Attachment 11 Langan Geotechnical Report 01.28.2026.pdf
PDF 10 MB Posted
- Solicitation number
- 124PCA27Q0002
About this file
This is a Progress Geotechnical Letter Report prepared by Langan Engineering and Environmental Services for the USDA Whitten Building Lot 9 parking lot in Washington, DC, dated January 28, 2026. The report addresses a sinkhole discovered at the site during parking lot improvement construction and recommends remediation strategies based on geotechnical exploration completed on January 14, 2026.
The sinkhole, located approximately 91 inches from the site/metro elevator edge and directly above the WMATA Smithsonian metro station, was initially over 8 feet deep when it re-emerged in May 2025. The site's subsurface consists of fill soils—primarily silty sand and poorly-graded sand with gravel—with loose soil conditions identified to approximately 10 feet below grade and potentially extending deeper. Ground-penetrating radar scanning achieved only 3 feet maximum depth due to soil conditions, and intrusive investigation confirmed loose soils at multiple locations via dynamic cone penetration tests and hand augers. The report recommends two remediation options for USDA consideration: Option 1 involves excavation around the sinkhole to at least 3 feet below grade (or to the metro station top if shallower), followed by backfill with select granular fill and geogrid; Option 2 adds deep low-mobility grouting to remediate loose soils adjacent to the existing metro station. The report specifies that excavation work above the tunnel must be coordinated with WMATA and conducted in phases to avoid excessive pressure removal. Engineering oversight and special inspection during construction are deemed necessary, with all deviations requiring Geotechnical Engineer of Record review and coordination.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
28 January 2026
Ari Blumenthal, AIA, LEED AP BD+C
Shalom Baranes Associates
1010 Wisconsin Avenue NW, Suite 900
Washington, DC 20007
Via email: ablumenthal@sbaranes.com
Re:
Progress Geotechnical Letter Report
Lot 9 Parking Lot, USDA Whitten Building
Washington, District of Columbia
Langan Project No.: 270144002
Dear Mr. Blumenthal:
This letter report was prepared in accordance with our 21 August 2025 proposal for Geotechnical
Services at the Jamie L. Whitten Building Lot 9 in Washington, DC. Based on our correspondence with your office and the RFP documents, we understand that the US Department of Agriculture
(USDA) and US General Services Administration (GSA) aims to improve the safety of Lot 9 at the
Jamie L. Whitten Building (herein the Whitten Building) in Washington DC. The subject of our report is associated with the repair of the sinkhole present at the site. A summary of our key findings and recommendations are as follows:
• Findings: We completed ground penetrating radar (GPR) survey of the site area. The GPR scanning was not able delineate the extent of the sinkhole beyond what was visually identifiable from the surface. We subsequently performed an intrusive subsurface investigation on 14 January 2026 consisting of pavement cores, hand augers, and dynamic cone penetration (DCP) tests. Observed soil generally consisted of sand and gravel, with varying amounts of silt. Cobbles were observed during hand-augering. Loose soils were identified at several investigation locations.
• Sinkhole Repair: Mitigation of the sinkhole will require risk-based decision by USDA in coordination with WMATA. Based on available information, we recommend that pricing for the remediation consider two potential options:
o Option 1: Complete general excavation around the sinkhole, void, and sagging mud mat areas to a depth of at least 3 feet below existing grade. The excavation should then be subsequently filled with select granular fill and geogrid to provide a transfer platform. This approach remediates near-surface conditions but does not eliminate deep loose soils and potential future movement of soils at deeper zones.
o Option 2: Complete Option 1 but also complete additional deep low-mobility grouting to remediate loose soils adjacent to the existing station.
Washington, District of Columbia
Langan Project No.: 270144002
This summary of findings is meant to provide an overview of our recommendations based on the available information and our limited geotechnical study. For a full understanding of the exploration and our recommendations, please read the report in its entirety. The following sections include discussions of existing conditions, our geotechnical exploration, encountered conditions, and site analysis and recommendations.
EXISTING CONDITIONS
The site is located at the northwest corner of 12th Street SW and Independence Avenue SW.
Lot 9 approximately 13,000 square feet and bound by the People’s Garden and National Mall to the north, 12th Street SW to the east, Independence Avenue SW to the south, and the Whitten
Building to the west; see Inset 1.
Inset 1 - Site Location Aerial
Prior to construction, the site consisted of an asphalt lot with 47 parking spaces. Three gate arms allowed access to the site from the east side (from 12th Street SW). Hedges and other vegetation enclosed the remainder of the lot.
Surface elevations of the lot range from approximate el 32 at the north side to el 33.3 at the south side. The sidewalks to the east and south of the lot gently slope from approximate el 32 at the north to el 34 at the south. Lot 9 is elevated compared to the adjacent west Whitten Building moat (el 23.4) and a set of stairs is located at the west side of the lot that extends down to the
Whitten Building moat. An approximate 2H:1V grass slope, retaining wall, and moat is located to the west of the lot, separating the lot from the Whitten Building.
Washington, District of Columbia
Langan Project No.: 270144002
Directly underlying the site is the Washington Metropolitan Area Transit Authority (WMATA)
Smithsonian metro station. The centerline of the station is approximately oriented in the northwest-southeast direction. A vent associated with the metro station is located in the northwest corner of Lot 9. An elevator shaft to the station is located at the southwest side of the lot. A GSA-owned steam tunnel is additionally located parallel to the east side of the WMATA station, but the tunnel diverges to the northeast at the northeast corner of the parking lot.
Project Background
We understand that the original design of the parking lot improvements was completed by
AECOM in 2021 and generally consists of the partial demolition of existing structures and landscaping to construct new security bollards, lighting, and utilities at the lot. An updated foundation plan for the site was developed by the bollard consultant, Guardiar, in December 2024.
