Attachment_G_-_FR404_Schedule_of_Items.pdf

PDF 248 KB Posted

Attached to
WI ERFO 2018 Flood Recovery 2
Solicitation number
12569R19B0007
Issued by

About this file

Attachment G

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G - FR404 SCHEDULE OF ITEMS

ITEM

NO.

B- 1 - SCHEDULE OF ITEMS

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $________ $________

15713 Soil Erosion & Pollution Control Lump Sum 1 $________ $________

20101 Clearing & Grubbing, Disposal Method F Lump Sum 1 $________ $________

20301 Removal of Pipe Culvert Each 1 $________ $________

20401 Roadway Excavation Cubic Yard 230 $________ $________

20415 Waste Excavation Cubic Yard 120 $________ $________

20801 Structure Excavation Cubic Yard 130 $________ $________

20803 Structural Backfill Cubic Yard 200 $________ $________

20805 Dewatering Lump Sum 1 $________ $________

25101 Riprap, Class IV Cubic Yard 30 $________ $________

25116 Geotextile, Type IV, Class I Square Yard 80 $________ $________

30115 Aggregate Surface Course, Grading G, Compaction Method B

Ton 2565 $________ $________

30120 Pit Run, Max Size 4 Inch, Compaction Method B Ton 1850 $________ $________

30302 Roadway Reconditioning Foot 3000 $________ $________

60302 13-1 Span, 8-4 Rise, Structural Aluminum Plate Pipe-Arch Foot 54 $________ $________

60520 Granular Backfill Cubic Yard 140 $________ $________

62528 Seeding and Mulching, Dry Method Lump Sum 1 $________ $________

63501 Temporary Traffic Control Lump Sum 1 $________ $________

64804 Streambed Simulation Rock, Bed Class 4 Cubic Yard 50 $________ $________

Total: $________

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.

Contractor DUNS #

Signature Date

PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES WI ERFO 2018 Flood Recovery (2) FR404

File details come from the government source that posted it.