Attachment_3_Experience_Info_Sheet.docx
DOCX document 21 KB Posted
- Solicitation number
- 12456818R0012
About this file
Attachment 03- Experience Info Sheet
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12456818R0012 Attachment 3
EXPERIENCE INFORMATION SHEET
(Adjust formatting as needed without changing the font, limited to two pages per contract.)
1. Contract/Subcontract No.: _________________________
2. Project Name & current POC information (name/job tite/phone#/e-mail):
3. Location work was performed: __________________________________
4. Date work was completed (must be within last 5 years): ______________
a. If work is still ongoing, date work was 50% completed: _____________
5. Final cost of this project: $_______________
6. Clearly describe what part of the work was performed by the firm for which the experience information is submitted. Provide dollar magnitude for each of the following categories if multiple categories are selected.
a. Building renovations, including floors, doors, walls, windows, and external facades:
12456818R0012 Attachment 3
EXPERIENCE INFORMATION SHEET
b. Repair/replacement of major building systems such as electrical, mechanical, and HVAC:
c. Civil work, including earthwork and drainage structures:
d. Environmental work:
7. Work was performed as a: Prime Joint Venture Subcontractor
SOLICITATION NUMBER: 12456818R0012
TITLE: Corvallis HVAC Replacement and Energy Upgrades
File details come from the government source that posted it.