The construction of the project was underway in late 2024 and early 2025 but was subsequently halted and the contract of the original contactor, Curry and Associates, Inc. (C&A), expired.
Demolition and construction at the site were partially completed before expiration of C&A’s contract. Previous work removed the asphalt pavement around the north, east, and south edges of the site to install static and dynamic bollards. We understand that the concrete entrance aprons and dynamic bollards have been installed. However, the static bollard installation is not complete, and the areas are in varying stages of completion.
We understand that the bollard subgrade mud mats at the north side of the site were installed at the incorrect elevation. Additionally, we understand that the bollard subgrade mud mat at the south side of the site is cracked and sloping toward the WMATA elevator.
We understand that deep foundation bollards are planned at the northeast corner, southeast corner, and southwest corner (between metro elevator and Whitten building) of the site, but work on these deep bollards has not begun.
Review of Available Information
We reviewed historic aerials, historic topographic and Sanborn maps, soil and regional geologic maps, flood hazard maps, the available WMATA station plans provided to us, and construction inspection field reports. A review of pertinent findings from these documents is summarized in the following paragraphs.
Historic Aerials
We have reviewed available historical aerial photographs for the site dated 1949 to 2023. These photographs depict the Lot 9 site has been a parking lot next to the Whitten building since before
1949. Major changes in usage are not depicted on the aerial photographs.
A historic aerial dated March 24, 1973 obtained from the National Archives depicts construction of the metro tunnel. The photographs depict that the tunnel is being constructed via cut-and-cover methods and earthwork is active within the Lot 9 site. The aerial appears to depict vertical support of excavation at the edges of the work area.
Washington, District of Columbia
Langan Project No.: 270144002
Historic Topographic Map
We reviewed the Topographical Map of the District of Columbia surveyed in the years 1856 to
1859 by A. Boschke. This map indicates that the site is part of the National Mall and no buildings are present on the site.
Historic Sanborn Maps
We reviewed available historic Sanborn maps for the years 1888 through 1916. These maps depicted the site of the USDA Whitten Building as formerly part of the National Mall. These maps did not indicate any building development at the site during this time.
Soil Map
We reviewed the United States Department of Agriculture (USDA), Natural Resources
Conservation Service Web Soil Survey. Based on this database service, the near surface soils underlying the site are classified as Urban Land (human-transported fill material).
Regional Geologic Map
We reviewed the regional geologic map entitled “Geologic Map of the Washington West
Quadrangle, District of Columbia, Montgomery and Prince Georges Counties, Maryland, and
Arlington and Fairfax Counties, Virginia” dated 1994 prepared by the United States Geologic
Service (USGS). According to this map, the site is underlain by sedimentary deposits consisting of late-Pleistocene age gravel, sand, silt, and clay. These deposits are described as deeply weathered, well bedded alluvium of gray-brown, pale yellow, and pale orange color.
Flood Hazard Map
We reviewed the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map
(FIRM) number 1100010019C dated 27 September 2010 for the site vicinity. According to this map, the site is located outside of the 1- and 0.2-percent-annual-chance flood zones (100-year and 500-year flood zones).
We also reviewed national storm surge hazard maps for the region that show the site is out of the storm surge flood extents for Category 1 through 4 hurricanes. The maps were accessed through the National Oceanographic and Atmospheric Administration (NOAA) GIS website.
WMATA Metro Tunnel
We reviewed provided drawings of the WMATA metro tunnel that underlies the site; see
Appendix A. These drawings were sourced from a 2019 email between AECOM and WMATA regarding the project. From the drawings we understand the following:
• Drawings show plan layout of the tunnel between approximate stations 37+00 and
43+00. Lot 9 is roughly located between stations 37+00 and 39+00 of the tunnel.
• One drawing shows a profile of the WMATA Station between stations 37+00 and 40+00 which indicates the top of the station structure ranges from approximate el 31.2 at the
Washington, District of Columbia
Langan Project No.: 270144002 north end of Lot 9 to el 28 at the south end of Lot 9. The bottom of the tunnel is roughly between approximate el -13.0 and -13.5.
o Pavement site elevations on the profile range from approximate el 32 at the north side of Lot 9 to el 33.3 at the south side of Lot 9 which indicates the top of the tunnel structure was planned to be about 0.8 to 5.3 feet below grade with the shallowest depth at the north side of the site.
• The drawing indicates the tunnel vent extends to the surface at the north end of Lot 9 and the elevator is located just outside the south end of Lot 9.
Lot 9 Geotechnical Report
We reviewed the 24 May 2019 Geotechnical Engineering Report prepared for the site by
AECOM. Based on our review of this report, three test borings and one test pit were completed at the site. The boring logs indicates that the subsurface conditions consist primarily of fill soils consisting of very loose to very dense silty sand with gravel and clayey sand with gravel extending to a maximum depth of 15 feet below grade. Groundwater was reportedly not observed during the investigation. The boring logs indicate the surficial asphalt consists of 2.5 inches of asphalt overlying 3.5 inches of crushed stone subbase course.
A test pit was reportedly completed near the WMATA metro elevator to locate existing subsurface utilities to 3 feet deep. A test pit log was not provided in the report.
Based on their findings, AECOM recommended that static bollard foundations be designed using a maximum allowable bearing pressure of 1,500 psf. The report notes that foundations may need to be less than 24 inches deep to avoid conflict with the WMATA structures. The report indicates that fill soils were expected to be soft in areas and that undercutting and replacement below foundations should be expected.
The report indicates that retractable bollards were recommended to be supported on drilled piers using an allowable skin friction value of 200 psf below a depth of 2 feet and end bearing of
1,500 psf.
