Attachment D - FR227 SCHEDULE OF ITEMS
ITEM
NO.
B- 1 - SCHEDULE OF ITEMS
DESCRIPTION PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 $________ $________
15713 Soil Erosion & Pollution Control Lump Sum 1 $________ $________
20101 Clearing & Grubbing Lump Sum 1 $________ $________
20301 Removal of Pipe Culvert Each 2 $________ $________
20401 Roadway Excavation Cubic Yard 600 $________ $________
20403 Borrow Cubic Yard 420 $________ $________
25101 Riprap, Class IV Cubic Yard 325 $________ $________
25116 Geotextile, Type IV, Class I Square Yard 1225 $________ $________
30115 Aggregate Surface Course, Grading G, Compaction Method B
Ton 2740 $________ $________
30120 Pit Run, Max Size 4 Inch, Compaction Method B Ton 3300 $________ $________
30301 Ditch Reconditioning Foot 2640 $________ $________
30302 Roadway Reconditioning Foot 6310 $________ $________
60201 24-Inch Pipe Culvert Foot 50 $________ $________
61506 Armoflex Mattress, Ford Crossing Square Yard 345 $________ $________
62528 Seeding and Mulching, Dry Method Lump Sum 1 $________ $________
63304 Signs, Aluminum Panels, Type 3 Sheeting Square Foot 20.25 $________ $________
63501 Temporary Traffic Control Lump Sum 1 $________ $________
Total $________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
3. Quantities for aggregate are compacted in place volumes.
Contractor DUNS #
Signature Date
| PART I - SCHEDULE OF ITEMS |
| SECTION B – SERVICES AND PRICES WI ERFO 2018 Flood Recovery (2) FR227 |