Attachment J - NCT-1 Bridge Schedule of Items
ITEM
NO.
B- 1 - SCHEDULE OF ITEMS
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 $________ $________
15201 Construction Survey and Staking, Method 1, Mile 0.01 $________ $________ Tolerance Class B
15713 Soil Erosion & Pollution Control Lump Sum 1 $________ $________
20305 Removal of Timber Sills and Ex Timber Bridge Lump Sum 1 $________ $________
20801 Structure Excavation Cubic Yard 5 $________ $________
25101 Riprap, Class IV Cubic Yard 5 $________ $________
25116 Geotextile, Type IV, Class I Square Yard 19 $________ $________
30110 Aggregate Surface Course, Compaction Method A Ton 5 $________ $________
55703 Treated Structural Timber and Lumber MFBM 1.976 $________ $________
56401 Bearing Device Each 6 $________ $________
62528 Seeding and Mulching, Dry Method Lump Sum 1 $________ $________
Total $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
Contractor DUNS #
Signature Date
| PART I - SCHEDULE OF ITEMS |
| SECTION B – SERVICES AND PRICES WI ERFO 2018 FLOOD RECOVERY (2) – NORTH COUNTRY TRAIL BRIDGE REPLACEMENT |