Attachment 10 Electrical Scope addendum by JPA Inc 10.29.2025.pdf
PDF 168 KB Posted
- Solicitation number
- 124PCA27Q0002
About this file
This document is an Electrical Scopes specification for the USDA GSA Whitten Building Perimeter Security Enhancement Lot 9 project (JPA Project No. 8219-25), dated October 29, 2025.
The scope outlines six distinct electrical work areas requiring contractor investigation, verification, and installation: (1) Power from Panel SLE to HPU-1 and Gates—confirm and show the 2-inch conduit route, verify circuit breaker sizing to match HPU-1 nameplate data, confirm proper NEC circuit derivation for multiple loads in a single conduit, remove work associated with deleted sump pump SP-1, and confirm gate loads operate on 20A circuits rather than 25A; (2) Panel MDP-NDE Work—verify power sources to site lights, confirm which site light fixtures connect to Circuit 15, investigate existing conduit routes from building to site lights, verify circuits to 12th Street fixtures, and determine site light control locations and devices; (3) Moat Panel MP and Power Circuits to Site Receptacles—remove all conduit and wiring from Moat Panel MP to the in-ground box on the upper hill and associated in-ground box wiring, remove exposed conduits on north side parking lot, provide new concealed conduit in air shaft below and bore to new in-ground box at base of hill, provide new conduit from new in-ground box to top of hill box, coordinate new conduit installation with slab reinforcing, and provide new wiring from Moat Panel MP to post light and ground box devices; (4) Site Ground Box Receptacles—coordinate with building facilities to confirm receptacle types required in two parking lot utility boxes, provide shop drawings for correct outlets and weatherproof box mounting, provide ground rods per specifications, install missing lid screws, and install five additional in-ground utility boxes with rough-in conduits and wiring on southeast corner; (5) Post Light Fixtures—verify ground rods are installed and provide if missing, provide new concealed ground wire from pole to ground rod with concrete protection, and confirm power connections to 120V GFI duplex receptacles; and (6) Miscellaneous Conduit Stubs—confirm conduit use for bollard pad stubs and remove if not needed.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .