Attachment 6 - Drawings.pdf

PDF 1 MB Posted

Attached to
Renovation of LSS Suite and Room 211
Solicitation number
12505B25R0006
Issued by

About this file

This file contains architectural drawings and plans for the renovation of Room 125 LSS Suite and Room 211 at the U.S. Dairy Forage Research Center (DFRC). The drawings include demolition plans, new work specifications, furniture layouts, and HVAC modifications.

The drawings detail specific renovation requirements including: demolition of wall partitions in Room 125 suite, removal of carpet tile and painting in rooms 125A-E, installation of electrical and data connections for 8 modular furniture work stations, installation of double duplex receptacles, and HVAC modifications including installation of 18x6 duct work with supply grills. The furniture layout drawings show detailed workspace configurations and measurements for both Room 125 and Room 211, with Room 125 accommodating 8 workstations and Room 211 showing a multi-desk layout. The plans include precise measurements, electrical specifications (20A, 125V receptacles), and detailed demolition/construction notes for contractors.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovation of LSS Suite and Rm 211

U.S. Dairy Forage Research Center (DFRC)

Drawings

ROOM 125 DEMOLITION

SCALE:

R T HN O

DFRC

Dairy Forage Research Center

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

OUT OF SCOPE

AutoCAD SHX Text Recessed Fire Extinguisher Cabinet

AutoCAD SHX Text

EXISTING COLUMN TO REMAIN

AutoCAD SHX Text

EXISTING TO BE REMOVED

AutoCAD SHX Text 125A

AutoCAD SHX Text 125B

AutoCAD SHX Text 125C

AutoCAD SHX Text 125D

AutoCAD SHX Text 125E

AutoCAD SHX Text 125 suite

AutoCAD SHX Text

1. Remove all furniture within Remove all furniture within 125 suite and dispose of all except 2 labeled desks . 2. Uninstall counter cabinet Uninstall counter cabinet against half wall. remove and dispose of the cabinet inside the main 125 suite. 3. Remove wall partitions and Remove wall partitions and half partition as shown inside the main 125 suite. 4. Remove carpet tile and Remove carpet tile and paint all rooms: 125A, 125A closet, B, C, D, E and Suite. 5. Remove fire extinguisher Remove fire extinguisher cabinet and first aid kit inside the main 125 suite.

AutoCAD SHX Text

EXISTING WALL PARTITION TO BE REMOVED

AutoCAD SHX Text

EXISTING WALL PARTITION TO BE REMOVED

AutoCAD SHX Text

EXISTING HALF WALL PARTITION TO BE REMOVED

AutoCAD SHX Text Project

AutoCAD SHX Text

EPM

AutoCAD SHX Text Drawing

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet

AutoCAD SHX Text

POC

AutoCAD SHX Text Date

AutoCAD SHX Text Unit

AutoCAD SHX Text 11-Nov-24

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text

RENOVATION OF LSS SUITE AND ROOM 211

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Demolition

AutoCAD SHX Text D-125

ROOM 125 NEW WORK

R T HN O

20A, 125V, 2 POLE, 3 WIRE GROUNDING DOUBLE DUPLEX RECEPTACLE

POWER & TELECOMM CONDUIT. PROVIDE JUNCTION BOX ABOVE CEILING FOR

POWER CONNECTION.

DFRC

Dairy Forage Research Center

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text

OUT OF SCOPE

AutoCAD SHX Text

NEW FIRE EXTINGUISHER WALL MOUNTED LOCATION

AutoCAD SHX Text

1. Replace Carpet tile and paint all Replace Carpet tile and paint all rooms: 125A, B, C, D, E and Suite. 2. Repair ceiling grid after wall Repair ceiling grid after wall partition demo in 125 suite. 3. Pull electrical and data to connect Pull electrical and data to connect 8 modular furniture work stations inside the main 125 suite. 4. Install double duplex receptacles Install double duplex receptacles for 2 work stations and on the south wall and one at counter height on the column onside the 125 suite. 5. Patch and paint existing fire Patch and paint existing fire extinguisher location inside the 125 suite.

