CORRECTED Attch 1 Schedule of Items_ Road Maintenance (002).xlsx
XLSX spreadsheet 58 KB Posted
- Attached to
- Road Maintenance IDIQ
- Solicitation number
- 12467020R0032
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Pay Item No. | Description Supplies/Services (Base Year April 2020 - 31 | ||||||||||
| March 2021) | Estimated Quantity | Pay Unit | Fuel <$1.99 | Fuel $2-$2.99 | Fuel $3-$3.99 | Fuel >$4 | |||||
| Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost |
| 210(01) A | Blading of Aggregate Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)B | Blading of Native Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)C | Road Surface Maintenance | |||||||||
| Utilizing "Smoothing" | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
220(20) Borrow Source Delivered and Placed for Roadway Embankment Repair from a Government Supplied On-Site Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(21) Select Borrow Source Delivered and Placed for Roadway Embankment Repair from an Off-site Commercial Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(22) Spot Surface Repair, Crushed Aggregate No. 1's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(23) Spot Surface Repair, Crushed Aggregate No. 4's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(24) Spot Surface Repair, Crushed Aggregate GABC (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(25) Spot Surface Repair, Crushed Aggregate Screenings (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
230(01) Clean and Reshape Ditches and Berm Removal 0.5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(01) Seeding, Dry method (Includes: preparation, seeding, and fertiliznig) 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(02) Mulching, Dry method 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(01) Removal of Fallen Tree from Roadways 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(02) Removal of Standing Tree Adjacent to Road 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
260(01) Dust Abatement of Road Using Approx. 2000 gal/mi 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(01) Machine Placed Riprap, Class II (2) (Includes furnishing & maching placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(02) Machine Placed Riprap, Class III (3) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(03) Machine Placed Riprap, Class IV (4) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(04) Geotextile, type C, Class 1 30 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
280(01) Emergency Movement of Contractor's Equipment- Slow Moving Transport 10 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).1 Trackhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).2 Backhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).3 Motorgrader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).4 Dump Truck with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).5 | Crawler Tractor with | |||||||||
| Operator | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).6 Front End Loader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).7 | Horizontal Shaft Rotary | |||||||||
| Mixer | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 290(01).8 | Compactive Equipment | |||||||||
| with Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).9 Chainsaw with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).10 Water Truck (4000 Gallons Minimum) with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(01) Roadside Mowing with Operator Single Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(02) Roadside Mowing with Operator - Double Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 310(01) | Compaction Equipment with | |||||||||
| Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 1.0 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
320(01) Drainage Inlet and Outlet Structure Cleaning- Minor (48 inch diameter or less) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
320(02) Drainage Inlet and Outlet Structure Cleaning- Major (Larger than 48 inch diameter) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
330(01) Roadside Brushing 1.0 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(01) 6-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(02) 8-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(03) Mirafi 600X Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(04) Mirafi HP370 Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for very poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(05) AASHTO M43 #67 Aggregate (Furnishing and placement of open-graded #67 aggregate inside geocells. 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 350(01) | Furnishing and placing topsoil, (4) inch depth | 150 | Square Yard | |||||
| (SY) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 350(02) | Furnishing and placing | |||||||||
| Fertilizer, dry method | 0.5 | Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
350(03) Furnishing, Placement, & Installation of Sod (Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order) 150 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(01) Silt Fencing (Includes furnishing, placement, and installation & removal after final acceptance) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(02) 100% Biodegradable Erosion Control Blanket for Ditches (ADS Geosynthetics, Curlex, Nilex or equiavalent. Includes furnishing and placement) 80 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(03) 100% Biodegradable 9-inch Straw Wattles (SediMax-SWB9 or equiavalent with 1"x1" stakes. Includes furnishing, placement, and installation) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(04) 100% Certified Weed Free Straw Bales (Includes furnishing, placement, and installation of strawbales with stakes included) 25 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
370(01) Bomag Soil Stabilizer/Recycler with Operator [RS 460 or equivalent] (Includes: pulveizing & mixing government provided RAP with aggregate at a 8"-9" inch depth on existing 14-ft wide roadway. Also includes watering, and compacting at 6-inch max layer depth w/ four (4) roller passes with a 15,652 lbs vibratory smooth-drum roller compactor or equal) 0.50 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL PRICE - Total Option (Items 210(01) – 370 (01)) $ - 0 $ - 0 $ - 0 $ - 0
Option Year 1
