Attachment 6 - Drawings.pdf
PDF 1 MB Posted
- Attached to
- Renovation of LSS Suite and Room 211
- Solicitation number
- 12505B25R0006
About this file
This file contains architectural drawings and plans for the renovation of Room 125 LSS Suite and Room 211 at the U.S. Dairy Forage Research Center (DFRC). The drawings include demolition plans, new work specifications, furniture layouts, and HVAC modifications.
The drawings detail specific renovation requirements including: demolition of wall partitions in Room 125 suite, removal of carpet tile and painting in rooms 125A-E, installation of electrical and data connections for 8 modular furniture work stations, installation of double duplex receptacles, and HVAC modifications including installation of 18x6 duct work with supply grills. The furniture layout drawings show detailed workspace configurations and measurements for both Room 125 and Room 211, with Room 125 accommodating 8 workstations and Room 211 showing a multi-desk layout. The plans include precise measurements, electrical specifications (20A, 125V receptacles), and detailed demolition/construction notes for contractors.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of LSS Suite and Rm 211
U.S. Dairy Forage Research Center (DFRC)
Drawings
ROOM 125 DEMOLITION
SCALE:
R T HN O
DFRC
Dairy Forage Research Center
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
OUT OF SCOPE
AutoCAD SHX Text Recessed Fire Extinguisher Cabinet
AutoCAD SHX Text
EXISTING COLUMN TO REMAIN
AutoCAD SHX Text
EXISTING TO BE REMOVED
AutoCAD SHX Text 125A
AutoCAD SHX Text 125B
AutoCAD SHX Text 125C
AutoCAD SHX Text 125D
AutoCAD SHX Text 125E
AutoCAD SHX Text 125 suite
AutoCAD SHX Text
1. Remove all furniture within Remove all furniture within 125 suite and dispose of all except 2 labeled desks . 2. Uninstall counter cabinet Uninstall counter cabinet against half wall. remove and dispose of the cabinet inside the main 125 suite. 3. Remove wall partitions and Remove wall partitions and half partition as shown inside the main 125 suite. 4. Remove carpet tile and Remove carpet tile and paint all rooms: 125A, 125A closet, B, C, D, E and Suite. 5. Remove fire extinguisher Remove fire extinguisher cabinet and first aid kit inside the main 125 suite.
AutoCAD SHX Text
EXISTING WALL PARTITION TO BE REMOVED
AutoCAD SHX Text
EXISTING WALL PARTITION TO BE REMOVED
AutoCAD SHX Text
EXISTING HALF WALL PARTITION TO BE REMOVED
AutoCAD SHX Text Project
AutoCAD SHX Text
EPM
AutoCAD SHX Text Drawing
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet
AutoCAD SHX Text
POC
AutoCAD SHX Text Date
AutoCAD SHX Text Unit
AutoCAD SHX Text 11-Nov-24
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text
RENOVATION OF LSS SUITE AND ROOM 211
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Demolition
AutoCAD SHX Text D-125
ROOM 125 NEW WORK
R T HN O
20A, 125V, 2 POLE, 3 WIRE GROUNDING DOUBLE DUPLEX RECEPTACLE
POWER & TELECOMM CONDUIT. PROVIDE JUNCTION BOX ABOVE CEILING FOR
POWER CONNECTION.
DFRC
Dairy Forage Research Center
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
OUT OF SCOPE
AutoCAD SHX Text
NEW FIRE EXTINGUISHER WALL MOUNTED LOCATION
AutoCAD SHX Text
1. Replace Carpet tile and paint all Replace Carpet tile and paint all rooms: 125A, B, C, D, E and Suite. 2. Repair ceiling grid after wall Repair ceiling grid after wall partition demo in 125 suite. 3. Pull electrical and data to connect Pull electrical and data to connect 8 modular furniture work stations inside the main 125 suite. 4. Install double duplex receptacles Install double duplex receptacles for 2 work stations and on the south wall and one at counter height on the column onside the 125 suite. 5. Patch and paint existing fire Patch and paint existing fire extinguisher location inside the 125 suite.