Construction Inspection Field Reports
We reviewed the construction inspection field reports prepared by AECOM between 29 October
2024 and 2 April 2025. The dates provided are based on AECOM personnel site visits and only reflect an approximate timeline for construction. Non-conformance reports and details of construction (i.e., dates of demolition and construction of specific items) were not available.
Pertinent geotechnical information on the timeline of construction and deviations from the design are summarized below.
10/29/2024: Depressed ground surface was noted at the north side of the metro elevator
10/31/2024: Soils at the north, east, and south sides of the site below the proposed bollard mud mat were compacted; however, soil compaction reports were not available.
Washington, District of Columbia
Langan Project No.: 270144002
11/12/2024: The depressed ground surface noted on 10/29/2024 report is now noted as being resolved with WMATA.
11/13/2024: Gravel and mud mat were present at the east side of the site. Gravel and mud mats were notably not placed at the north and south sides at this time.
11/21/2024: Ponded water and saturated soils from heavy rain were observed in excavations at the north and south sides of the site. Partial gravel cover was present at the north bollard foundation and full gravel cover at the south side excavations were present. Concrete at dynamic bollard (entrance) areas and mud mats at static bollard areas were present on the east side of the site.
Some sonotubes for light pole foundations were filled with water. The site was being dewatered with pumps.
12/06/2024: Gravel is still only partially covering the north excavation. One sonotube appeared to have caved in.
12/17/2024: Photos show partial mud mat cover for the north and south side bollard foundations. Ponding of water is apparent in areas not covered with a mud mat.
01/28/2025: Several reports between 12/17/2025 and 01/28/2025 indicate ponded water at the north and south excavations and damage to sonotubes.
01/30/2025: Damaged sonotubes were not present. Static bollards at north end of site are noted to be 24 to 30 inches below the adjacent grade (People’s Garden north of Lot 9). Standing water and ice observed in sonotube excavations and at southeast corner of the site.
04/02/2025: It is unclear if any on-site work occurred between 01/28/2025 and
04/02/2025. Reports between these dates generally note soil subsidence/degradation at excavation areas and ponded water in the southeast corner of the site.
Additionally, several reports mention missing erosion and sediment control measures or unmaintained controls.
We understand that soil compaction tests were completed at the excavations for the north and south side bollards on 19 November 2024 and indicated acceptable subgrade compaction. These tests were completed prior to heavy rains at the site. It is unknown whether re-testing of subgrades prior to gravel and mud mat placement occurred.
WMATA Field Inspection Report (Sinkhole)
The following information regarding the sinkhole was obtained from the WMATA field observation notes from 2 June 2025:
• The sinkhole was over-excavated and backfilled prior to construction of the mud mat at the south end of Lot in December 2024. It is unclear on what date the sinkhole formed.
Washington, District of Columbia
Langan Project No.: 270144002
• WMATA was notified on 17 May 2025 that the sinkhole had re-emerged and was over
8 feet deep.
• At the time of WMATA’s site visit on 2 June 2025, the sinkhole was approximately 2 feet by 4 feet wide and 5 feet deep. The Contractor (C&A) indicated that the width of the sinkhole had decreased since re-emergence possibly due to collapse of sidewalls.
• A mud mat south of the sinkhole (constructed in January 2025) was observed to be sagging and a transverse crack was present in the slab at the west side of the sagging area.
• The following structures were investigated but no cause of the sinkhole could be identified: Existing utilities / DC water pipes, GSA steam tunnel, WMATA Elevator shaft, Drainage pumping station.
• GPR scanning was performed in the area and reportedly did not produce significant findings.
GEOTECHNICAL EXPLORATION
We performed a limited, non-intrusive geotechnical exploration at the site on 7 October 2025 that consisted of ground penetration radar (GPR) scanning to scan for anomalies beneath the pavement of Lot 9 and two hand augers within the exposed portion of the sinkhole. GPR scanning was performed by GPRS, Inc. and hand-augers were performed by an engineer from our office.
Based on the results of the GPR scanning and a desire to further delineate the extent of the sinkhole and soft soils at the site, an intrusive investigation consisting of seven pavement cores, nine hand augers, and nine dynamic cone penetration (DCP) tests were performed on 14 January
2026. Investigation locations overlaid on Lot 9 and the approximate WMATA station extents are shown in the attached Figure 1.
The dynamic cone penetrometer (DCP) tests, designated as DCP-01 through DCP-09, were performed using a Wildcat DCP. Each DCP test was performed by driving a 1-inch-diameter steel rod fitted with a 1.4-inch-diameter cone tip into the subsurface using a 35-pound hammer dropped from a height of 15 inches. The number of hammer blows to advance the cone for each
4-inch increment was recorded and the test results were analyzed using software developed by
Triggs Technologies, Inc.
Hand auger logs are given in Appendix B, DCP logs in Appendix C, the ground penetrating radar report prepared by GPRS is given in Appendix D, and site photographs are given in Appendix E.
ENCOUNTERED CONDITIONS
At the time of our non-intrusive investigation in October 2025, the exposed sinkhole was approximately 25 inches by 55 inches wide and 20 inches deep. The edge of the sinkhole was located approximately 91 inches from the edge of the site/metro elevator and directly above the edge of the metro station. The conditions during our January 2026 investigation were relatively unchanged.
Washington, District of Columbia
Langan Project No.: 270144002
A summary of our field observations during our investigations are described in the following sections.
GPR Results
GPR scanning was completed throughout accessible areas of Lot 9 in October 2025. The GPR scanning was not able delineate the extent of the sinkhole beyond what was visually identifiable from the surface. GPRS, the subcontractor completing the GPR scanning, informed Langan that the GPR scanning was only able to reach a maximum depth of 3 feet potentially due to the asphalt and soil conditions. Four anomalous zones were reported beneath the pavement by the GPR scans; however, only one was identified as a potential void; see Appendix D.
