Bell Smith Springs Abstract Contractor Totals.xls
XLS spreadsheet 58 KB Posted
- Attached to
- GAOA Bell Smith Springs Repaving and Parking
- Solicitation number
- 12445526B0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Bid Abstract documenting the competitive bids received for solicitation 12445526B0004, the GAOA Bell Smith Springs Repaving and Parking project for the USDA Forest Service Shawnee National Forest. Eight contractors submitted bids for repaving and miscellaneous construction work in Pope County, Illinois. The bid abstract tabulates unit prices and extended amounts for 26 line items across all eight offerors: Chris Harner Excavating ($565,098.18), Construction Solutions ($1,633,353.05), GC Works ($1,796,187.00), Heartland Services ($1,387,387.00), LaFore Civil Construction ($1,220,123.82), Gideon Contracting ($1,987,759.00), McKenzie Construction ($1,693,656.06), and AR Martin Construction ($1,295,705.00). LaFore Civil Construction submitted the lowest responsive bid at $1,220,123.82.
The work scope includes mobilization, clearing and grubbing, removal of structures (historic stone headwall and timber bollards), roadway excavation, aggregate base and surface work, recondition of roadbed and ditches, asphalt and chip seal placement, reinforcing steel, concrete structures, corrugated steel pipe installation in multiple diameters, underdrains with geotextile, bollards, stone masonry, parking blocks, water line removal, silt fence, and class 2 woven geotextile fabric. Bid opening was conducted via Microsoft Teams, with questions due by March 12, 2026, and the submission deadline extended to March 31, 2026 at 3:00 PM ET. Award is to be made to the lowest responsive bidder.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| BID ABSTRACT | |||||||||||||||||||||
| ISSUING OFFICE: | I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. | ||||||||||||||||||||
| Address | |||||||||||||||||||||
| change schedule of items and gov't est unit price | |||||||||||||||||||||
| Signature: | Date: | ||||||||||||||||||||
| SOLICITATION NO.: | 12445526B0004 | ||||||||||||||||||||
| PROJECT: | GAOA Bell Smith Springs Repaving and Parking | OFFEROR NO. 1 | OFFEROR NO. 2 | OFFEROR NO. 3 | OFFEROR NO. 4 | OFFEROR NO. 5 | OFFEROR NO. 6 | OFFEROR NO. 7 | OFFEROR NO. 8 | ||||||||||||
| Vendor Name: | Chris Harner Excavating | Construction Solutions | GC Works | Heartland Services | LaFore Civil Construction | Gideon Contracting | McKenzie Contruction | AR Martin Construction | |||||||||||||
| Vendor City/State: | |||||||||||||||||||||
| Amendments Acknowledged: | |||||||||||||||||||||
| Acceptance Time | |||||||||||||||||||||
| UEI # | |||||||||||||||||||||
| Business Size | |||||||||||||||||||||
| Bid Guarantee: | |||||||||||||||||||||
| Government Estimate | |||||||||||||||||||||
| ITEM | EST. | UNIT | EST. | UNIT | UNIT | UNIT | UNIT | UNIT | UNIT | UNIT | UNIT | ||||||||||
| NO. | DESCRIPTION | QTY. | UNIT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT | PRICE | AMOUNT |
| 15101 | Mobilization | 1 | LS | $19,277.31 | $19,277.31 | $450,000.00 | $450,000.00 | $239,400.00 | $239,400.00 | $136,062.39 | $136,062.39 | $57,500.00 | $57,500.00 | $23,209.94 | $23,209.94 | $432,191.06 | $432,191.06 | $65,705.00 | $65,705.00 | ||
