12639524R0011-0004.pdf
PDF 352 KB Posted
- Attached to
- Prefabricated Greenhouse, Edinburg, Texas
- Solicitation number
- 12639524R0011
About this file
This amendment modifies an existing solicitation for a prefabricated greenhouse in Edinburg, Texas. Key details include the following:
The solicitation requires the construction of a 24' by 160' prefabricated greenhouse with roof-to-floor partitions, aluminum fans, a trough and pump system, cooling pads, thermostats, hardi board siding, and 70% shade. Ventilation will be provided through manual sliding rails. Interior components include racks, pinion arms, elbow arms, or a combination to operate the vents, as well as optional automatic or manual ventilation machines. The response deadline is not extended by this amendment, which modifies a portion of the statement of work regarding continuous ventilation from end to end when compartments are assembled.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639524R0011-0006.pdf | ||
| More Qs and As_2_and pics of shade structure.pdf | ||
| More Qs and As.docx | DOCX document | |
| Pic of existing greenhouses.pdf | ||
| Qs and As.docx | DOCX document | |
| 12639524R0011-0005.pdf | ||
| Split-faced block.jpg | JPG image | |
| Hardie Board siding.jpg | JPG image | |
| 12639524R0011-0003.pdf | ||
| Site Visit Attendees.pdf | ||
| 12639524R0011-0002.pdf | ||
| 12639524R0011-0001.pdf | ||
| Atch 1_Statement of Work_Prefabricated Greenhouse.docx | DOCX document | |
| Atch 3_Federal Construction Wage Rates_Hidalgo County.pdf | ||
| Atch 2_greenhouse layout.pdf | ||
| 12639524R0011.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12639524R0011 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
APHIS-MN-126395
03/06/20240004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
USDA APHIS
250 MARQUETTE AVE
SUITE 410
MINNEAPOLIS MN 55401
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/14/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is written to change a portion of the statement of work below.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JAMES G. ROLOFF
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
03/06/2024
Amendment 0004 Attachment 1, 12639524R0011 given compartments, when assembled and installed, shall be continuous from one end to the other.
(3) Gable vents
Single run of vents shall be made up of a top rail, bottom rail and mullions of extruded aluminum and bolted together in accordance with manufacturer’s instructions. All vents shall have provisions made at the hinge point to prevent creeping of the vents. Vents shall be the size indicated on the drawings with a continuous socket hinge, arranged to open out. Vents for any given compartments, when assembled and installed, shall be continuous from one end to the other.
G. Operators
There can be any combination of operators or only one type listed below.
(1) Rack and pinion arms
All vents shall be operated with rack and pinion system consisting of aluminum rack arm, aluminum housing and zinc pinion gear assemblies. Racks are attached to bottom rail of vents with aluminum clips and zinc plated steel cotter pins. No less than two sets of rack and pinion arms shall be provided for each 12’ section on vent. Provide 1.66" diameter galvanized drive shaft with 6 bolt connection couplings. Shaft hangers with nylatron bushings shall be provided to support roof and side/gable vent drive shaft.
(2) Elbow arm
All vents shall be operated with elbow arm system consisting of aluminum arm and aluminum rod assemblies. Arm assemblies are attached to bottom rail of vents with aluminum clips and zinc plated steel cotter pins. No less than two sets of rack and pinion arms shall be provided for each 12’ section on vent. Provide 1.66" diameter galvanized drive shaft with 6 bolt connection couplings. Shaft hangers with nylatron bushings shall be provided to support roof and side/gable vent drive shaft.
H. Automatic or Manual Machines
There can be any combination of machines or only one type listed below. Ventilators as indicated on drawings shall be operated by:
(1). Provide a manual machine with a hand crank or chain pull for each vent.
(2). Provide an automatic machine. The power unit shall be provided with a quick reversing single phase motor with sufficient power to operate the sash as required, complete with open and close limit switches.
I. Mechanical Components
• 4 ‐ 24’ Partitions Roof to Floor
• 8 ‐ 38” Aluminum Fans
• 8 ‐ TR 20 Trough and Pump
• 160 ‐ 5’ Cooling Pads, 6” thick
• 4 ‐ TF115 Single Speed Thermostat
• 400 L.F. Hardi Board split-faced block installed as Kick Board on perimeter
• 70% Shade on Manual Sliding Rail
J. Doors
| 2024-03-06T11:18:34-0600 | |
| JAMES ROLOFF |
File details come from the government source that posted it. Updated .