Locations of anomalies 2 through 4 (see page 3 of Appendix D for locations) were detected between 1 and 2 feet below grade but did not resemble voids. At location 1, approximately
10 feet east of the sinkhole, a potential void was detected between approximately 0.8 and
1.4 feet below grade. We anticipate that this void is likely caused by slight separation between the pavement and the subgrade.
Subsurface Conditions
During the January 2026 investigation, nine DCPs were completed to assess the density/consistency of the underlying soil, and a hand auger was used to retrieve soil cuttings for classification. Pavement and mud mats were cored at seven locations to reach soil subgrade for the testing.
Based on the hand augers completed in both October 2025 and January 2026 and the coring completed in January 2026, the soil conditions generally consist of a surficial layer of pavement underlain by fill soils. Surficial asphalt was observed to be between 4.3 and 7.8 inches thick and concrete mud mats were observed to be between 3.8 and 4.5 inches thick. Fill generally consisted of silty sand with gravel (USCS SM) and poorly-graded sand with gravel (USCS SP).
Soil was observed to be gray or grayish brown near subgrade and became browner in color with depth. Gravel within the soil was fine to coarse in size and either angular or rounded in shape.
Cobbles were encountered in HA-1, HA-2, and DCP-03.
The consistency of the fill ranged from very loose to dense as evidenced by correlated SPT
N-values ranging from 0 blows/ft to greater than 25 blows/ft (average of 9 blows/ft). We anticipate a majority of the N-values greater than 25 blows/foot were the result of gravel and cobbles.
Pertinent results are as follows:
• Very loose to loose soils were primarily encountered at DCP-01, DCP-03, and DCP-04.
o The soil at tests DCP-03 and DCP-04 were loose from the surface down to their termination depths at 10 feet, respectively.
o DCP-01 was observed to be loose below 5 feet from the surface.
• Tests DCP-05 and DCP-6 were performed east of the sinkhole location and were found to be loose to medium dense between the pavement and top of metro station.
Washington, District of Columbia
Langan Project No.: 270144002
• Test DCP-07 was located northeast of the sinkhole and DCP-06 where GPR did not see any anomalies. At this location, soil was observed to be dense.
• Test DCP-08 was located southeast of the sinkhole and DCP-05 and south of a GPR-recorded anomaly. Subgrade was observed to be loose in the upper 1 foot and dense below that.
• Test DCP-09 was located south of the test pit and east of the sloped portion of the mudmat (i.e., the non-sloped portion of mudmat at the as-built elevation). DCP-09 was observed to be medium dense.
Groundwater was encountered in only one hand auger location, DCP-04, at 6.3 feet below grade.
In October 2025, soil near the bottom of the sinkhole (about 2 feet below grade) was observed to have higher moisture content than the sidewalls of the sinkhole. The observed water is likely indicative of localized perched water.
The reviewed AECOM Geotechnical Engineering Report indicated that fill soils encountered in borings consisted of very loose to very dense silty sand with gravel and clayey sand with gravel.
Groundwater was not observed during the AECOM investigation to a maximum explored depth of 15 feet.
SITE ANALYSIS AND RECOMMENDATIONS
Based on our review of available documents and field observations, our key findings for the site are the following:
• Soil below surficial asphalt generally consists of poorly-graded sand or silty sand with varying amounts of gravel and cobbles.
• A depression near the metro elevator was first noticed in October 2024 by the AECOM team. In mid-November AECOM reported that the depression would be mitigated by C&A and WMATA. WMATA reporting indicates the sinkhole area was over-excavated and then backfilled in December 2024.
• The re-emerged sinkhole (May 2025) was initially reported to be 8 feet deep. However, the top of the metro station is anticipated to be approximately 6 feet below grade at the south side of the site. Therefore, the sinkhole appears to extend to the top of the metro station.
• The cause of the sinkhole is unknown but based on its location is likely influenced by the underlying station. The movement of material may be due to the vibration from the station, movement of material around the sides of the station from dewatering, or loss into a void space in the tunnel structure or utility.
• The DCP and hand auger results generally indicate the primary area of concern is in the area of tests DCP-01, DCP-03, and DCP-04 and generally along the edge of the WMATA tunnel structure.
Our recommendations regarding sinkhole repair are provided in the following sections.
Washington, District of Columbia
Langan Project No.: 270144002
Preliminary Sinkhole Repair Recommendations
The full extent of the sinkhole is unknown at this time from the available test results. During the limited intrusive investigation performed in January 2026, loose soils were identified to approximately 10 feet below grade within the vicinity of the sinkhole. We anticipate that loose soils extend deeper as 10 feet was the maximum explored depth. Mitigation of the sinkhole and soft on-site soils will require risk-based decision by USDA. At this time, we recommend that
USDA consider the two following options:
• Option 1: Complete general excavation around the sinkhole, void, and sagging mud mat areas to a depth of at least 3 feet below subgrade (or to the top of the metro station if shallower). The excavation should then be subsequently filled with stone and geogrid to provide a transfer platform. This approach remediates near-surface conditions but does not eliminate deep loose soils and potential future movement of soils at deeper zones.
Overexcavation to depths greater than 3 feet below subgrade (e.g., in areas outside the station limits or areas where the station is deeper than 3 feet) is an option to lower risk.
• Option 2: Complete Option 1 but also complete additional deep low-mobility grouting to remediate loose soils in the zone adjacent to the tunnel.
The preliminary recommended extents of the remediation are shown in Inset 2. Details of the proposed mitigation are provided in the following sections.
Inset 2 – Extent of Remediation
Washington, District of Columbia
Langan Project No.: 270144002
Demolition and Excavation
The existing pavement and mudmat should be removed in areas around the sinkhole and where loose soils were observed as shown in Inset 2; this area is approximately 600 square feet.
