Attachment 9 Statement of Work_BSS Repaving.pdf
PDF 107 KB Posted
- Attached to
- GAOA Bell Smith Springs Repaving and Parking
- Solicitation number
- 12445526B0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for a roadway and infrastructure improvement project located in the Shawnee National Forest on the Hidden Springs Ranger District. The contractor shall perform mobilization, drainage excavation, brushing, clearing and grubbing, aggregate base and surface placement, roadway reconditioning, roadway excavation and new construction, culvert removal and installation, small culvert headwall removal and installation, and specialty masonry work to remove and replace a historic stone headwall.
The contractor has full use of Forest roads during the construction period, subject to the Government's right to perform work or retain other contractors on project portions. The contractor must conduct operations to minimize inconvenience to the public and employees, obtain written Contracting Officer approval for road closures, confine material storage to approved areas, and provide adequate signing, barricades, and safety measures to protect the public. The contractor shall minimize disturbance to all undisturbed areas.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
PART 1 - GENERAL
SUMMARY
Work for this project consists of, but is not limited to: mobilization, drainage excavation, brushing, clearing and grubbing, aggregate base and surface placement, roadway reconditioning, roadway excavation / new roadway construction, culvert removal / new installation, small culvert headwall removal / installation, and specialty masonry to remove and replace a historic stone headwall.
LOCATION
This project is located in the Shawnee National Forest on the Hidden Springs Ranger District.
USE OF PREMISES
General: Contractor shall have full use of Forest roads for construction operations, during construction period. Contractor's use of Forest roads is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. Road closures will be permitted, when required, upon written approval of the Contracting Officer (CO).
Confine storage of materials to areas as approved by the CO.
Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all operations. Contractor shall minimize disturbance of all undisturbed areas.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)