12639524R0011-0003.pdf

PDF 430 KB Posted

Attached to
Prefabricated Greenhouse, Edinburg, Texas
Solicitation number
12639524R0011
Issued by

About this file

This amendment modifies a solicitation for a prefabricated greenhouse to be installed at the USDA Animal and Plant Health Inspection Service Marketing and Regulatory Programs Science and Technology Insect Management and Molecular Diagnostics Laboratory in Edinburg, Texas. The amendment changes the statement of work to correct the dimensions of the greenhouse to 30 feet by 96 feet to match the solicitation. It also details the site preparation work including demolition of four existing greenhouses and construction of a concrete pad. The prefabricated greenhouse is to have a galvanized steel frame structure with trusses, purlins, gutters and other components. Partitions and exhaust fans are also specified.

View the file

Other files

File Type Posted
12639524R0011-0006.pdf PDF
More Qs and As_2_and pics of shade structure.pdf PDF
More Qs and As.docx DOCX document
Pic of existing greenhouses.pdf PDF
Qs and As.docx DOCX document
12639524R0011-0005.pdf PDF
12639524R0011-0004.pdf PDF
Split-faced block.jpg JPG image
Hardie Board siding.jpg JPG image
Site Visit Attendees.pdf PDF
12639524R0011-0002.pdf PDF
12639524R0011-0001.pdf PDF
Atch 1_Statement of Work_Prefabricated Greenhouse.docx DOCX document
Atch 3_Federal Construction Wage Rates_Hidalgo County.pdf PDF
Atch 2_greenhouse layout.pdf PDF
12639524R0011.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12639524R0011 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

APHIS-MN-126395

03/05/20240003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

USDA APHIS

250 MARQUETTE AVE

SUITE 410

MINNEAPOLIS MN 55401

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/14/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is written to change a portion of the statement of work below. The changed paragraph is depicted by a left-hand border. Additionally, the dimensions of the greenhouse is corrected to match the SOW (30' x 96').

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JAMES G. ROLOFF

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

03/05/2024

Amendment 0003 Attachment 1, 12639524R0011

STATEMENT OF WORK

Prefabricated Greenhouse (30’ x 96’) with 4 Bays

USDA-APHIS-PPQ, Science and Technology Insect Management and Molecular Diagnostics Laboratory – Edinburg TX

1.0 BACKGROUND

The United States Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS), Plant Protection and Quarantine (PPQ) Science and Technology (S&T) Insect management and Molecular Diagnostics Laboratory (IMMDL) – Edinburg TX, needs a prefabricated greenhouse to be furnished and installed for the purpose of rearing plants and insects.

2.0 SPECIFICATIONS

Site Preparation

Preparation of site encompasses the demolition and clearing of four existing greenhouses, inclusive of debris removal. Additionally, the project involves the construction of a four-inch concrete pad measuring 98 feet by 34 feet. Contractor to provide engineered drawings. This dual-phase preparation aims to create a cleared and level foundation.

Material and Components

Structures shall be designed and detailed according to accepted engineering practices. The following material and components are required in to meet the needs of the program:

A. Frame

(1) Framing shall consist of trusses, hot dip galvanized after fabrication, on 12'‐0" centers spanning the full width of the structure with a 6/12 roof pitch. No castings, either of aluminum or aluminum alloy, shall be permitted for joining structural members at joints subject to stress in which tensile strength is a factor.

(2) Galvanized steel frame structure comprised of one (1) 30’ wide x 96’ long with 8’ sidewall, designed to have posts in piers, with posts 12’ oc, with one bay 6’ oc, trusses, purlins, girts, bracings, gutters (with open ends) and hardware to make a complete frame. This includes four (4) 24’ wide (gable type) partitions placed at truss locations.

(3) Primary framing shall be 50,000 P.S.I. yield strength steel.

(4) Trusses shall be of 2" square steel tube (or heavier) with welded plate connections and hot dip galvanized after fabrication. Trusses shall ship from factory assembled in no more than two pieces ready to attach at the post connection. All tolerances shall be held to an absolute minimum to secure proper fit of the steel members.

(5) Truss support posts shall be 4" square steel tube (or heavier) furnished and placed at all truss bearing locations. Aluminum cast or aluminum alloy connectors are not acceptable.

(6) Trusses shall be connected to the side wall post by a welded post top connector hot dip galvanized after fabrication.

(7) Galvanized steel roof purlins, of size required, shall be prefabricated before delivery and installation.

NEW GH 2024

T 10T 8 T 9

60 Ft

87 Ft

30 Ft

96 Ft

20 Ft

NEW GH 2014 NEW GH 2014

10 Ft10 Ft 7 Ft

30 Ft 30 Ft

66 Ft 66 Ft w at er w al l w at er w al l

Existing Cement Walkway

Existing Temporary Dome Greenhouses

New Greenhouses 2014

New Greenhouse 2024

Partitions within Greenhouses

Exhaust Fan Locations

LEGEND

EXHIBIT A

114 Ft

24 Ft

18 Ft

24 Ft24 Ft

24 Ft

24 Ft

24 Ft w at er w al l

42 Ft

50 Ft98 Ft Amendment 0003 Attachment 2

12639524R0011-0003_Atch 1_Statement of Work.pdf
Atch 2_greenhouse layout.pdf
Slide Number 1
2024-03-05T08:58:04-0600
JAMES ROLOFF

File details come from the government source that posted it. Updated .