Attach 6_Big Tree Trail Conditional Survey.xlsx

XLSX spreadsheet 825 KB Posted

Attached to
USDA Forest Service El Yunque National Forest La Mina and Big Tree Recreation Trail and Bridge Design Services
Solicitation number
1243ZP20Q0008
Issued by

About this file

This document contains details for a federal contract opportunity to design reconstruction plans for recreation trails and bridges located in El Yunque National Forest in Puerto Rico. The USDA Forest Service Southern Region El Yunque National Forest is seeking proposals for design and development of contract documents including drawings, specifications, cost estimates and other materials ready for advertisement of reconstruction of the Big Tree Trail and La Mina Trail as well as associated trail bridges. The project is a 100% small business set-aside. Professional engineering stamps will be required from a Puerto Rico-licensed engineer. Final approved construction documents will be used for subsequent on-site reconstruction work. The estimated construction cost is between $900,000 and $1,300,000. The performance period for design services is 110 days. Non-mandatory site showings will be held on January 8th and 9th, 2020 at the Palo Colorado Recreation Site parking lot for up to 40 people per day, with additional dates as needed.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Big Tree Trail Condition Survey 8/31/2018
Worklist
NAD 27
StationLatitudeLongitudeFeatureWork Item or description of pointPhoto
0+0018.30851-65.775124No WorkStart Big Tree Trail, parking lot
5+2818.307695-65.774112Tread Repair and RerouteReplace 16 ft concrete with gravel surfacing and realign approximately 12 ft of trail approx. 3 ft north around root ball.
7+9218.307484-65.774183Handrail & PostsReplace missing 2x6 wood handrails top and bottom for 32 ft length

Add 2-8ft section of railing and posts for total of 48 ft long railing section

8+9718.307475-65.773954Remove approximately 20 linear feet of damaged concrete tread and replace with gravel surfaced tread on geogrid pavers. Replace approximately 10 cy subgrade with suitable compacted native material.
10+0318.307288-65.774089Landslide RemovalClear 10 CY landslide from trail
10+5618.307298-65774162No Workcontrol point
11+0918.307229-65.77421Handrail, Posts, Tread Repair,Fill hole approx. 3 ft deep x 8 ft long x 3 ft wide with suitable compacted native fill and place 4-in gravel trail surfacing on geogrid.

Reset 2 - 4in x 4in wood posts and 1 - 6 ft section of handrail top and bottom Replace 1-12 ft section of wood handrail top and bottom

12+1418.307343-65.774318HandrailReplace wood handrail top 1-6ft and 1-12ft section
13+7318.307193-65.774722HandrailReplace 1-16 ft wood handrail top and bottom
14+2318.307191-65.774752Tread RepairFill hole, 4 CF gravel
14+7818.307125-65.774948No WorkStart - Bridge
15+0418.307067-65.774968No WorkEnd - Bridge
17+4218.306454-65774795No Workcontrol point
18+4818.306320-65.77483Tread Repair, RerouteRoot ball damage of trail. Remove concrete slab and reroute approximately 12 ft of the trail 3-4 ft to the south. Re-establish trail with gravel on geogrid pavers.
19+0018.306263-65.774835No Workcontrol point
22+5818.304194-65.774724Tread RepairTrail damage. Fill hole with 14 CF (1/2 CY) gravel
25+3518.304583-65.774553Handrail, Reroute, Tread RepairReestablish trail across landslide.

Reroute trail into slope, gravel surface.

Install 24 ft wood handrail, top and bottom with 3 wood posts

25+6518.304596-65.774633HandrailStart - Replace 24 ft wood handrails top and bottom
25+7718.304618-65.774667HandrailEnd - Replace 24 ft wood handrails top and bottom
25+9218.30464-65.774624HandrailStart - Replace 16 ft wood handrails top and bottom
26+7318.304788-65.774796HandrailEnd - Handrail replacement
27+7618.304867-65.775042Handrail & PostsReplace wood handrails and 3 - 4in x 4in wood posts, 24ft length total
27+9618.304885-65.775101No Workcontrol point
28+0518.30490-65.775123Handrail, Landslide Removal & Tread RepairStart - Wood handrail replacement.

Start of landlide 8 ft past end of rail, remove approx. 50 cy of material and re-establish trail

28+7618.304955-65.775276HandrailEnd - Remove and replace wood handrail and posts
33+1018.304975-65.776229RerouteStart trail reroute around landslide
33+4518.304892-65.776215RerouteEnd Trail Reroute around landslide
34+1018.304771-65.776096Handrail, Landslide RemovalRepair 2 concrete post and secure GSP rails

Remove 50 cy landslide materil from trail

35+7518.304445-65.772988No WorkCP62
36+6018.304259-65.775911Tread RepairStart remove concrete and replace with gravel on geogrid and eliminate outslope
37+5218.304134-65.775691Tread RepairCP 63

End remove concrete and replace with gravel on geogrid and eliminate outslope

38+0218.304001-65.775716No WorkCP64
42+0518.303630-65.77654HandrailWeld new GSP handrail to existing for distance of 12 ft, offset toward trail min of 8 inches to a max of 16 inches to close gap between existing rail and edge of trail
43+2418.303360-65.77672HandrailSecure wood railing to existing post
44+1618.303458-65.776859HandrailRepair break in GSP rail
44+4718.303429-65.776936Handrail & PostsRepair top of 2 posts

Replace top 8 ft GSP rail 44+59 18.303420 -65.77696 Tread, Handrail & Posts Grout 2ft x 4in x 16in crack in concrete slab, Replace 5 ft GSP rail.

Repair top of concrete post Replace 2-6ft GSP rails (top and bottom)

45+2818.303320-6577704Handrail & PostsReplace 2-12ft GSP rails, 1-8ft rail, 2-6ft rails (top & bottom), and 2 concrete posts
45+9318.30575-65.777519No WorkIntersection with La Mina Trail
All wood handrail 2" x 6"
All GSP handrail 2"