Carefully excavate the areas to a minimum of 3 feet below subgrade (or to the top of the metro station if shallower) to allow for inspection of the subgrade and sidewalls by a geotechnical engineer to assess the extent of loose soil conditions. We expect this work to be completed using a conventional excavator.
Excavation above the tunnel may need to be completed in phases so as not to remove excessive pressure from the tunnel. The maximum excavation area above the tunnel at any given time must be coordinated with WMATA. At this time, we recommend that the Contractor presume that the work above the tunnel would be completed in three equal sections for pricing.
Low Mobility (Compaction) Grouting
We recommend low mobility grouting be considered adjacent to the metro tunnel to reduce the potential for adverse impacts associated with potential future sinkhole activity. Low mobility grouting densifies loose granular soils and stabilizes subsurface voids or sinkholes. For pricing, we recommend a grid spacing of 5-foot centers be considered. Grout points should maintain a minimum distance of 5 feet from the metro station or as approved by WMATA. Pressurization of the grout may need to be lowered or be essentially zero during construction of grout points closest to the metro station. Acceptable pressurization of the grout and pressures on the station must be coordinated with WMATA. The final LMG improvement program should be designed by the specialty LMG contractor.
LMG should proceed by first installing casing to the top of competent soil (we anticipate this is
20 feet below grade at the sinkhole location and shallower moving away from the sinkhole). The top of the competent soil stratum should be determined by probing the soil using the rig at select locations in the improvement area prior to grouting operations. Grout is then pumped under pressure from the bottom up with grouting continuing in maximum 2-foot pull intervals. Grouting should continue up to a minimum of 3 feet below proposed subgrade (approximately 4 feet below surface grade).
During grouting, the depth, grout volume, and gauge pressure should be recorded. At each interval, grout should be placed until a pre-determined increase in grout pressure above the initial line pressure is achieved or until a maximum pre-determined volume of grout is placed. If the maximum grout volume is placed with no increase in line pressure, the geotechnical engineer of record and the specialty LMG contractor should be notified to determine the need for secondary grout points and/or additional grout volume per pull interval. The casing should then be completely extracted with the grout level maintained.
Secondary grout points may be required based on the observed grout takes at the primary grout points. We recommend budgeting consider a minimum of 25 percent contingency for secondary points. The target treatment zones for secondary grout points will need to be determined based
Washington, District of Columbia
Langan Project No.: 270144002 on the results of the primary grout points. The grouting program should consider perimeter barrier type-treatment layout (outside to inside) to minimize flow of grout beyond critical areas.
Grout should consist of a fine aggregate (sand) and cement mix. Typically, the grout slump should be 5 +/- 1 inch upon delivery and the minimum grout compressive strength should be 500 psi, or as specified by the specialty LMG contractor. Grout slump testing should be performed and cylinder samples should be cast for subsequent compressive strength testing by a qualified materials testing firm at regular intervals during production. Prior to pumping grout, the pump should be calibrated to determine the volume of grout for each pump stroke in accordance with applicable procedures.
Ground surface heave should be actively monitored when performing grout injection. Grout injection should be terminated if excessive heave is observed, especially near the metro station and elevator. We recommend that the pressure on the station and elevator shaft walls be monitored during LMG operations. Push-in type pressure cells can be installed as close as possible to station and metro walls to monitor applied pressures.
Fill Replacement
Filling of the over-excavation to the subgrade should be completed after completion of the demolition, excavation, and low-mobility grouting scope (if selected). Soil subgrades should be proofrolled with a walk-behind trench roller or a plate tamper. Additional proofrolling coverages should be performed in any areas deemed necessary based on observations made by a qualified geotechnical engineer. Soft areas identified during proofrolling above the station should be excavated and replaced with approved fill soil.
After proofroll, the excavated area should be subsequently lined with separation geotextile (Mirafi
140N or similar). The excavation should then be filled with open-graded stone as shown in Inset 3 in controlled, compacted lifts. We recommend presuming that fill will consist of No. 57 stone or similar open-graded stone to allow for use of lightweight vibratory plate tamper to compact the material directly above the tunnel. We recommend a minimum of one layer of tri-axial geogrid be included about 2 feet below bottom of pavement and be embedded in the stone fill. The stone material should be stopped at about 1 foot below the pavement or mud mat subgrade to allow for placement of any originally planned bedding materials.
Gravel fills should be placed in maximum 8-inch-thick lifts and each lift should be compacted with at least 4 passes of a vibratory plate compactor. Granular fill above the gravel fills or to replace unsuitable subgrades should also be placed in maximum 8-inch-thick lifts but compacted using a double drum walk-behind trench roller and compacted to at least 95 percent of the material’s maximum dry density in accordance with ASTM D698.
Washington, District of Columbia
Langan Project No.: 270144002
Inset 3 – Void and loose soil remediation
Depending on the extent of the loose/soft soils encountered, temporary slopes or shoring methods may be required. We recommend assuming a maximum excavation depth of about
6 feet at this time based on the maximum anticipated depth to the tunnel structure.
The recommendations given in this section are based limited subsurface exploration and review of available information. Final design of low-mobility grout points should be completed by a specialty contractor. Engineering oversight during the excavation and backfilling operations will be necessary to verify the extent of voids and soft zones at the site and proper implementation of the recommendations. All operations should be overseen by the Special Inspector of Record.
Deviations or areas of concerns should be immediately provided to the Geotechnical Engineer of
Record for review and coordination.