AutoCAD SHX Text

PULL DATA CABLE AND POWER INFEED FOR (X4) CUBICLES

AutoCAD SHX Text

FUR OUT EXISTING COLUMN 4"

AutoCAD SHX Text

COUNTER HEIGHT DOUBLE DUPLEX RECEPTACLE

AutoCAD SHX Text 125A

AutoCAD SHX Text 125B

AutoCAD SHX Text 125C

AutoCAD SHX Text 125D

AutoCAD SHX Text 125E

AutoCAD SHX Text Project

AutoCAD SHX Text

EPM

AutoCAD SHX Text Drawing

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet

AutoCAD SHX Text

POC

AutoCAD SHX Text Date

AutoCAD SHX Text Unit

AutoCAD SHX Text 11-Nov-24

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text E-1

RENOVATION OF LSS SUITE AND ROOM 211

ROOM 125 NEW WORK - Furniture Layout

R T HN O

3'-51516"

34'-7"

8'-934"

3'-3 316"

22'-238"

DFRC

Dairy Forage Research Center

AutoCAD SHX Text Fire Extinguisher Cabinet

AutoCAD SHX Text 125A

AutoCAD SHX Text 125B

AutoCAD SHX Text 125C

AutoCAD SHX Text 125D

AutoCAD SHX Text 125E

AutoCAD SHX Text

CABINETS FOR OFFICE STORAGE

AutoCAD SHX Text

1. This drawing is meant This drawing is meant to serve as a reference only and is not part of the scope of this project.

AutoCAD SHX Text Project

AutoCAD SHX Text

EPM

AutoCAD SHX Text Drawing

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet

AutoCAD SHX Text

POC

AutoCAD SHX Text Date

AutoCAD SHX Text Unit

AutoCAD SHX Text 11-Nov-24

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Furniture Layout

AutoCAD SHX Text F-125

ROOM 211 Furniture Layout For Reference

R T HN O

1 DFRC

Dairy Forage Research Center

AutoCAD SHX Text

1. This drawing is meant This drawing is meant to serve as a reference only and is not part of the scope of this project.

AutoCAD SHX Text Glass modular demountable wall with a sliding door

AutoCAD SHX Text Project

AutoCAD SHX Text

EPM

AutoCAD SHX Text Drawing

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet

AutoCAD SHX Text

POC

AutoCAD SHX Text Date

AutoCAD SHX Text Unit

AutoCAD SHX Text 11-Nov-24

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Furniture Layout

AutoCAD SHX Text F-211

T T T T

T

DFRC

Dairy Forage Research Center

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text 200J

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 200H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 34x30

AutoCAD SHX Text 34x18

AutoCAD SHX Text 18x6

AutoCAD SHX Text 12x6

AutoCAD SHX Text 16x6

AutoCAD SHX Text 12x6

AutoCAD SHX Text 8x6

AutoCAD SHX Text 8x6

AutoCAD SHX Text 8x6

AutoCAD SHX Text 8x6

AutoCAD SHX Text 50x30

AutoCAD SHX Text 50x30

AutoCAD SHX Text 18x16

AutoCAD SHX Text 20x28

AutoCAD SHX Text

AH-B-1

AutoCAD SHX Text 18x6

AutoCAD SHX Text 12x6

AutoCAD SHX Text 12x6

AutoCAD SHX Text

1. Verify site conditions. Verify site conditions. 2. coordinate with facilities coordinate with facilities to access AHU unit or to make any changes that impact building HVAC. 3. Supply and install 18x6 Supply and install 18x6 duct to the 34x30 main duct. and split into two 12x6 branches with supply grill for each. 4. Insulate duct work.Insulate duct work.

AutoCAD SHX Text

NEW SUPPLY GRILLS

AutoCAD SHX Text Project

AutoCAD SHX Text

EPM

AutoCAD SHX Text Drawing

AutoCAD SHX Text Scale

AutoCAD SHX Text Sheet

AutoCAD SHX Text

POC

AutoCAD SHX Text Date

AutoCAD SHX Text Unit

AutoCAD SHX Text 11-Nov-24

AutoCAD SHX Text Dairy Forage Research Unit

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text Loubna Harms

AutoCAD SHX Text

HVAC

AutoCAD SHX Text H-211

Scope of Work Description
General Project Information
Project Location
USDA Project Team
Bid Information
Contract Scope
Period of Performance
Technical Requirements
General
Materials
Execution
Demolition
Construction
General Notes and Requirements
Contract Performance
Receiving, Storing and Staging of Materials
Permits
Security
Buildings and Asset Protection
Parking
Scheduled Outages
Noise Control
Contractors’ Personnel
Quality Assurance
Omissions
Documentation
Safety
Activity Hazard Analysis (AHA)
Accident Prevention Plan
Emergency Response
Accident Reporting
Required Personnel
Personal Protective Equipment
Clean Up and Waste
Environment Protection
Attachments
Photographs
Drawings
Forms

File details come from the government source that posted it. Updated .