Qs and As.docx
DOCX document 26 KB Posted
- Attached to
- Prefabricated Greenhouse, Edinburg, Texas
- Solicitation number
- 12639524R0011
About this file
This document contains questions and answers regarding a solicitation for a prefabricated greenhouse in Edinburg, Texas. The solicitation calls for installation of a greenhouse with four growing zones, each zone to have six SPYDR 2i grow lights or equal. Drainage will be installed in each zone. Electrical power at the site is 120V/208V, 3 phase from a Square D panel located adjacent to existing greenhouses. A Wadsworth VersiSTEP controller or equal will be provided. Potable water and electrical connections are available near the existing greenhouses. Construction materials for potable water plumbing must be CPVC. Ventilation will allow for both manual and automatic operation of vents to open when exhaust fans turn on.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639524R0011-0006.pdf | ||
| More Qs and As_2_and pics of shade structure.pdf | ||
| More Qs and As.docx | DOCX document | |
| Pic of existing greenhouses.pdf | ||
| 12639524R0011-0005.pdf | ||
| 12639524R0011-0004.pdf | ||
| Split-faced block.jpg | JPG image | |
| Hardie Board siding.jpg | JPG image | |
| 12639524R0011-0003.pdf | ||
| Site Visit Attendees.pdf | ||
| 12639524R0011-0002.pdf | ||
| 12639524R0011-0001.pdf | ||
| Atch 1_Statement of Work_Prefabricated Greenhouse.docx | DOCX document | |
| Atch 3_Federal Construction Wage Rates_Hidalgo County.pdf | ||
| Atch 2_greenhouse layout.pdf | ||
| 12639524R0011.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. The SOW does not specifically address plumbing and drains; please confirm no floor drains will be installed in the new greenhouse. Drains will be needed in each of the 4 zones.
1. The SOW mentions installing grow lights in the new greenhouse but gives no quantity. Can a light fixture model/spec and quantity be provided? 6 per zone: SPYDR 2i Grow Light – Greenhouse Megastore or equal.
1. Will any outdoor lighting be required? No
1. Are any electrical receptacles to be installed? If so, how many per cell? Four double receptacles per zone.
1. What voltage and phase electrical power is present at the site and intended for the new greenhouse? The panel is a Square D – 30 Space, 120V/208V, 3PH, #2 THHN Cable.
1. Where is the electrical power panel tie-in located relative to the new greenhouse? The Panel is a Square D – 30 Space, #2 THHN Cable, 120V/208V, 3PH is located on the Southwest wall of building 6403, adjacent to the back side of the existing greenhouses.
1. Which model of Wadsworth controller is desired? Model: VersiSTEP, or equal.
1. Where is the potable water tie-in located relative to the new greenhouse? Just Southeast of the existing greenhouses.
1. The SOW calls for items to be provided where or as “indicated on the drawings” in five places – 2.0 Specifications, C. Gutters; 2.0 Specifications, F. Vents, (1) Roof Vents; 2.0 Specifications, F. Vents, (2) Side Vents; 2.0 Specifications, F. Vents, (3) Gable Vents; 2.0 Specifications, H. Automatic or Manual Machines. No drawings are attached to the solicitation, please clarify. No drawings available.
1. In the SOW section, 2.0 Specifications, H. Automatic or Manual Machines, allows for either manual or automatic operation of vents. This is taken to mean the installation will be able to be operated by either means, that is, the components for both manual and automatic operation will be installed. Please confirm. All exhaust vents should open when exhaust fans turn on.
1. What materials of construction are required for potable water plumbing (i.e. PVC, Copper)? CPVC