Washington, District of Columbia
Langan Project No.: 270144002
CLOSURE AND LIMITATIONS
This report presents our findings from the available information review and limited exploration results, and our recommendations relating to sinkhole repair. Recommendations given are contingent upon one another and no recommendation should be followed independent of the others. The recommendations are provided for cost estimating purposes by others. Langan cannot assume responsibility for the use of this report to generate recommendations for the site, structures, repair work, or any other future development beyond the proposed pavement resurfacing at the site or elsewhere.
Sincerely, Langan Engineering and Environmental Services, LLC
Amber Ganapathy
Project Engineer
Ronald Manney, PE
Associate Principal
Enclosure(s):
Figure 1 – Investigation Location Plan
Appendix A – 2019 Correspondence between AECOM and WMATA
Appendix B – Hand Auger Logs
Appendix C – Dynamic Cone Penetrometer (DCP) Logs
Appendix D – Geophysical Report from GPRS
Appendix E – Photographic Log
\\langan.com\Fed\270144002\Project Data\_Discipline\Geotechnical\Reports\Geotechnical Letter Report.docx
R 7' - 0
12' - 0
Approximate GPR Scan Area (Blue)
Approx. WMATA Metro Station Extents
HA-2
HA-1
DCP-03
DCP-01
DCP-02
DCP-04
DCP-09
DCP-05
DCP-06
DCP-07 DCP-08
NOTES:
1. BACKGROUND FOUNDATION PLAN PREPARED BY GUARDIAR.
2. HAND AUGERS HA-1 AND HA-2, AND GPR SCANNING PERFORMED IN OCTOBER 2025.
3. DYNAMIC CONE PENETRATION (DCP) TESTS, DCP-01 THROUGH DCP-09, PERFORMED ON 14 JANUARY 2026.
Metro Elevator
Approx. Sinkhole Location
ZOOMED IN:
FIGURE 1 - EXPLORATION LOCATION PLAN
APPENDIX A
LOT 9 CORRESPONDENCE WITH WMATA
& METRO STATION PLANS
Rivera, Gerardo - OCP, Washington, DC
From: John, Leonardo <LJohn@wmata.com> Sent: Friday, March 29, 2019 12:59 PM To: 'Teredesai, Rajul'; Lam, Bahn - OO, Washington, DC Cc: Walker, James L.; Li, Benli; Robinson, Thomas; 'Mercer, Rod'; 'Singh, Atul'; 'Miller, Jamie'; Majestic, Thomas Subject: RE: <External>RE: 251811 USDA Moat Wall Project - Adjacent, No Impact Letter with Conditions Attachments: USDA_lot 9-Exploration Plan, 02-06-2019.pdf; Pages from 1D0021 M-0051_1.pdf; Pages from 1D0021
M-0051_2.pdf; Pages from 1D0021 M-0051.pdf; 251811 No Impact with Conditions.pdf
CORRECTIONS:
Attached is the No Impact Letter and all pertinent information to perform the borings and test pits this weekend. Please be advised referencing our prior conversation Boring Location B‐3 may impact an existing steam tunnel (See attachment M‐0051_2). Please use all precautions to not damage the existing steam tunnel to include the relocation of boring B‐3.
Additionally, the escort contact information will be provided to you.
If you have additional comments, questions or concerns, please contact me.
Thank you
Leonardo S. John Jr.
Construction Engineer
WMATA Office of Joint Development & Adjacent Construction
3500 Pennsy Drive Room C106 Landover MD 20785 301‐618‐1191 Office 202‐309‐9445 Cell ljohn@wmata.com Visit the JDAC web page at Change your hyperlink to this address:
https://www.wmata.com/business/adjacent‐construction/index.cfm
From: John, Leonardo Sent: Friday, March 29, 2019 12:41 PM To: 'Teredesai, Rajul' <rajul.teredesai@aecom.com>; 'Lam, Bahn ‐ OO, Washington, DC' <Bahn.Lam@USDA.GOV> Cc: Walker, James L. <JLWalker@wmata.com>; Li, Benli <bli@wmata.com>; Robinson, Thomas <TRobinson@wmata.com>; Mercer, Rod <rod.mercer@aecom.com>; Singh, Atul <atul.singh@aecom.com>; Miller, Jamie <jamie.miller@aecom.com>; Majestic, Thomas <TMajestic@wmata.com> Subject: RE: <External>RE: 251811 USDA Moat Wall Project ‐ Adjacent, No Impact Letter with Conditions
Attached is the No Impact Letter and all pertinent information to perform the borings and test pit this weekend. Please be advised referencing our prior conversation Boring Location B‐3 may impact an existing steam tunnel (See attachment
M‐0051_2). Please use all precautions to no damage the existing steam tunnel to include the relocation of boring B‐3.
Additionally, the escort contact information will be provided to you.
If you have additional comments, questions or concerns, please contact me.
Construction Engineer
WMATA Office of Joint Development & Adjacent Construction
3500 Pennsy Drive Room C106 Landover MD 20785 301‐618‐1191 Office 202‐309‐9445 Cell ljohn@wmata.com Visit the JDAC web page at
From: Teredesai, Rajul <rajul.teredesai@aecom.com> Sent: Friday, March 29, 2019 9:42 AM To: John, Leonardo <LJohn@wmata.com>; 'Lam, Bahn ‐ OO, Washington, DC' <Bahn.Lam@USDA.GOV> Cc: Walker, James L. <JLWalker@wmata.com>; Li, Benli <bli@wmata.com>; Robinson, Thomas <TRobinson@wmata.com>; Mercer, Rod <rod.mercer@aecom.com>; Singh, Atul <atul.singh@aecom.com>; Miller, Jamie <jamie.miller@aecom.com> Subject: <External>RE: 251811 USDA Moat Wall Project ‐ Adjacent, No Impact Letter with Conditions
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and have verified the authenticity of the message.
