M101_Ammended_07292019.pdf
PDF 641 KB Posted
- Attached to
- Facility Infrastructure Inprovements Federal contract opportunity
- Solicitation number
- 1263PX19Q0065
About this file
updated drawing to eliminate the reference to re-laminate and reinstall the countertops in rooms 114/115
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| E201_Ammended_07302019.pdf | ||
| Amendment-003-0065.pdf | ||
| A501_Ammended_07292019.pdf | ||
| dwg-07292019.zip | ZIP file | |
| GR_Sign_in.pdf | ||
| SF-30_GR-001.pdf | ||
| SF-30-001.pdf | ||
| ure_Renovations_Construction_Requisition_Specs.pdf | ||
| RFP-Grand_Rapids_Infrastructure_Improvements.doc | DOC document | |
| Siding_Upgrade_Construction_Requisition_Specs.pdf | ||
| ture_Renovations_Construction_Requisition_Dwgs.pdf | ||
| d_Siding_Upgrade_Construction_Requisition_Dwgs.pdf | ||
| ure_Renovations_Construction_Requisition_Specs.pdf | ||
| Siding_Upgrade_Construction_Requisition_Specs.pdf | ||
| d_Siding_Upgrade_Construction_Requisition_Dwgs.pdf | ||
| ure_Renovations_Construction_Requisition_Specs.pdf | ||
| ure_Renovations_Construction_Requisition_Specs.pdf | ||
| RFP-Grand_Rapids_Infrastructure_Improvements.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M101
FIRST FLOOR MECHANICAL DEMOLITION PLAN
1/4" = 1'-0"
N N
KEY PLAN
N.T.S.
DEMOLITION NOTES:
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING FINNED TUBE RADIATION AND
ASSOCIATED PIPES, SUPPORTS, COVER, ETC. AS INDICATED BY HATCH. FIELD VERIFY
EXACT SIZE AND LOCATION. PREPARE EXISTING PIPE TO REMAIN FOR CONNECTION OF
NEW. EXISTING THERMOSTAT AND ASSOCIATED CIRCULATION PUMP TO REMAIN.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING EXHAUST DUCTWORK AND
ASSOCIATED FLEXIBLE DUCTWORK, SUPPORTS, ETC. AS INDICATED BY HATCH. FIELD
VERIFY EXACT SIZE AND LOCATION.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING EXHAUST DUCTWORK BELOW
WORK TABLES AND TABLE MOUNTED GRILLES, FILTER HOUSING, FAN, CONTROLS,
SUPPORTS, ETC. AS INDICATED BY HATCH. FIELD VERIFY EXACT SIZE AND LOCATION.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING DUST COLLECTOR AND ASSOCIATED
HOPPER, CONTROLS, SUPPORTS, CONCRETE PAD, ETC. AS INDICATED BY HATCH. FIELD
VERIFY EXACT SIZE AND LOCATION.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING FUME HOOD AND ASSOCIATED
CONTROLS, SUPPORTS, ETC. AS INDICATED BY HATCH. DISCONNECT, REMOVE, AND
DISPOSE OF EXISTING FUME HOOD DUCTWORK TO BOTTOM OF STRUCTURE. FIELD
VERIFY EXACT SIZE AND LOCATION. FILL DUCT THROUGH ROOF WITH BATT
INSULATION. CAP THE ABANDONED EXHAUST DUCTWORK AT THE BOTTOM OF
STRUCTURE. SEAL WATER TIGHT.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING FUME HOOD EXHAUST FAN ON
ROOF AND ASSOCIATED DUCTWORK, CONTROLS, SUPPORTS, ETC. AS INDICATED BY
HATCH. FIELD VERIFY EXACT SIZE AND LOCATION. CAP THE ABANDONED EXHAUST
DUCTWORK ON ROOF AT. SEAL WATER TIGHT.
DISCONNECT, REMOVE, AND TURN OVER TO OWNER EXISTING UNIT HEATER AND
ASSOCIATED PIPES, CONTROLS, SUPPORTS, ETC. AS INDICATED BY HATCH. FIELD VERIFY
EXACT SIZE AND LOCATION. PREPARE EXISTING PIPE TO REMAIN FOR CONNECTION OF
NEW.
DISCONNECT, REMOVE, AND DISPOSE OF EXISTING ABANDONED PNEUMATIC
THERMOSTAT AND ASSOCIATED TUBING THAT IS ACCESSIBLE. FIELD VERIFY EXACT SIZE
AND LOCATION.
OWNER TO DISCONNECT AND REMOVE FURNACE AND ASSOCIATED EXHAUST FAN.
DISCONNECT, REMOVE, AND DISPOSE OF REMAINING EXHAUST DUCT IN SPACE. FIELD
VERIFY EXACT SIZE AND LOCATION. FILL DUCT THROUGH ROOF WITH BATT
INSULATION. CAP THE ABANDONED EXHAUST DUCTWORK AT THE ROOF AND AT THE
BOTTOM OF STRUCTURE. SEAL WATER TIGHT.
T
EXISTING UH
T
EXISTING UH
EXISTING
CONCRETE PAD
EXISTING GAS
METER
H W
R
HWS
H W
S H
W S
G 2 PSI
EXISTING PIPING THRU WALL TO
REMAIN. PREPARE FOR
CONNECTION OF NEW PIPE.
T
P l o t
D a t e M a r
F i l e
L o c a t i o n W
G
R N
D R
P D
S
U
S D
A
I n f r a s t r u c t u r e
R e n o v D r a w i n g s M d w g
FIRST FLOOR
MECHANICAL
DEMOLITION PLAN
DRAWING TITLE
CHECKED BY:
DRAWN BY:
M101
JS
JV
CD CONSTRUCTION
DOCUMENTS
2019 MAR 22
DESCRIPTION DATE
INFRASTRUCTURE
RENOVATION
MARK
CLIENT
PROJECT DESCRIPTION
CITY
STATE
ISSUE DATES
PROJECT NO: 20185390
GRAND RAPIDS
MINNESOTA
TELE FAX
Grand Forks ND Williston ND Bemidji MN
Fargo ND Minot ND Buenos Aires ARG
Bismarck ND Norwich VT
222 Third Street NW, Bemidji, MN 56601
218.751.0151 218.751.0170
Sioux Falls SD St. Paul MN Fort Collins CO Phoenix AZ
TYLER COULOMBE
License #:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the
Print Name:
Signature:
Date:
State of Minnesota.
5616503/22/2019
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
AutoCAD SHX Text
CORR
AutoCAD SHX Text
AutoCAD SHX Text
SOIL
AutoCAD SHX Text
PREP
AutoCAD SHX Text
AutoCAD SHX Text
PLANT
AutoCAD SHX Text
PREP
AutoCAD SHX Text
AutoCAD SHX Text
CORR
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
CORR
AutoCAD SHX Text
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
SOIL
AutoCAD SHX Text
DRYING
AutoCAD SHX Text
AutoCAD SHX Text
HEADHOUSE
rsindt Text Box
REVISED: 04/12/2019
AMMENDED: 07/29/2019
File details come from the government source that posted it.