approved?

Is the site listed as a Historical site?

Date:

No Yes explain:

@fs.fed.us

Is the site located on Private Land or will a Private Party need to be contacted:

Does the Engineering Staff concur that this shelter needs to be replaced?

Local Engineer Contact: Phone#: EMAIL:

Lands Use Have all other communication sites options (leased/collocation) been reviewed and discarded? No Yes Has it been determined that replacement is the only possible option? No Yes Other options considered:

Does this site have/require a Special use permit? No Yes If yes, has the Communication Site plan been completed? No Yes location:

Forest Special Use coordinator: Phone#: EMAIL: @fs.fed.us

Property

No Yes, if yes NRM ID# No Yes

Are any assets at the site on a Real Property Inventory?

Are any assets at the site on a Personal Property Inventory?

Forest Property Management Officer: Phone#: EMAIL: @fs.fed.us

Contact information:

@fs.fed.us @fs.fed.us @fs.fed.us

@fs.fed.us

Regional Radio Manager:

Radio Supervisor:

Local Service Technician:

COR NAME:

Local Forest/District contact:

Phone# Phone# Phone# Phone# Phone#

Email:

Email:

Email:

Email Email:

Yana Patton 530-226-2779 ypatton@fs.fed.us

Does the Forest Supervisor or District Ranger concur with this project? No Yes Will the Forest be supporting this project according to budgeting guidance in chapter 5b? No Yes http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&ca tegory=budget&icon=budget

@fs.fed.us Forest Supervisor or District Ranger Contact: Phone#: EMAIL:

CIO Project POC:

Forest Engineer Signature:

Forest Supervisor or District Ranger:

Site Specific Engineering

No Yes explain:

No Yes explain:

http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget

Are utilities available: Yes_2
No_3: Off
Yes if no explain: On
No_4: On
Yes explain: Off
No_5: On
Yes if yes Height needed: Off
East to West: Off
Other: Off
DC: On
additional options needed: Off
No_6: Off
Yes If Yes which Air Conditioning: On
Heater: Off
Battery makemodel: On
Both: Off
No_7: On
Yes If Yes Mounted Top: Off
Side: Off
Both_2: Off
Other_2: Off
undefined: Off
South: Off
East: Off
West: Off
undefined_2: Off
Demolish or remove existing Shelter Existing Shelter weight: On
Will the existing shelter be available for backhaul the day of install: Yes_3
Installation of shelter at site: Off
Custom shelter design needed Attach unique specifications to this request: Off
Other_3: Off
Have all other communication sites options leasedcollocation been reviewed and discarded: Yes_5
Has it been determined that replacement is the only possible option: Yes_6
Does this site haverequire a Special use permit: Yes_7
No_14: Off
Yes location: On
No_15: Off
Yes if yes NRM ID: Off
Are any assets at the site on a Personal Property Inventory: No_16
Does the Forest Supervisor or District Ranger concur with this project: Yes_9
Will the Forest be supporting this project according to budgeting guidance in chapter 5b: Yes_10
Check Box2: Yes
Check Box3: Off
No A helicopter install is necessary: Off
Yes The road is drivable but will need a fourwheel drive and some preplanningrepair: Off
Yes The road is in great condition can handle heavy equipment has no sharp turns and has plenty of: On
SR #:
Text2: Chris Reynolds
Date: 11/1
Site name: INO
Text5: 09
Forest: Chequamegon-Nicolet
District: Washburn
City: Ino
County: Bayfield
State: WI
Text15: 46
Text16: 31
Text17: 28.08
Text18: 91
Text19: 16
Text20: 19.23
Text21: 1244
Check Box23: Yes
Check Box24: Off
Text25: 46
Text26: 40
Text27: 27.6
Text28: 90
Text29: 53
Text30: 23.31
Text31: 671
Text32: Garage area on east side of HWY 13. Across from district office.
Text33: Forest Rd 234B, Mason, WI 54856
Text34:
Check Box35: Off
Check Box36: Yes
Dropdown39: [Yes]
Text41: Site is a large communications site. There are multiple shelters in fenced in area.
Text42: Shelter is next to fence. A crane could pick shelter over fence.
Text43:
Dropdown44: [Yes]
Dropdown45: [Yes]
Text45: Forest Service Key
Text46: Chris Reynolds
Text47: 7158914958
Text48: Tower and other shelters
Text49: Solid forest gravel road.
Text50:
Text51:
Text52:
Text53: Staging Area
Text54:
Text55:
Text56: 8X10
Text57: 0
Text59:
Text65:
Text66:
Text67:
Text68:
Text69:
Text71:
Text70:
Text58:
Text62:
Text63:
Text64:
Text61:
Text72:
Text73:
Text74:
Text75:
Text76:
Text77:
Text78:
Text79:
Text80:
Text81:
Text82:
Text83:
Text84:
Text85:
Text86:
Text88: 1
Text87: 2
Text89:
Text90: 2
Text91: 2
Text92:
Text93: 2000
Text94: 6 X8
Topo Category: [Cat 3- Structures on the upper half of hill]
Dropdown96: [30]
Dropdown97: [140]
Dropdown98: [.25"]
Check Box100: Yes
Text101: 20181108_InoTowerReplaceLTF
Text102: 11/8/18
Check Box99: Off
Check Box104: Off
Text103:
Text104:
Check Box105: Yes
Check Box103: Yes
Check Box106: Off
Text105:
Dropdown106: [Yes]
Text107: Mark Beuning
Text108: 715-362-1377
Text109: mbeuning
Text110:
Text111: John Mcneil
Text112: 715-762-5154
Text113: jdmcneill
Text114:
Text115: camicheletti
Text116: Chris Micheletti
Text117: 715-362-1328
Text118: Kevin Throop
Text119: 414-297-3840
Text120: kthroop
Text121: Kevin Throop
Text122: 414-297-3840
Text123: kthroop
Text124: Chris Reynolds
Text125: 715-891-4958
Text126: creynolds
Text127: Bradley Turberville
Text128: 715-373-2667 x 5224
Text129: bturberville
Text130: Bradley Turberville
Text131: 715-373-2667 x 5224
Text132: bturberville
2019-02-25T14:21:40-0600
CHRISTOPHER REYNOLDS
2019-02-25T15:26:13-0600
MARK BEUNING
2019-02-26T17:03:12-0600
BRADLEY TURBERVILLE

File details come from the government source that posted it.