Lonardo, This is a reminder/heads up that our crew will be working at the Whitten Building site this weekend (Saturday and Sunday from 8 am to 5 pm). Field contact is Atul Singh ((301) 278-6760)
Thanks
Rajul Teredesai, PE, PMP Geotechnical Engineering Team Lead, DC Metro Region D +1-301-820-3396 M +1-301-828-5001 rajul.teredesai@aecom.com
AECOM
12420 Milestone Center Drive Germantown, MD 20876, USA T +1-301-820-3000 aecom.com
Built to deliver a better world
LinkedIn Twitter Facebook Instagram
From: John, Leonardo [mailto:LJohn@wmata.com] Sent: Friday, March 15, 2019 2:38 PM To: 'Lam, Bahn - OO, Washington, DC'; Teredesai, Rajul Cc: Walker, James L.; Li, Benli; Robinson, Thomas Subject: 251811 USDA Moat Wall Project - Adjacent, No Impact Letter with Conditions
Per your request attached is a No Impact Letter with Conditions for the above referenced subject matter.
If you have additional questions, comments or concerns please contact me.
Construction Engineer
WMATA Office of Joint Development & Adjacent Construction
3500 Pennsy Drive Room C106 Landover MD 20785 301‐618‐1191 Office 202‐309‐9445 Cell ljohn@wmata.com Visit the JDAC web page at
New Barrier Foundation
SK – 1
11.21.18
Boring locationTest Pit Location
B-1 B-2 B-3
TP-1
TP-2
-20
Approximate Limits of Lot 9
E- Profile Thru WMATA Station
WMATA Station
New Barrier & Footing Finished Grade
±6 ft ±3 ft
SK – 2
11.21.18
8.
ft
.0 ft
.4 ft
0 ft
1 ft
2 ft
3 ft
4 ft
5 ft
Finished Grade
Bottom of Footing
6 ft Top of WMATA Structure
Top of WMATA Structure (north side)
1ft
4ft
Barrier Footing
Barrier (typ)
Conceptual Barrier & Footing Section
SK – 3
11.21.18
APPENDIX B
Hand Auger Logs
+33.0
+31.1
G -1
Began asphalt coring at 7:40 AM.
Hand auger refusal at 2.4 ft. End of hand augering at 12:45 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
ASPHALT (5.5 inches thick)
POORLY GRADED SAND with GRAVEL and SILT (SP-SM) Brown, medium dense, moist, f-c sand, f-c gravel
End of Hand Auger at 2.4 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
2.42 ft ofLOG OF TEST PIT DCP-01
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N T
P
+31.9
G -1
Began asphalt coring at 7:55 AM.
Hand auger refusal at 1.6 ft. End of hand augering at 1:15 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
ASPHALT (6.625 inches thick)
SILTY SAND with GRAVEL (SM) Brown, moist to wet, loose, f-c sand, f-c gravel
End of Hand Auger at 1.6 ft
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
1.58 ft ofLOG OF TEST PIT DCP-02
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+31.5
+27.3
G -1
Soil and asphalt above 2 ft were observed on sidewalls of the sinkhole.
Began hand augering at 12:15 PM.
Hand auger refusal at 6.3 ft. End of hand augering at 12:55 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
ASPHALT (6 inches thick)
POORLY GRADED SAND with GRAVEL (SP) Gray, loose to medium-dense, moist, f-c sand, f-c gravel Cobbles observed at this depth
SILTY SAND (SM)
Brown, loose to very loose, moist to wet, f-c sand, trace f-c rounded gravel
End of Hand Auger at 6.3 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
6.25 ft ofLOG OF TEST PIT DCP-03
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+33.1
+32.5
+25.2
G -1
G -2
Began concrete coring at 8:10 AM.
Hole collapsing at 6.8 ft after excavating to 8.3
ft. End of hand augering at 1:50 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
G R
A B
CONCRETE (4.25 to 4.5 inches thick)
POORLY GRADED GRAVEL with SAND (GP) Gray, very loose, f-c sand, f-c gravel, f-c sand
SILTY SAND with GRAVEL (SM) Brown, loose to very loose, moist to wet, f-c sand, f-c rounded gravel
Samples wet past 6.3 ft.
End of Hand Auger at 8.3 ft
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
6.33 ft
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
8.33 ft ofLOG OF TEST PIT DCP-04
6.6 ft
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+33.2
+32.4
+32.0
G -1
Began concrete coring at 8:25 AM.
Hand auger refusal at 1.5 ft. End of hand augering at 2:05 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
CONCRETE (3.75 to 4.25 inches thick)
POORLY GRADED GRAVEL with SAND (GP) Gray, very loose, f-c sand, f-c gravel, f-c sand
SILTY SAND with GRAVEL (SM) Brown, medium dense to very dense, moist to wet, f-c sand, f-c rounded gravel
End of Hand Auger at 1.5 ft
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
1.5 ft ofLOG OF TEST PIT DCP-05
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+31.8
Began asphalt coring at 8:40 AM.
Hand auger refusal at 1.7 ft. End of hand augering at 1:05 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
ASPHALT (6 to 6.25 inches thick)
POORLY GRADED SAND with SILT (SP-SM) Brown, moist to wet, loose to medium dense, f-c sand, f-c gravel
End of Hand Auger at 1.7 ft
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
1.67 ft ofLOG OF TEST PIT DCP-06
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+32.9
Began asphalt coring at 8:55 AM.
Hole surface-patched with concrete at 2:55 PM.
ASPHALT (6.75 to 7.75 inches thick)
End of Hand Auger at 0.65 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
0.65 ft ofLOG OF TEST PIT DCP-07
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+33.1
+32.1
Began concrete coring at 9:10 AM.