| 20102 | Clearing and Grubbing, new Parking area | 1 | LS | $8,500.00 | $8,500.00 | $50,000.00 | $50,000.00 | $30,000.00 | $30,000.00 | $113,361.00 | $113,361.00 | $31,500.00 | $31,500.00 | $135,219.17 | $135,219.17 | $56,359.00 | $56,359.00 | $65,879.00 | $65,879.00 | ||
| 20303 | Removal of Structures. Remove Historic Stone Headwall, salvage | 1 | EA | $6,500.00 | $6,500.00 | $3,000.00 | $3,000.00 | $60,000.00 | $60,000.00 | $24,290.00 | $24,290.00 | $8,125.00 | $8,125.00 | $4,969.46 | $4,969.46 | $9,158.00 | $9,158.00 | $12,883.00 | $12,883.00 | ||
| 20304 | Removal of Structures. Remove timber bollards, disposal method A | 6 | EA | $25.00 | $150.00 | $250.00 | $1,500.00 | $1,800.00 | $10,800.00 | $121.45 | $728.70 | $185.00 | $1,110.00 | $1,140.48 | $6,842.88 | $208.00 | $1,248.00 | $253.00 | $1,518.00 | ||
| 20404 | Roadway excavation (Parking area construction) placement method 2 | 1 | LS | $5,200.00 | $5,200.00 | $10,000.00 | $10,000.00 | $58,800.00 | $58,800.00 | $35,177.21 | $35,177.21 | $28,775.00 | $28,775.00 | $54,888.46 | $54,888.46 | $11,272.00 | $11,272.00 | $73,476.00 | $73,476.00 | ||
| 30104-A | Aggregate Base, grading (Parking areas), IL CA6, compaction method 2 | 410 | Ton | $25.00 | $10,250.00 | $55.03 | $22,562.30 | $16.00 | $6,560.00 | $99.38 | $40,745.80 | $93.85 | $38,478.50 | $129.49 | $53,090.90 | $65.00 | $26,650.00 | $84.00 | $34,440.00 | ||
| 30104-B | Aggregate Surface, grading (Hunting Branch picnic area roadway), IL CA6, compaction method 2 | 60 | Ton | $70.00 | $4,200.00 | $75.00 | $4,500.00 | $42.00 | $2,520.00 | $99.38 | $5,962.80 | $134.75 | $8,085.00 | $256.10 | $15,366.00 | $65.00 | $3,900.00 | $106.00 | $6,360.00 | ||
| 30307 | Recondition of Roadbed and Roadside Ditches, Compaction B | 1 | LS | $162,101.00 | $162,101.00 | $50,000.00 | $50,000.00 | $420,000.00 | $420,000.00 | $455,874.00 | $455,874.00 | $87,625.00 | $87,625.00 | $640,999.80 | $640,999.80 | $342,206.00 | $342,206.00 | $171,509.00 | $171,509.00 | ||
| 40712C | Placing and Finishing asphalt and 3/8" aggregate. Double Course Chip Seal | 1 | LS | $196,603.41 | $196,603.41 | $827,000.00 | $827,000.00 | $540,000.00 | $540,000.00 | $212,407.54 | $212,407.54 | $724,250.00 | $724,250.00 | $518,156.95 | $518,156.95 | $590,925.00 | $590,925.00 | $524,474.00 | $524,474.00 | ||
| 55401 | Furnishing and placing reinforcing steel | 140 | Pound | $8.00 | $1,120.00 | $50.00 | $7,000.00 | $66.00 | $9,240.00 | $21.68 | $3,035.20 | $12.00 | $1,680.00 | $51.49 | $7,208.60 | $13.00 | $1,820.00 | $29.00 | $4,060.00 | ||
| 60101 | Minor concrete structures. Concrete Headwalls for small pipe culvert | 2 | CY | $2,200.00 | $4,400.00 | $5,000.00 | $10,000.00 | $24,000.00 | $48,000.00 | $3,036.25 | $6,072.50 | $2,300.00 | $4,600.00 | $3,276.43 | $6,552.86 | $2,592.00 | $5,184.00 | $3,778.00 | $7,556.00 | ||
| 60230-A | 18 inch aluminized steel, type 2, corrugated steel pipe, 0.064 inch thickness, compaction method B | 985 | CY | $68.00 | $66,980.00 | $93.95 | $92,540.75 | $54.00 | $53,190.00 | $196.23 | $193,286.55 | $101.25 | $99,731.25 | $272.64 | $268,550.40 | $109.00 | $107,365.00 | $170.00 | $167,450.00 | ||
