More Qs and As.docx
DOCX document 25 KB Posted
- Attached to
- Prefabricated Greenhouse, Edinburg, Texas
- Solicitation number
- 12639524R0011
About this file
This document contains questions and answers regarding a federal contract opportunity to design and construct a prefabricated greenhouse in Edinburg, Texas for the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services. Key details include: stormwater floor drains will discharge outside the building footprint; engineered drawings are required for all mechanical, electrical, and plumbing systems as well as civil engineering drawings; no geotechnical report is available but one is not needed; as-built drawings showing underground utility locations will be provided after project completion; the review period for engineered drawings is two weeks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639524R0011-0006.pdf | ||
| More Qs and As_2_and pics of shade structure.pdf | ||
| Pic of existing greenhouses.pdf | ||
| Qs and As.docx | DOCX document | |
| 12639524R0011-0005.pdf | ||
| 12639524R0011-0004.pdf | ||
| Split-faced block.jpg | JPG image | |
| Hardie Board siding.jpg | JPG image | |
| 12639524R0011-0003.pdf | ||
| Site Visit Attendees.pdf | ||
| 12639524R0011-0002.pdf | ||
| 12639524R0011-0001.pdf | ||
| Atch 1_Statement of Work_Prefabricated Greenhouse.docx | DOCX document | |
| Atch 3_Federal Construction Wage Rates_Hidalgo County.pdf | ||
| Atch 2_greenhouse layout.pdf | ||
| 12639524R0011.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. It was stated that there are floor drains required for each section of the greenhouse. Are these floor drains to be connected to the sanitary sewer system or are they considered stormwater and simply discharged outside of the footprint of the building? Stormwater.
1. With regard to the drawings – its noted that there are not any more drawings to be provided by USDA and the scope of work is looking for “engineered drawings” to be provided which is mentioned right after the slab design sentence.
1. The engineered drawings being requested are they for specifically the slab only (structural only drawings) or for all the systems, mechanical, electrical, and plumbing as well? As-builts for all systems.
1. Are civil engineering drawings needed as part of the engineered drawing request? Yes
1. Is a geotechnical investigation needed as would typically used by the structural engineer for the purposes of designing the slab and associated grade beams for the split face block? Our assumption is that a geotechnical report is not currently available for the project. No geotech report needed.
1. Are you expecting As-Builts at the completion of the project to include the underground locations of the electrical, water, sewer? Yes
1. How long is the review period expected to be for the review of the engineered drawings indicated above? Two weeks.