R6_Drake_Peak_Shelter_Request_WR20193029.pdf
PDF 373 KB Posted
- Attached to
- Radio Shelters Federal contract opportunity
- Solicitation number
- 12760419Q0028
About this file
Drake Peak Shelter Request
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.docx | DOCX document | |
| R9_Ino_Shelter_Request_WR20192953.pdf | ||
| BOM.xlsx | XLSX spreadsheet | |
| R9_Ino_NEPA_LTF_WR20192953.docm | DOCM document | |
| R6_Drake_Peak_NEPA_Memo_WR20193029.pdf | ||
| Shelter_PWS_April_8_2019.docx | DOCX document | |
| GPATLMRFY19LifeCycle.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Telecommunications Shelter Request Form
SCOPE: This PROPOSAL covers: Replacement Radio Communications Shelter New Shelter with Service Request #:
Prepared By: Date Prepared:
Site Name:
RADIO SHELTER LOCATION
District: City: County: State: Region: Forest:
Location Description:
Site Longitude: W ⁰ ' "
SA Longitude: W ⁰ ' "
Site Elevation: Ft.
SA Elevation: Ft.
Location Site Latitude: N ⁰ ' "
' " Staging area Latitude: N ⁰ Staging Area driving directions:
Shelter delivery address:
Logistics Is the local Forest able to offload the shelter from the delivery truck?
Yes, the equipment to be used is No, equipment will need to be scheduled through the contract
Will the shelter be able to be stored at this location until the time of install (up to a year)?
Site Access Is this a drive to site?
Yes: The road is in great condition, can handle heavy equipment, has no sharp turns and has plenty of room at the top for large equipment.
Yes: The road is drivable but will need a four-wheel drive and some preplanning/repair.
No: A helicopter install is necessary.
Description of installation site:
Other consideration for access to the site:
Other consideration for placement of the shelter:
(Combo or Key) Is there a perimeter fence?
Key access (POC)
Gate Locked?
Phone Number:
Site Info:
Site/Tower Hazards (Nearby cliffs, loose rock, other Shelters or towers etc).
Site accessibility? (Helicopter Only, Road condition, Large/ Heavy Truck Access, Obstructions, etc.)
Is this a High traffic area that would need special considerations? (Foot traffic, camp sites, etc.) No Yes explain:
General Considerations
Are utilities available? No Yes Access Restrictions or Concerns:
If access to the site is in disrepair will the Forest improve: No Yes, if no explain:
Where can the equipment (excavators & tractors, etc.) be stored?
Are there any requirements regarding inspection or washing of equipment to address noxious weed requirements?
No Yes, explain:
Will there be Special equipment required: Notes: Anything not covered above that might have an impact on the project?
Shelter Specifications:
Requested shelter size:
Will an attached monopole/tower need to be included: No Yes, if yes, Height needed ’
Total # of antennas Models of the FS antennas:
Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft Type Antenna @ ft
List identity and models of the Cooperator antennas:
Type Antenna @ ft belonging to Type Antenna @ ft belonging to Type Antenna @ ft belonging to Type Antenna @ ft belonging to
What direction should the tower articulate: West to East East to West Other:
Interior # of racks needed # radios to be installed Shelter wired for: AC DC additional options needed # of battery trays needed # Batteries to be installed Battery make/model:
HVAC Needed No Yes, If Yes which? Air Conditioning Heater Both
Exterior Solar No Yes, If Yes Mounted Top Side Both Other Direction for the door to face: North South East West
Additional solutions needed:
The vendor should provide the following services (please check all work need):
Demolish or remove existing Shelter. Existing Shelter weight: lbs. Size:
Additional considerations (specialty equipment needed, access, etc.):
Will the existing shelter be available for backhaul the day of install? Yes No If not, describe the plan for your existing shelter:
Where will the shelter be backhauled too:
Installation of shelter at site.
Special considerations not addressed already:
Custom shelter design needed. (Attach unique specifications to this request) Other :
Name of NEPA Document:
What is the topographic category of this site?
What is the wind speed at this site? Average mph Maximum mph Site radial ice loading:
Have NEPA, DM or LTF document been completed and approved?
Is the site listed as a Historical site?
Date:
No Yes explain:
@fs.fed.us
Is the site located on Private Land or will a Private Party need to be contacted:
Does the Engineering Staff concur that this shelter needs to be replaced?