| Pay Item No. | Description Supplies/Services (Option Year 1 April 2021 - 31 | ||||||||||
| March 2022) | Estimated Quantity | Pay Unit | Fuel <$1.99 | Fuel $2-$2.99 | Fuel $3-$3.99 | Fuel >$4 | |||||
| Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost |
| 210(01) A | Blading of Aggregate Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)B | Blading of Native Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)C | Road Surface Maintenance | |||||||||
| Utilizing "Smoothing" | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
220(20) Borrow Source Delivered and Placed for Roadway Embankment Repair from a Government Supplied On-Site Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(21) Select Borrow Source Delivered and Placed for Roadway Embankment Repair from an Off-site Commercial Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(22) Spot Surface Repair, Crushed Aggregate No. 1's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(23) Spot Surface Repair, Crushed Aggregate No. 4's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(24) Spot Surface Repair, Crushed Aggregate GABC (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(25) Spot Surface Repair, Crushed Aggregate Screenings (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
230(01) Clean and Reshape Ditches and Berm Removal 0.5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(01) Seeding, Dry method (Includes: preparation, seeding, and fertiliznig) 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(02) Mulching, Dry method 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(01) Removal of Fallen Tree from Roadways 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(02) Removal of Standing Tree Adjacent to Road 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
260(01) Dust Abatement of Road Using Approx. 2000 gal/mi 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(01) Machine Placed Riprap, Class II (2) (Includes furnishing & maching placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(02) Machine Placed Riprap, Class III (3) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(03) Machine Placed Riprap, Class IV (4) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(04) Geotextile, type C, Class 1 30 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
280(01) Emergency Movement of Contractor's Equipment- Slow Moving Transport 10 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).1 Trackhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).2 Backhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).3 Motorgrader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).4 Dump Truck with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).5 | Crawler Tractor with | |||||||||
| Operator | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).6 Front End Loader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).7 | Horizontal Shaft Rotary | |||||||||
| Mixer | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 290(01).8 | Compactive Equipment | |||||||||
| with Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).9 Chainsaw with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).10 Water Truck (4000 Gallons Minimum) with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(01) Roadside Mowing with Operator Single Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(02) Roadside Mowing with Operator - Double Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 310(01) | Compaction Equipment with | |||||||||
| Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 1.0 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
320(01) Drainage Inlet and Outlet Structure Cleaning- Minor (48 inch diameter or less) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
320(02) Drainage Inlet and Outlet Structure Cleaning- Major (Larger than 48 inch diameter) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
330(01) Roadside Brushing 1.0 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(01) 6-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(02) 8-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(03) Mirafi 600X Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(04) Mirafi HP370 Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for very poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(05) AASHTO M43 #67 Aggregate (Furnishing and placement of open-graded #67 aggregate inside geocells. 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 350(01) | Furnishing and placing topsoil, (4) inch depth | 150 | Square Yard | |||||
| (SY) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 350(02) | Furnishing and placing | |||||||||
| Fertilizer, dry method | 0.5 | Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
350(03) Furnishing, Placement, & Installation of Sod (Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order) 150 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(01) Silt Fencing (Includes furnishing, placement, and installation & removal after final acceptance) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(02) 100% Biodegradable Erosion Control Blanket for Ditches (ADS Geosynthetics, Curlex, Nilex or equiavalent. Includes furnishing and placement) 80 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(03) 100% Biodegradable 9-inch Straw Wattles (SediMax-SWB9 or equiavalent with 1"x1" stakes. Includes furnishing, placement, and installation) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(04) 100% Certified Weed Free Straw Bales (Includes furnishing, placement, and installation of strawbales with stakes included) 25 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
370(01) Bomag Soil Stabilizer/Recycler with Operator [RS 460 or equivalent] (Includes: pulveizing & mixing government provided RAP with aggregate at 8-inch depth on existing 14-ft wide roadway. Also includes watering, and compacting at 6-inch max layer depth w/ three (3) passes with a 15,652 lbs vibratory smooth-drum roller compactor or equal) 0.50 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL PRICE - Total Option (Items 210(01) – 370 (01)) $ - 0 $ - 0 $ - 0 $ - 0
Option Year 2
| Pay Item No. | Description Supplies/Services (Option Year 2 April 2022 - 31 | ||||||||||
| March 2023) | Estimated Quantity | Pay Unit | Fuel <$1.99 | Fuel $2-$2.99 | Fuel $3-$3.99 | Fuel >$4 | |||||
| Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost |
| 210(01) A | Blading of Aggregate Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)B | Blading of Native Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)C | Road Surface Maintenance | |||||||||
| Utilizing "Smoothing" | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
220(20) Borrow Source Delivered and Placed for Roadway Embankment Repair from a Government Supplied On-Site Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(21) Select Borrow Source Delivered and Placed for Roadway Embankment Repair from an Off-site Commercial Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(22) Spot Surface Repair, Crushed Aggregate No. 1's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(23) Spot Surface Repair, Crushed Aggregate No. 4's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(24) Spot Surface Repair, Crushed Aggregate GABC (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(25) Spot Surface Repair, Crushed Aggregate Screenings (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
230(01) Clean and Reshape Ditches and Berm Removal 0.5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(01) Seeding, Dry method (Includes: preparation, seeding, and fertiliznig) 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(02) Mulching, Dry method 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(01) Removal of Fallen Tree from Roadways 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(02) Removal of Standing Tree Adjacent to Road 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
260(01) Dust Abatement of Road Using Approx. 2000 gal/mi 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(01) Machine Placed Riprap, Class II (2) (Includes furnishing & maching placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(02) Machine Placed Riprap, Class III (3) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(03) Machine Placed Riprap, Class IV (4) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(04) Geotextile, type C, Class 1 30 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
280(01) Emergency Movement of Contractor's Equipment- Slow Moving Transport 10 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).1 Trackhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).2 Backhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).3 Motorgrader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).4 Dump Truck with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).5 | Crawler Tractor with | |||||||||
| Operator | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).6 Front End Loader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).7 | Horizontal Shaft Rotary | |||||||||
| Mixer | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 290(01).8 | Compactive Equipment | |||||||||
| with Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).9 Chainsaw with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).10 Water Truck (4000 Gallons Minimum) with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(01) Roadside Mowing with Operator Single Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(02) Roadside Mowing with Operator - Double Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 310(01) | Compaction Equipment with | |||||||||
| Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 1.0 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
320(01) Drainage Inlet and Outlet Structure Cleaning- Minor (48 inch diameter or less) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
320(02) Drainage Inlet and Outlet Structure Cleaning- Major (Larger than 48 inch diameter) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
330(01) Roadside Brushing 1.0 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(01) 6-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(02) 8-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(03) Mirafi 600X Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(04) Mirafi HP370 Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for very poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(05) AASHTO M43 #67 Aggregate (Furnishing and placement of open-graded #67 aggregate inside geocells. 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 350(01) | Furnishing and placing topsoil, (4) inch depth | 150 | Square Yard | |||||
| (SY) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 350(02) | Furnishing and placing | |||||||||
| Fertilizer, dry method | 0.5 | Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
350(03) Furnishing, Placement, & Installation of Sod (Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order) 150 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(01) Silt Fencing (Includes furnishing, placement, and installation & removal after final acceptance) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(02) 100% Biodegradable Erosion Control Blanket for Ditches (ADS Geosynthetics, Curlex, Nilex or equiavalent. Includes furnishing and placement) 80 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(03) 100% Biodegradable 9-inch Straw Wattles (SediMax-SWB9 or equiavalent with 1"x1" stakes. Includes furnishing, placement, and installation) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(04) 100% Certified Weed Free Straw Bales (Includes furnishing, placement, and installation of strawbales with stakes included) 25 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
370(01) Bomag Soil Stabilizer/Recycler with Operator [RS 460 or equivalent] (Includes: pulveizing & mixing government provided RAP with aggregate at 8-inch depth on existing 14-ft wide roadway. Also includes watering, and compacting at 6-inch max layer depth w/ three (3) passes with a 15,652 lbs vibratory smooth-drum roller compactor or equal) 0.50 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL PRICE - Total Option (Items 210(01) – 370 (01)) $ - 0 $ - 0 $ - 0 $ - 0
Option Year 3
| Pay Item No. | Description Supplies/Services (Option Year 3 April 2023 - 31 | ||||||||||
| March 2024) | Estimated Quantity | Pay Unit | Fuel <$1.99 | Fuel $2-$2.99 | Fuel $3-$3.99 | Fuel >$4 | |||||
| Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost |
| 210(01) A | Blading of Aggregate Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)B | Blading of Native Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)C | Road Surface Maintenance | |||||||||