Hand auger refusal at 1.4 ft. Hole collapsing at 1 ft. End of hand augering at 12:20 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
CONCRETE (4 to 4.5 inches thick)
POORLY GRADED GRAVEL with SAND (GP) Gray, loose to medium dense, wet, f-c gravel, f-c sand
End of Hand Auger at 1.6 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
1.42 ft ofLOG OF TEST PIT DCP-08
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+33.2
+32.5
+31.8
G -1
Began concrete coring at 9:25 AM.
Hand auger refusal at 1.8 ft. End of hand augering at 2:40 PM. Hole backfilled with soil cuttings and surface-patched with concrete upon completion.
G R
A B
CONCRETE (3 to 3.75 inches thick)
POORLY GRADED GRAVEL with SAND (GP) Gray, loose to medium dense, wet, f-c gravel, f-c sand
SILTY SAND (SM)
Brown, loose to medium dense, moist to wet, f-c sand, f-c gravel
End of Hand Auger at 1.8 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
1/14/2026
Ben Sperry/Nick Desautelle Ben Sperry
1.75 ft ofLOG OF TEST PIT DCP-09
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+31.7
+30.3
Soil classifications are of the sidewall material above 1.83 ft.
Began hand augering at 08:35 at 1.83 ft.
Hand auger refusal at 3.2 ft. End of hand augering at 08:40. Borehole backfilled with soil cuttings upon completion.
ASPHALT (6 inches thick)
POORLY GRADED SAND WITH GRAVEL (SP)
Gray, loose to medium-dense, moist, f-c sand, f-c gravel Cobbles observed at this depth
SILTY SAND WITH GRAVEL (SM)
Brown, loose to medium-dense, moist to wet, f-c sand, f-c gravel
End of Hand Auger at 3.2 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
10/7/2025
Ben Sperry Ben Sperry
3.2 ft ofLOG OF TEST PIT HA-01
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
+31.7
+30.1
Soil classifications are of the sidewall material above 1.83 ft.
Began hand augering at 08:40 at 1.83 ft.
Hand auger refusal at 3.4 ft. End of hand augering at 08:45. Borehole backfilled with soil cuttings upon completion.
ASPHALT (6 inches thick)
POORLY GRADED SAND WITH GRAVEL (SP)
Gray, loose to medium-dense, moist, f-c sand, f-c gravel Cobbles observed at this depth
SILTY SAND WITH GRAVEL (SM)
Brown, loose to medium-dense, moist to wet, f-c sand, f-c gravel
End of Hand Auger at 3.4 ft.
FOREMAN
ELEV
(feet)
PROJECT NUMBER
+33.5
DESCRIPTION
WATER LEVEL - Completion
EQUIPMENT
LOCATION
3.0 inch O.D. Hand Auger
Langan
Washington DC Approx. el 33.5 ft (NAVD88)
LANGAN PERSONNEL
Depth Scale
T yp e
SAMPLE
DEPTH
N.E.
11Sheet
USDA Parking Lot 9
N u m b er
PROJECT NAME
Symbol
DATE
EXCAVATION CONTRACTOR
ELEVATION
10/7/2025
Ben Sperry Ben Sperry
3.4 ft ofLOG OF TEST PIT HA-02
N.E.
270144002
REMARKS
WATER LEVEL - First
\\L A
N G
A N
.C O
M \F
E D
\2
\P R
O
JE
C T
D A
T A
D
IS
C
IP
L
IN
E
\G E
O T
E C
H N
IC
A
L \G
IN
T
LO
G
S \2
H A
N D
A U
G E
R L
O G
S .G
P J
/2 6/
:5
8:
P M
. R ep or t:
Lo g
LA
N
G A
N
APPENDIX C
Dynamic Cone Penetrometer Logs
WILDCAT ADHESION CONE LOG Page 1 of 1
Langan
1300 Wilson Boulevard, Suite 450 PROJECT NUMBER: 270144002
Arlington, VA, 22209 DATE STARTED: 01-14-2026
DATE COMPLETED: 01-14-2026
HOLE #: DCP-1
CREW: Ben Sperry/Nick Desautelle SURFACE ELEVATION: N/A
PROJECT: USDA Lot 9 WATER ON COMPLETION: NE
ADDRESS: 1400 Jefferson Drive SW HAMMER WEIGHT: 35 lbs.
LOCATION: Washington DC, 20004 CONE AREA: 10 sq. cm
B L O
W S
P E
R c m
S L E
E V
E
T O
R Q
U E
A D
H E
S
IO
N
C O
N E
R E
S
IS
T A
N C
E
A D
H E
S
IO
N
R A
T
IO
GRAPH OF
CONE RESISTANCE
(kg/cm
DEPTH ft.-lbs. Kg/cm² Kg/cm² % 0 50 100 150 N'
- 1 ft 31
- 42
- 37
- 2 ft 37 15 3.62 164.28 2.20 ••••••••••••••••••••••••••••••••••••••••••••••••• 25+
- 15
- 16
- 3 ft 18 8 1.81 79.92 2.26 •••••••••••••••••••••••• 15
- 1 m 18
- 20
- 4 ft 22
- 31
- 25 8 1.81 96.50 1.87 ••••••••••••••••••••••••••••• 18
- 5 ft 14
- 15
- 20
- 6 ft 18 10 2.41 69.48 3.47 ••••••••••••••••••••• 13
- 20
- 2 m 20
- 7 ft 8
- 8 10 2.41 27.36 8.81 •••••••• 5
- 4
- 8 ft 6
- 6
- 5 8 1.81 17.10 10.57 •••••
- 9 ft 4
- 3
- 3 8 1.81 10.26 17.62 ••• 1
- 3 m 10 ft 3
- 11 ft
- 12 ft
- 4 m 13 ft
* SOFT CLAY, FAT CLAY,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .