Attachment A ‐ FR224 SCHEDULE OF ITEMS

B‐ 1 ‐ SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum 1 $________ $________

15706 Soil Erosion Control, Check Dam Each 2 $________ $________

15713 Soil Erosion & Pollution Control Lump Sum 1 $________ $________

20101 Clearing & Grubbing, Disposal Method F Lump Sum 1 $________ $________

20301 Removal of Pipe Culvert Each 3 $________ $________

20415 Waste Excavation Cubic Yard 150 $________ $________

20801 Structure Excavation Cubic Yard 150 $________ $________

20803 Structural Backfill Cubic Yard 125 $________ $________

25101 Placed Riprap, Method A Cubic Yard 70 $________ $________

25116 Geotextile, Type IV, Class I Square Yard 210 $________ $________

30115 Aggregate Surface Course, Grading G, Compaction Method B

Ton 2925 $________ $________

30120 Pit Run, Max Size 4 Inch, Compaction Method B Ton 725 $________ $________

30301 Ditch Reconditioning Foot 1500 $________ $________

30302 Roadway Reconditioning Foot 4020 $________ $________

60201‐1 18‐Inch Pipe Culvert, Polymer Coated Foot 82 $________ $________

60201‐2 24‐Inch Pipe Culvert, Polymer Coated Foot 90 $________ $________

60201‐3 36‐Inch Pipe Culvert, Polymer Coated Foot 82 $________ $________

60201‐4 60‐Inch Pipe Culvert, Polymer Coated Foot 44 $________ $________

60412 Lead‐Off Ditch Each 14 $________ $________

60520 Granular Backfill Cubic Yard 200 $________ $________

62528 Seeding and Mulching, Dry Method Lump Sum 1 $________ $________

63501 Temporary Traffic Control Lump Sum 1 $________ $________

Total $________

B‐2 ‐ NOTE: Payment for bond premiums in accordance with Clause 52.232‐5, Payments under Fixed‐Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP‐14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP‐14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

3. Quantities for aggregate are compacted in place volumes.