| Utilizing "Smoothing" | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
220(20) Borrow Source Delivered and Placed for Roadway Embankment Repair from a Government Supplied On-Site Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(21) Select Borrow Source Delivered and Placed for Roadway Embankment Repair from an Off-site Commercial Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(22) Spot Surface Repair, Crushed Aggregate No. 1's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(23) Spot Surface Repair, Crushed Aggregate No. 4's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(24) Spot Surface Repair, Crushed Aggregate GABC (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(25) Spot Surface Repair, Crushed Aggregate Screenings (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
230(01) Clean and Reshape Ditches and Berm Removal 0.5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(01) Seeding, Dry method (Includes: preparation, seeding, and fertiliznig) 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(02) Mulching, Dry method 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(01) Removal of Fallen Tree from Roadways 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(02) Removal of Standing Tree Adjacent to Road 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
260(01) Dust Abatement of Road Using Approx. 2000 gal/mi 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(01) Machine Placed Riprap, Class II (2) (Includes furnishing & maching placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(02) Machine Placed Riprap, Class III (3) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(03) Machine Placed Riprap, Class IV (4) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(04) Geotextile, type C, Class 1 30 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
280(01) Emergency Movement of Contractor's Equipment- Slow Moving Transport 10 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).1 Trackhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).2 Backhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).3 Motorgrader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).4 Dump Truck with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).5 | Crawler Tractor with | |||||||||
| Operator | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).6 Front End Loader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).7 | Horizontal Shaft Rotary | |||||||||
| Mixer | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 290(01).8 | Compactive Equipment | |||||||||
| with Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).9 Chainsaw with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).10 Water Truck (4000 Gallons Minimum) with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(01) Roadside Mowing with Operator Single Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(02) Roadside Mowing with Operator - Double Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 310(01) | Compaction Equipment with | |||||||||
| Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 1.0 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
320(01) Drainage Inlet and Outlet Structure Cleaning- Minor (48 inch diameter or less) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
320(02) Drainage Inlet and Outlet Structure Cleaning- Major (Larger than 48 inch diameter) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
330(01) Roadside Brushing 1.0 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(01) 6-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(02) 8-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(03) Mirafi 600X Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(04) Mirafi HP370 Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for very poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(05) AASHTO M43 #67 Aggregate (Furnishing and placement of open-graded #67 aggregate inside geocells. 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 350(01) | Furnishing and placing topsoil, (4) inch depth | 150 | Square Yard | |||||
| (SY) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 350(02) | Furnishing and placing | |||||||||
| Fertilizer, dry method | 0.5 | Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
350(03) Furnishing, Placement, & Installation of Sod (Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order) 150 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(01) Silt Fencing (Includes furnishing, placement, and installation & removal after final acceptance) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(02) 100% Biodegradable Erosion Control Blanket for Ditches (ADS Geosynthetics, Curlex, Nilex or equiavalent. Includes furnishing and placement) 80 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(03) 100% Biodegradable 9-inch Straw Wattles (SediMax-SWB9 or equiavalent with 1"x1" stakes. Includes furnishing, placement, and installation) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(04) 100% Certified Weed Free Straw Bales (Includes furnishing, placement, and installation of strawbales with stakes included) 25 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
370(01) Bomag Soil Stabilizer/Recycler with Operator [RS 460 or equivalent] (Includes: pulveizing & mixing government provided RAP with aggregate at 8-inch depth on existing 14-ft wide roadway. Also includes watering, and compacting at 6-inch max layer depth w/ three (3) passes with a 15,652 lbs vibratory smooth-drum roller compactor or equal) 0.50 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL PRICE - Total Option (Items 210(01) – 370 (01)) $ - 0 $ - 0 $ - 0 $ - 0
Option Year 4
| Pay Item No. | Description Supplies/Services (Option Year 4 April 2024 - 31 | ||||||||||
| March 2025) | Estimated Quantity | Pay Unit | Fuel <$1.99 | Fuel $2-$2.99 | Fuel $3-$3.99 | Fuel >$4 | |||||
| Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost | Unit Price | Total Cost |
| 210(01) A | Blading of Aggregate Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)B | Blading of Native Surfaced | |||||||||
| Roads | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 210(01)C | Road Surface Maintenance | |||||||||
| Utilizing "Smoothing" | 5 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