Local Engineer Contact: Phone#: EMAIL:
Lands Use Have all other communication sites options (leased/collocation) been reviewed and discarded? No Yes Has it been determined that replacement is the only possible option? No Yes Other options considered:
Does this site have/require a Special use permit? No Yes If yes, has the Communication Site plan been completed? No Yes location:
Forest Special Use coordinator: Phone#: EMAIL: @fs.fed.us
Property
No Yes, if yes NRM ID# No Yes
Are any assets at the site on a Real Property Inventory?
Are any assets at the site on a Personal Property Inventory?
Forest Property Management Officer: Phone#: EMAIL: @fs.fed.us
Contact information:
@fs.fed.us @fs.fed.us @fs.fed.us
@fs.fed.us
Regional Radio Manager:
Radio Supervisor:
Local Service Technician:
COR NAME:
Local Forest/District contact:
Phone# Phone# Phone# Phone# Phone#
Email:
Email:
Email:
Email Email:
Yana Patton 530-226-2779 ypatton@fs.fed.us
Does the Forest Supervisor or District Ranger concur with this project? No Yes Will the Forest be supporting this project according to budgeting guidance in chapter 5b? No Yes http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&ca tegory=budget&icon=budget
@fs.fed.us Forest Supervisor or District Ranger Contact: Phone#: EMAIL:
CIO Project POC:
Forest Engineer Signature:
Forest Supervisor or District Ranger:
Site Specific Engineering
No Yes explain:
No Yes explain:
http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget http://fsweb.wo.fs.fed.us/results/xfst/local-resources/scripts/pullContent.php?directory=/results/pdb/Program%20Direction/FY%202013/&pagename=FY13%20Program%20Direction&category=budget&icon=budget
| Are utilities available: No_2 |
| No_3: Off |
| Yes if no explain: On |
| No_4: Off |
| Yes explain: On |
| No_5: On |
| Yes if yes Height needed: Off |
| East to West: Off |
| Other: Off |
| DC: Off |
| additional options needed: On |
| No_6: On |
| Yes If Yes which Air Conditioning: Off |
| Heater: Off |
| Battery makemodel: Off |
| Both: Off |
| No_7: Off |
| Yes If Yes Mounted Top: On |
| Side: On |
| Both_2: Off |
| Other_2: Off |
| undefined: Off |
| South: Off |
| East: On |
| West: Off |
| undefined_2: Off |
| Demolish or remove existing Shelter Existing Shelter weight: On |
| Will the existing shelter be available for backhaul the day of install: Yes_3 |
| Installation of shelter at site: Off |
| Custom shelter design needed Attach unique specifications to this request: Off |
| Other_3: On |
| Have all other communication sites options leasedcollocation been reviewed and discarded: Yes_5 |
| Has it been determined that replacement is the only possible option: Yes_6 |
| Does this site haverequire a Special use permit: No_13 |
| No_14: Off |
| Yes location: Off |
| No_15: On |
| Yes if yes NRM ID: Off |
| Are any assets at the site on a Personal Property Inventory: Yes_8 |
| Does the Forest Supervisor or District Ranger concur with this project: Yes_9 |
| Will the Forest be supporting this project according to budgeting guidance in chapter 5b: Yes_10 |
| Check Box2: Yes |
| Check Box3: Off |
| No A helicopter install is necessary: Off |
| Yes The road is drivable but will need a fourwheel drive and some preplanningrepair: On |
| Yes The road is in great condition can handle heavy equipment has no sharp turns and has plenty of: Off |
| SR #: |
| Text2: Danny J Antle |
| Date: 10/12/2018 |
| Site name: Drake Peak |
| Text5: 6 |
| Forest: Fremont-Winema |
| District: Lakeview |
| City: Lakeview |
| County: Lake |
| State: OR |
| Text15: 46 |
| Text16: 18 |
| Text17: 02.12 |
| Text18: 120 |
| Text19: 09 |
| Text20: 27.80 |
| Text21: 8232 |
| Check Box23: Off |
| Check Box24: Yes |
| Text25: 42 |
| Text26: 10 |
| Text27: 47.21 |
| Text28: 120 |
| Text29: 21 |
| Text30: 07.34 |
| Text31: 4754 |
| Text32: From HWY 395 turn west onto South 9th St. Go west approximately three and a half blocks and turn right into the fenced compound. As you go through the gate go straight ahead to the blue building. |
Contact the radio tech, Dan Antle, at 541-942 6218 or 541-219-2964 to ensure someone is there to meet you.
| Text33: 1000 South 9th St, Lakeview OR 97630 |
| Text34: |
| Check Box35: Off |
| Check Box36: Yes |
| Dropdown39: [Yes] |
| Text41: Mountain terrain, flat area at the top |
| Text42: If possible shelter should be loaded onto goose necked trailer to be moved from staging area/delivery address to site. |
| Text43: request location be the same as existing building after demolition and near enough to the existing Fish and Wildlife tower to continue to use that tower. |
| Dropdown44: [No] |
| Dropdown45: [No] |
| Text45: |
| Text46: |
| Text47: |
| Text48: If possible building to be placed on existing concrete foundation. Existing Fish and Wildlife owned tower, historic lookout that can be rented to the public, HAM radio site, vault latrine facility, and county radio site. Please see attached site layout document for further details. |
| Text49: Roads are well traveled and easily navigated by 4X4 vehicles and vehicles with trailers. There is a good staging area to offload heavy equipment within a mile of the site if necessary. |
| Text50: The historic lookout on this site is rented by the public. Request enough notice or flexibility for delivery and installation to ensure that the site is not rented by the public while we are working. |
| Text51: |
| Text52: |
| Text53: Either on the site or at the staging area |
| Text54: weed wash is available at the staging area/delivery address. |
| Text55: |
| Text56: 10X10 |
| Text57: |
| Text59: |
| Text65: |
| Text66: |
| Text67: |
| Text68: |
| Text69: |
| Text71: |
| Text70: |
| Text58: |
| Text62: |
| Text63: |
| Text64: |
| Text61: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Text77: |
| Text78: |
| Text79: |
| Text80: |
| Text81: |
| Text82: |
| Text83: |
| Text84: |
| Text85: |
| Text86: |
| Text88: 3 |
| Text87: 4 |
| Text89: Forest requires GFRC shelter with faux wood siding design to match existing historic lookout. The exterior design can be seen in the lower right hand corner of page 7 of the GFRC Shelter Overview Photographic Overview (GFRC - Photo Presentation01 - GS 2017.pdf in attached package) Shelter should also be painted to match lookout. |
The current shelter is a wooden structure that will need to be demolished and hauled away. Refuse should be moved to Lake County landfill.
Request DC LED lighting with timer installed.
building Request ice bridge be installed from building to existing tower. Distance from current building to existing tower is approx 10 feet.
Request entry panel consist of no less than four 4" entry ports.
Request shelter be pre wired with the rack nearest the entry panel as a power rack with batteries trays, lightning protection for solar lines, and solar regulator
Request grounding upgraded to Motorola R56 standards.
| Text90: 4 | |
| Text91: 4 | |
| Text92: Group 31 Batteries provided by local tech | |
| Text93: unknown | |
| Text94: 10x10 | |
| Topo Category: [Cat 4- Structures on upper half of ridge] | |
| Dropdown96: [30] | |
| Dropdown97: [140] | |
| Dropdown98: [2"] | |
| Check Box100: Yes | |
| Text101: Decision Memo, Drake Peak Equipment Shelter | |
| Text102: 10/19/2017 | |
| Check Box99: Off | |
| Check Box104: Yes | |
| Text103: | |
| Text104: Drake Peak Lookout is co located. | |
| Check Box105: Yes | |
| Check Box103: Off | |
| Check Box106: Off | |
| Text105: | |
| Dropdown106: [Yes] | |
| Text107: Sharon Kosmalski | |
| Text108: 541-947-6241 | |
| Text109: skosmalski | |
| Text110: | |
| Text111: | |
| Text112: | |
| Text113: | |
| Text114: | |
| Text115: aforbes | |
| Text116: Angie Forbes | |
| Text117: 541-947-6154 | |
| Text118: Jack Myers | |
| Text119: 541-519-5771 | |
| Text120: jqmyers | |
| Text121: Dennis Brigante | |
| Text122: 541-519-5771 | |
| Text123: dbrigante | |
| Text124: Danny Antle | |
| Text125: 541-947-6218 | |
| Text126: dannyjantle | |
| Text127: WaiyenYee | |
| Text128: 541-883-6813 | |
| Text129: wyee | |
| Text130: Mike Ramsey | |
| Text131: 541-947-6328 | |
| Text132: mramsey | |
| 2018-10-12T11:39:51-0700 | |
| DANNY ANTLE |
| 2018-10-12T11:14:37-0700 | |
| SHARON KOSMALSKI |
| 2018-10-16T14:29:51-0700 | |
| MICHAEL RAMSEY |
File details come from the government source that posted it.