AutoCAD SHX Text
PULL DATA CABLE AND POWER INFEED FOR (X4) CUBICLES
AutoCAD SHX Text
FUR OUT EXISTING COLUMN 4"
AutoCAD SHX Text
COUNTER HEIGHT DOUBLE DUPLEX RECEPTACLE
AutoCAD SHX Text 125A
AutoCAD SHX Text 125B
AutoCAD SHX Text 125C
AutoCAD SHX Text 125D
AutoCAD SHX Text 125E
AutoCAD SHX Text Project
AutoCAD SHX Text
EPM
AutoCAD SHX Text Drawing
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet
AutoCAD SHX Text
POC
AutoCAD SHX Text Date
AutoCAD SHX Text Unit
AutoCAD SHX Text 11-Nov-24
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text E-1
RENOVATION OF LSS SUITE AND ROOM 211
ROOM 125 NEW WORK - Furniture Layout
R T HN O
3'-51516"
34'-7"
8'-934"
3'-3 316"
22'-238"
DFRC
Dairy Forage Research Center
AutoCAD SHX Text Fire Extinguisher Cabinet
AutoCAD SHX Text 125A
AutoCAD SHX Text 125B
AutoCAD SHX Text 125C
AutoCAD SHX Text 125D
AutoCAD SHX Text 125E
AutoCAD SHX Text
CABINETS FOR OFFICE STORAGE
AutoCAD SHX Text
1. This drawing is meant This drawing is meant to serve as a reference only and is not part of the scope of this project.
AutoCAD SHX Text Project
AutoCAD SHX Text
EPM
AutoCAD SHX Text Drawing
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet
AutoCAD SHX Text
POC
AutoCAD SHX Text Date
AutoCAD SHX Text Unit
AutoCAD SHX Text 11-Nov-24
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Furniture Layout
AutoCAD SHX Text F-125
ROOM 211 Furniture Layout For Reference
R T HN O
1 DFRC
Dairy Forage Research Center
AutoCAD SHX Text
1. This drawing is meant This drawing is meant to serve as a reference only and is not part of the scope of this project.
AutoCAD SHX Text Glass modular demountable wall with a sliding door
AutoCAD SHX Text Project
AutoCAD SHX Text
EPM
AutoCAD SHX Text Drawing
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet
AutoCAD SHX Text
POC
AutoCAD SHX Text Date
AutoCAD SHX Text Unit
AutoCAD SHX Text 11-Nov-24
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Furniture Layout
AutoCAD SHX Text F-211
T T T T
T
DFRC
Dairy Forage Research Center
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text 200J
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 200H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 34x30
AutoCAD SHX Text 34x18
AutoCAD SHX Text 18x6
AutoCAD SHX Text 12x6
AutoCAD SHX Text 16x6
AutoCAD SHX Text 12x6
AutoCAD SHX Text 8x6
AutoCAD SHX Text 8x6
AutoCAD SHX Text 8x6
AutoCAD SHX Text 8x6
AutoCAD SHX Text 50x30
AutoCAD SHX Text 50x30
AutoCAD SHX Text 18x16
AutoCAD SHX Text 20x28
AutoCAD SHX Text
AH-B-1
AutoCAD SHX Text 18x6
AutoCAD SHX Text 12x6
AutoCAD SHX Text 12x6
AutoCAD SHX Text
1. Verify site conditions. Verify site conditions. 2. coordinate with facilities coordinate with facilities to access AHU unit or to make any changes that impact building HVAC. 3. Supply and install 18x6 Supply and install 18x6 duct to the 34x30 main duct. and split into two 12x6 branches with supply grill for each. 4. Insulate duct work.Insulate duct work.
AutoCAD SHX Text
NEW SUPPLY GRILLS
AutoCAD SHX Text Project
AutoCAD SHX Text
EPM
AutoCAD SHX Text Drawing
AutoCAD SHX Text Scale
AutoCAD SHX Text Sheet
AutoCAD SHX Text
POC
AutoCAD SHX Text Date
AutoCAD SHX Text Unit
AutoCAD SHX Text 11-Nov-24
AutoCAD SHX Text Dairy Forage Research Unit
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text Loubna Harms
AutoCAD SHX Text
HVAC
AutoCAD SHX Text H-211
| Scope of Work Description |
| General Project Information |
| Project Location |
| USDA Project Team |
| Bid Information |
| Contract Scope |
| Period of Performance |
| Technical Requirements |
| General |
| Materials |
| Execution |
| Demolition |
| Construction |
| General Notes and Requirements |
| Contract Performance |
| Receiving, Storing and Staging of Materials |
| Permits |
| Security |
| Buildings and Asset Protection |
| Parking |
| Scheduled Outages |
| Noise Control |
| Contractors’ Personnel |
| Quality Assurance |
| Omissions |
| Documentation |
| Safety |
| Activity Hazard Analysis (AHA) |
| Accident Prevention Plan |
| Emergency Response |
| Accident Reporting |
| Required Personnel |
| Personal Protective Equipment |
| Clean Up and Waste |
| Environment Protection |
| Attachments |
| Photographs |
| Drawings |
| Forms |
File details come from the government source that posted it. Updated .