Attachment 7 General Notes_BSS Repaving.pdf
PDF 146 KB Posted
- Attached to
- GAOA Bell Smith Springs Repaving and Parking
- Solicitation number
- 12445526B0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains General Notes for a federal construction contract, likely part of a Statement of Work or Special Project Specifications for forest road and culvert work. The notes establish contractor requirements and responsibilities for a road construction and infrastructure project on Federal lands, with oversight by the Forest Service and an Engineer.
Key contractor obligations include: calling Illinois 1 Call JULIE (800-892-0123 or 811) prior to earth-disturbing activities to locate underground utilities; furnishing, erecting, and maintaining minimum barricades and warning signs conforming to the Manual on Uniform Traffic Control Devices (MUTCD) until final inspection and acceptance, with all "ROAD CONSTRUCTION AHEAD" signs requiring Forest Service approval and coverage during non-work periods; completing roads to prevent water ponding on roadbed or ditch lines; hauling removed corrugated metal pipe culverts off Federal lands (becoming contractor property unless designated for salvage); and performing contouring, topsoil re-spreading, seeding, and mulching of disturbed areas as directed by the Forest Service, with these activities considered incidental to the 60230 culvert pay items. The contractor bears full responsibility and expense for repairing all areas damaged by their operations, including required seeding and mulching.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Notes
- Prior to any earth disturbing activities, contractor shall call the Illinois 1 call JULIE (800-892-0123 or 811) in the work area to determine locations of any underground utility lines.
- Contractor shall furnish, erect and maintain the minimum barricades and warning signs identified in the Special Project Specifications until final inspection and acceptance, unless otherwise directed by the Engineer.
Signs shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Contractor shall install “ROAD CONSTRUCTION AHEAD” signs on all roads in this project area. Contractor’s sign plan must be approved by Forest Service prior to work. Signs will be covered on weekends, holidays and any days when contractor is not working.
- Roads shall be completed in such a manner that water shall not pond on roadbed or in ditch lines.
- All removed corrugated metal pipe culverts shall be hauled off Federal lands and become the property of the contractor, unless otherwise indicated for salvage.
- Contouring, topsoil re-spreading, seeding and mulching of disturbed areas as determined by the Forest Service is required. All disturbed areas shall be seeded and mulched and is considered incidental to the 60230 culvert pay items. Contractor shall be responsible for repairing all other areas damaged by their operations at their expense, including the seeding and mulching.