| 60230-B | 24 inch squash aluminized steel, type 2, corrugated steel pipe, 0.064 inch thickness, compaction method B | 224 | LF | $160.24 | $35,893.76 | $109.30 | $24,483.20 | $54.00 | $12,096.00 | $205.25 | $45,976.00 | $121.75 | $27,272.00 | $320.91 | $71,883.84 | $127.00 | $28,448.00 | $235.00 | $52,640.00 | ||
| 60230-C | 24 inch aluminized steel, type 2, corrugated steel pipe, 0.064 inch thickness, compaction method B | 40 | LF | $86.58 | $3,463.20 | $100.22 | $4,008.80 | $54.00 | $2,160.00 | $202.82 | $8,112.80 | $149.00 | $5,960.00 | $273.84 | $10,953.60 | $117.00 | $4,680.00 | $199.00 | $7,960.00 | ||
| 60230-D | 48 inch aluminized steel, type 2, corrugated steel pipe, 0.109 inch thickness, compaction method B | 50 | LF | $242.07 | $12,103.50 | $184.04 | $9,202.00 | $54.00 | $2,700.00 | $316.18 | $15,809.00 | $800.00 | $40,000.00 | $318.35 | $15,917.50 | $220.00 | $11,000.00 | $601.00 | $30,050.00 | ||
| 60504A | Furnishing and installing Underdrains, conforming to 714.01 Geotextile | 1 | LS | $2,820.00 | $2,820.00 | $7,500.00 | $7,500.00 | $3,000.00 | $3,000.00 | $3,036.25 | $3,036.25 | $4,115.00 | $4,115.00 | $30,784.46 | $30,784.46 | $4,638.00 | $4,638.00 | $8,344.00 | $8,344.00 | ||
| 61908 | Furnishing and installing Bollards, conforming to 710.04a Fence Posts and Bollards, 8"x8"x6' | 32 | EA | $100.00 | $3,200.00 | $350.00 | $11,200.00 | $2,580.00 | $82,560.00 | $1,521.76 | $48,696.32 | $345.00 | $11,040.00 | $1,020.95 | $32,670.40 | $388.00 | $12,416.00 | $526.00 | $16,832.00 | ||
| 62005 | Stone Masonry, resetting Historic Stone Headwall | 1 | EA | $5,000.00 | $5,000.00 | $10,000.00 | $10,000.00 | $48,000.00 | $48,000.00 | $24,290.00 | $24,290.00 | $14,250.00 | $14,250.00 | $11,979.39 | $11,979.39 | $16,062.00 | $16,062.00 | $19,220.00 | $19,220.00 | ||
| 62301-A | Furnishing and installing Parking Blocks | 89 | EA | $110.00 | $9,790.00 | $200.00 | $17,800.00 | $653.00 | $58,117.00 | $76.50 | $6,808.50 | $182.00 | $16,198.00 | $465.16 | $41,399.24 | $205.00 | $18,245.00 | $149.00 | $13,261.00 | ||
| 62301-B | Remove and dispose water spigot and cap off 1" diameter water line | 1 | LS | $300.00 | $300.00 | $2,000.00 | $2,000.00 | $6,000.00 | $6,000.00 | $700.00 | $700.00 | $1,175.75 | $1,175.75 | $6,185.57 | $6,185.57 | $1,325.00 | $1,325.00 | $960.00 | $960.00 | ||
| 71316 | Furnishing and installing Silt Fence (parking area construction) | 800 | LF | $2.00 | $1,600.00 | $5.00 | $4,000.00 | $30.00 | $24,000.00 | $3.00 | $2,400.00 | $5.50 | $4,400.00 | $14.69 | $11,752.00 | $6.00 | $4,800.00 | $4.50 | $3,600.00 | ||
| 71401 | Furnishing and installing Class 2 Woven Geotextile Fabric (parking areas) | 1882 | SY | $3.00 | $5,646.00 | $8.00 | $15,056.00 | $42.00 | $79,044.00 | $2.42 | $4,554.44 | $2.26 | $4,253.32 | $10.19 | $19,177.58 | $2.00 | $3,764.00 | $4.00 | $7,528.00 | ||
| Total | $0.00 | $565,098.18 | $1,633,353.05 | $1,796,187.00 | $1,387,387.00 | $1,220,123.82 | $1,987,759.00 | $1,693,656.06 | $1,295,705.00 | ||||||||||||
| TOTAL | Bid | $0.00 | $565,098.18 | $1,633,353.05 | $1,796,187.00 | $1,387,387.00 | $1,220,123.82 | $1,987,759.00 | $1,693,656.06 | $1,295,705.00 |