220(20) Borrow Source Delivered and Placed for Roadway Embankment Repair from a Government Supplied On-Site Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(21) Select Borrow Source Delivered and Placed for Roadway Embankment Repair from an Off-site Commercial Source [Compacted In-Place] 10 Cubic Yard (C.Y.) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(22) Spot Surface Repair, Crushed Aggregate No. 1's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(23) Spot Surface Repair, Crushed Aggregate No. 4's (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(24) Spot Surface Repair, Crushed Aggregate GABC (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
220(25) Spot Surface Repair, Crushed Aggregate Screenings (Includes furnishing, placement, and spreading w/ grader) 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
230(01) Clean and Reshape Ditches and Berm Removal 0.5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(01) Seeding, Dry method (Includes: preparation, seeding, and fertiliznig) 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
240(02) Mulching, Dry method 0.50 Acre $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(01) Removal of Fallen Tree from Roadways 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
250(02) Removal of Standing Tree Adjacent to Road 2 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
260(01) Dust Abatement of Road Using Approx. 2000 gal/mi 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(01) Machine Placed Riprap, Class II (2) (Includes furnishing & maching placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(02) Machine Placed Riprap, Class III (3) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(03) Machine Placed Riprap, Class IV (4) (Includes furnishing & machine placement) 17 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
270(04) Geotextile, type C, Class 1 30 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
280(01) Emergency Movement of Contractor's Equipment- Slow Moving Transport 10 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).1 Trackhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).2 Backhoe with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).3 Motorgrader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).4 Dump Truck with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).5 | Crawler Tractor with | |||||||||
| Operator | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).6 Front End Loader with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 290(01).7 | Horizontal Shaft Rotary | |||||||||
| Mixer | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 290(01).8 | Compactive Equipment | |||||||||
| with Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 8 | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
290(01).9 Chainsaw with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
290(01).10 Water Truck (4000 Gallons Minimum) with Operator 8 Hour $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(01) Roadside Mowing with Operator Single Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
301(02) Roadside Mowing with Operator - Double Width 5 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 310(01) | Compaction Equipment with | |||||||||
| Operator (Includes: 15,652 lbs vibratory smooth-drum roller compactor or equal w/ operator) | 1.0 | Mile | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
320(01) Drainage Inlet and Outlet Structure Cleaning- Minor (48 inch diameter or less) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
320(02) Drainage Inlet and Outlet Structure Cleaning- Major (Larger than 48 inch diameter) 1 Each $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
330(01) Roadside Brushing 1.0 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(01) 6-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(02) 8-inch Perforated Geocell, (Geoweb confinement system or equivalent... Includes labor and furnishing of all materials, assembling, and installation of geocell system which includes the Atra Keys Connection Devices, Rebar #3 J-Hooks 18- inches etc.. Granular infill aggregate not included. 1600 Square Feet (SF) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(03) Mirafi 600X Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(04) Mirafi HP370 Woven Geotextile or equivalent, (Includes furnishing and placement of HP370 woven geotextile or equivalent for very poor soils) 177 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
340(05) AASHTO M43 #67 Aggregate (Furnishing and placement of open-graded #67 aggregate inside geocells. 50 Ton $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 350(01) | Furnishing and placing topsoil, (4) inch depth | 150 | Square Yard | |||||
| (SY) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 350(02) | Furnishing and placing | |||||||||
| Fertilizer, dry method | 0.5 | Ton | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
350(03) Furnishing, Placement, & Installation of Sod (Bermuda/ Centipede/ Zoysia/St. Augustine/ Fescue/ Carpet/ Ryegrass or as specified in Task Order) 150 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(01) Silt Fencing (Includes furnishing, placement, and installation & removal after final acceptance) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(02) 100% Biodegradable Erosion Control Blanket for Ditches (ADS Geosynthetics, Curlex, Nilex or equiavalent. Includes furnishing and placement) 80 Square Yard (SY) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(03) 100% Biodegradable 9-inch Straw Wattles (SediMax-SWB9 or equiavalent with 1"x1" stakes. Includes furnishing, placement, and installation) 50 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
360(04) 100% Certified Weed Free Straw Bales (Includes furnishing, placement, and installation of strawbales with stakes included) 25 L.F. $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
370(01) Bomag Soil Stabilizer/Recycler with Operator [RS 460 or equivalent] (Includes: pulveizing & mixing government provided RAP with aggregate at 8-inch depth on existing 14-ft wide roadway. Also includes watering, and compacting at 6-inch max layer depth w/ three (3) passes with a 15,652 lbs vibratory smooth-drum roller compactor or equal) 0.50 Mile $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TOTAL PRICE - Total Option (Items 210(01) – 370 (01)) $ - 0 $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .