Attach 6_Big Tree Trail Conditional Survey.xlsx
XLSX spreadsheet 825 KB Posted
- Solicitation number
- 1243ZP20Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains details for a federal contract opportunity to design reconstruction plans for recreation trails and bridges located in El Yunque National Forest in Puerto Rico. The USDA Forest Service Southern Region El Yunque National Forest is seeking proposals for design and development of contract documents including drawings, specifications, cost estimates and other materials ready for advertisement of reconstruction of the Big Tree Trail and La Mina Trail as well as associated trail bridges. The project is a 100% small business set-aside. Professional engineering stamps will be required from a Puerto Rico-licensed engineer. Final approved construction documents will be used for subsequent on-site reconstruction work. The estimated construction cost is between $900,000 and $1,300,000. The performance period for design services is 110 days. Non-mandatory site showings will be held on January 8th and 9th, 2020 at the Palo Colorado Recreation Site parking lot for up to 40 people per day, with additional dates as needed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Big Tree Trail Condition Survey 8/31/2018 | |||||
| Worklist | |||||
| NAD 27 | |||||
| Station | Latitude | Longitude | Feature | Work Item or description of point | Photo |
| 0+00 | 18.30851 | -65.775124 | No Work | Start Big Tree Trail, parking lot | |
| 5+28 | 18.307695 | -65.774112 | Tread Repair and Reroute | Replace 16 ft concrete with gravel surfacing and realign approximately 12 ft of trail approx. 3 ft north around root ball. | |
| 7+92 | 18.307484 | -65.774183 | Handrail & Posts | Replace missing 2x6 wood handrails top and bottom for 32 ft length |
Add 2-8ft section of railing and posts for total of 48 ft long railing section
| 8+97 | 18.307475 | -65.773954 | Remove approximately 20 linear feet of damaged concrete tread and replace with gravel surfaced tread on geogrid pavers. Replace approximately 10 cy subgrade with suitable compacted native material. | |
| 10+03 | 18.307288 | -65.774089 | Landslide Removal | Clear 10 CY landslide from trail |
| 10+56 | 18.307298 | -65774162 | No Work | control point |
| 11+09 | 18.307229 | -65.77421 | Handrail, Posts, Tread Repair, | Fill hole approx. 3 ft deep x 8 ft long x 3 ft wide with suitable compacted native fill and place 4-in gravel trail surfacing on geogrid. |
Reset 2 - 4in x 4in wood posts and 1 - 6 ft section of handrail top and bottom Replace 1-12 ft section of wood handrail top and bottom
| 12+14 | 18.307343 | -65.774318 | Handrail | Replace wood handrail top 1-6ft and 1-12ft section |
| 13+73 | 18.307193 | -65.774722 | Handrail | Replace 1-16 ft wood handrail top and bottom |
| 14+23 | 18.307191 | -65.774752 | Tread Repair | Fill hole, 4 CF gravel |
| 14+78 | 18.307125 | -65.774948 | No Work | Start - Bridge |
| 15+04 | 18.307067 | -65.774968 | No Work | End - Bridge |
| 17+42 | 18.306454 | -65774795 | No Work | control point |
| 18+48 | 18.306320 | -65.77483 | Tread Repair, Reroute | Root ball damage of trail. Remove concrete slab and reroute approximately 12 ft of the trail 3-4 ft to the south. Re-establish trail with gravel on geogrid pavers. |
| 19+00 | 18.306263 | -65.774835 | No Work | control point |
| 22+58 | 18.304194 | -65.774724 | Tread Repair | Trail damage. Fill hole with 14 CF (1/2 CY) gravel |
| 25+35 | 18.304583 | -65.774553 | Handrail, Reroute, Tread Repair | Reestablish trail across landslide. |
Reroute trail into slope, gravel surface.
Install 24 ft wood handrail, top and bottom with 3 wood posts
| 25+65 | 18.304596 | -65.774633 | Handrail | Start - Replace 24 ft wood handrails top and bottom |
| 25+77 | 18.304618 | -65.774667 | Handrail | End - Replace 24 ft wood handrails top and bottom |
| 25+92 | 18.30464 | -65.774624 | Handrail | Start - Replace 16 ft wood handrails top and bottom |
| 26+73 | 18.304788 | -65.774796 | Handrail | End - Handrail replacement |
| 27+76 | 18.304867 | -65.775042 | Handrail & Posts | Replace wood handrails and 3 - 4in x 4in wood posts, 24ft length total |
| 27+96 | 18.304885 | -65.775101 | No Work | control point |
| 28+05 | 18.30490 | -65.775123 | Handrail, Landslide Removal & Tread Repair | Start - Wood handrail replacement. |
Start of landlide 8 ft past end of rail, remove approx. 50 cy of material and re-establish trail
| 28+76 | 18.304955 | -65.775276 | Handrail | End - Remove and replace wood handrail and posts |
| 33+10 | 18.304975 | -65.776229 | Reroute | Start trail reroute around landslide |
| 33+45 | 18.304892 | -65.776215 | Reroute | End Trail Reroute around landslide |
| 34+10 | 18.304771 | -65.776096 | Handrail, Landslide Removal | Repair 2 concrete post and secure GSP rails |
Remove 50 cy landslide materil from trail
| 35+75 | 18.304445 | -65.772988 | No Work | CP62 |
| 36+60 | 18.304259 | -65.775911 | Tread Repair | Start remove concrete and replace with gravel on geogrid and eliminate outslope |
| 37+52 | 18.304134 | -65.775691 | Tread Repair | CP 63 |
End remove concrete and replace with gravel on geogrid and eliminate outslope
| 38+02 | 18.304001 | -65.775716 | No Work | CP64 |
| 42+05 | 18.303630 | -65.77654 | Handrail | Weld new GSP handrail to existing for distance of 12 ft, offset toward trail min of 8 inches to a max of 16 inches to close gap between existing rail and edge of trail |
| 43+24 | 18.303360 | -65.77672 | Handrail | Secure wood railing to existing post |
| 44+16 | 18.303458 | -65.776859 | Handrail | Repair break in GSP rail |
| 44+47 | 18.303429 | -65.776936 | Handrail & Posts | Repair top of 2 posts |
Replace top 8 ft GSP rail 44+59 18.303420 -65.77696 Tread, Handrail & Posts Grout 2ft x 4in x 16in crack in concrete slab, Replace 5 ft GSP rail.
Repair top of concrete post Replace 2-6ft GSP rails (top and bottom)
| 45+28 | 18.303320 | -6577704 | Handrail & Posts | Replace 2-12ft GSP rails, 1-8ft rail, 2-6ft rails (top & bottom), and 2 concrete posts |
| 45+93 | 18.30575 | -65.777519 | No Work | Intersection with La Mina Trail |
| All wood handrail 2" x 6" | ||||
| All GSP handrail 2" |